W911WN-16-T-8012_0002.doc
DOC document 55 KB Posted
- Attached to
- HVAC Replacements at Berlin Lake, Shenango River Lake, and Tionesta Lake (Multiple Awards)
- Solicitation number
- W911WN-16-T-8012
About this file
Amendment 02
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised_Berlin_Specifications_-_AMENDED_02_August_2016.pdf | ||
| Revised_Shenango_Specifications_-_AMENDED_02_August_2016.pdf | ||
| W911WN-16-T-8012-0001.pdf | ||
| Berlin_-_Drawings.pdf | ||
| Berlin_-_Quality_Control_Plan.docx | DOCX document | |
| Tionesta_-_Drawings.pdf | ||
| W911WN-16-T-8012.pdf | ||
| Tionesta_-_Specifications.docx | DOCX document | |
| Berlin_-_Specifications.docx | DOCX document | |
| Shenango_-_Specifications.docx | DOCX document | |
| Berlin_-_Accident_Prevention_Plan.docx | DOCX document | |
| Shenango_-_Accident_Prevention_Plan.docx | DOCX document | |
| Shenango_-_Quality_Control_Plan.docx | DOCX document | |
| Tionesta_-_Quality_Control_Plan.docx | DOCX document | |
| Tionesta_-_Accident_Prevention_Plan.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The following specifications have been revised (changes are in Bold and Underlined Font) and are attached to this amendment:
Shenango River Lake Replace HVAC System at Resource Managers Office
Berlin Lake Replacement of HVAC System in Resource Managers Office, Maintenance Building, and Ranger Station
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 1002
The CLIN description has changed from BERLIN RMO HVAC REPLACEMENT to BERLIN LAKE HVAC REPLACEMENT.
The CLIN extended description INCLUDES HVAC REPLACEMENT FOR THE RMO AND MAINTENANCE BUILDING has been added.
CLIN 3002
The CLIN extended description INCLUDES FUEL TANK DEMOLITION AND DISPOSAL has been added.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
ADDENDUM TO SECTION 00800
00800-1 WAGE RATES
Berlin General Decision Number: OH160111 07/08/2016 OH111
Superseded General Decision Number: OH20150111
State: Ohio
Construction Types: Building
Counties: Mahoning County in Ohio http://www.wdol.gov/wdol/scafiles/davisbacon/OH111.dvb?v=7
Shenango
General Decision Number: PA160121 07/29/2016 PA121
Superseded General Decision Number: PA20150121
State: Pennsylvania
Construction Types: Building
Counties: Mercer County in Pennsylvania http://www.wdol.gov/wdol/scafiles/davisbacon/PA121.dvb?v=9
Tionesta
General Decision Number: PA160075 07/29/2016 PA75
Superseded General Decision Number: PA20150075
State: Pennsylvania
Construction Types: Building
Counties: Forest County in Pennsylvania http://www.wdol.gov/wdol/scafiles/davisbacon/PA75.dvb?v=8
00800-2 REQUIRED INSURANCE
a. The Contractor shall procure and maintain during the entire period of performance under this contract, the following minimum insurance (See also the clause of the contract entitled “Insurance – Work on a Government Installation”).
| Type |
| Bodily Injury |
| Property Damage |
| Comprehensive General |
| $500,000 per occurrence |
| $100,000 |
| Liability |
| $200,000 each person |
| Automotive Liability |
| $500,000 per occurrence |
| $20,000 |
| Workmen’s Compensation and Employer’s Liability |
| $100,000 in Pennsylvania |
As legally required by the state of OH
b. The Contracting Officer will notify the Contractor of any noncompliance with the foregoing provisions.
The Contractor shall, after receipt of such notice, immediately comply. Such notice, when delivered to the
Contractor or his representative at the site or mailed to the Contractor's address, will be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until the Contractor complies. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor. Compliance with the provisions of this article by subcontractors will be the responsibility of the Contractor.
c. Longshoreman and Harbor Worker’s Insurance MAY be required for this work. Please consult with your insurance carrier and applicable statutes (33 USC 901, et. Seq.).
00800-3 SAFETY AND HEALTH REQUIREMENTS MANUAL
A copy of the current US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and its changes are available at http://www.usace.army.mil/CESO/pages/home.aspx. The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
00800-4 COPYING, DISSEMINATION, OR DISTRIBUTION OF INFORMATION
Those who disseminate information contained on this CD-ROM or in the solicitations and/or drawings must ensure that the recipients have a legitimate need for the information and maintain a record of each recipient. Legitimate need means recognized business identities seeking to do business, or have business, with the Government as prime contractors, subcontractors, or suppliers. You shall maintain a record of the following information on each recipient: Business name and address, DUNS Number and IRS Tax ID Number, and name and telephone number of the person receiving the information.
00800-5 REIMBURSEMENT FOR PAYMENT BOND PREMIUMS
a. In order to ensure that sufficient funds have been set-aside for reimbursement of payment bond premiums, bidders shall insert Bid Item 0001, an appropriate not-to-exceed dollar amount in Bid Item No. 0001 will cause the bid to be rejected as non-responsive.
b. The Contractor shall be reimbursed the actual bond costs only, as established by evidence of full payment to the surety, up to the dollar amount set forth in Bid Item No. 0001. In no case will the Contractor be reimbursed an amount which exceeds the dollar amount set forth in Bid Item No. 0001.
c. The Government will reimburse only the Prime Contractor for the actual paid bond premiums. The Government will not reimburse any subcontractor’s paid bond premiums.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .