Berlin_-_Drawings.pdf
PDF 43 KB Posted
- Attached to
- HVAC Replacements at Berlin Lake, Shenango River Lake, and Tionesta Lake (Multiple Awards)
- Solicitation number
- W911WN-16-T-8012
About this file
Berlin - Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN-16-T-8012_0002.doc | DOC document | |
| Revised_Berlin_Specifications_-_AMENDED_02_August_2016.pdf | ||
| Revised_Shenango_Specifications_-_AMENDED_02_August_2016.pdf | ||
| W911WN-16-T-8012-0001.pdf | ||
| Berlin_-_Quality_Control_Plan.docx | DOCX document | |
| Tionesta_-_Drawings.pdf | ||
| W911WN-16-T-8012.pdf | ||
| Tionesta_-_Specifications.docx | DOCX document | |
| Berlin_-_Specifications.docx | DOCX document | |
| Shenango_-_Specifications.docx | DOCX document | |
| Berlin_-_Accident_Prevention_Plan.docx | DOCX document | |
| Shenango_-_Accident_Prevention_Plan.docx | DOCX document | |
| Shenango_-_Quality_Control_Plan.docx | DOCX document | |
| Tionesta_-_Quality_Control_Plan.docx | DOCX document | |
| Tionesta_-_Accident_Prevention_Plan.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLEARANCES
RECOMMENDED
MAINTAIN MFG
NEW HEAT PUMP
NEW FUEL LINE NEW PROPANE TANK
NEW CONCRETE PAD
DEMOLISHED
FURNACE TO BE
BE REMOVED AND CAPPED AT TANK
EXISTING OIL PIPING TO
EXISTING OIL TANK TO BE ABANDONED
PIPES
REFRIGERANT
NEW
NEW FURNACE
INDOOR COIL
NEW
BASEMENT
BASEMENT
10’-0" MIN.
BUILDING SHALL BE
PROPANE TANK AND
DISTANCE BETWEEN
FURNACE ROOM
BASEMENT LEVEL: NEW WORK MECHANICAL PLAN
BASEMENT LEVEL: DEMOLITION MECHANICAL PLAN
ROOM
FURNACE
RESOURCE MANAGERS OFFICE MECHANICAL SKETCH
| SofW SketchA |
| References |
| G-BSAD_A.DGN |
File details come from the government source that posted it. Updated .