W911WN-16-B-8009-0001.pdf

PDF 227 KB Posted

Attached to
Repair Bulkhead Hoist at Tygart Dam
Solicitation number
W911WN-16-B-8009
Issued by

About this file

W911WN-16-B-8009 Amendment 0001

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET461387723

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RE: TYGART RIVER LAKE BULKHEAD HOIST REPAIRS, GRAFTON, WV

The purpose of this amendment is to:1) Provide responses to questions submitted; 2) Provide the List of Attendees to the organized site visit held on July 26, 2016 and 3) Furnish updates to the Technical Specifications.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-16-B-8009

X 9B. DATED (SEE ITEM 11)

15-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Aug-2016

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-RC-P

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN-16-B-8009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RESPONSES TO QUESTIONS

Tygart Dam Bulkhead Hoist Repairs Questions and Answers

Q1. When does the level of the lake go below 1039.5, and how long does it normally stay at that level?

A1. Section 01 35 00.00 08 SPECIAL PROCEDURES, paragraph 1.13 POOL LEVELS references a chart for normal elevation based on actual recorded lake levels. The chart was omitted from the package, but is included in Amendment 0001. The graph shows typical pool levels throughout the year based on historical data for the period January 1981 through December 2010.

Q2. Can both bulkheads be removed for repair and for how long can they be off site?

A2. No. One bulkhead must remain available for use. Section 05 12 00 STRUCTURAL STEEL, paragraph

BULKHEAD REHABILITATION has been revised to clarify this and to add that the riveted bulkhead must be repaired first, followed by the welded bulkhead.

Q3. Is there more information about the trash boom listed in (Specification Division 01, Section 01 35 00.00 08)

1.10.4?

A3. Additional information has been added to the specifications to describe the trash boom and its construction.

An additional requirement has been added to replace any fittings removed for movement of the trash boom with new stainless steel fittings.

Q4. How will each square foot of area to be painted be measured? Particularly small steel member and small areas to be painted. Industry standard is usually one square foot minimum per repair area. For instance if a rust spot is 4"x7", often an irregular shape, will it be paid at 0.2 SF or 1 SF? This can matter greatly on how these SF pay items are priced.

A4. Anchorages will be measured by each, consisting of the anchorage plate, bolts, and adjacent area of welded members. Only repair of existing paint coating on structural members will be measured by the square foot.

In most situations, this work will consist of cleaning and painting structural members (beams, angles, gusset plates, etc.). These will probably be areas larger than 1 SF, however, the specification has been revised to consider the minimum repair to be 1 SF for measurement purposes.

Q5. Can an additional site visit be arranged?

A5. An additional organized site visit will not be scheduled at this time. Individuals desiring to view the site may email their request to ryan.moore@usace.army.mil. Access to the Tygart Lake dam is not guaranteed and is dependent on availability of USACE personnel. Questions will neither be solicited nor answered should this additional site visit occur.

Q6. Will we receive a copy of the pre-bid sign-in sheet?

A6. A copy of the pre-bid conference sign-in sheet is being made available as part of this Solicitation

Amendment.

Q7. Can the AISC certified fabrication shop be waived for this work? The canopy construction and the bulkhead saddle modification can be done locally and save the Corps some costs. Keeping AWS inspection of course.

A7. The requirement for AISC certified fabrication shop has been deleted.

Q8. What is the intent of the delivery barge in section 1.6 Lifting Plan, Page 3 section 01 73 19.00 08? Is it expected that the new bulkhead will be delivered into in final installation by barge?

A8. This was an error in the specification. A revised section 01 73 19.00 08 is included in this Amendment.

Q9. Can we use the existing hoist monorail and other hoist platform structure to access and rig the bulkhead guides?

A9. The existing hoist monorail and other hoist platform structure may be used, however, a plan for the intended and applicable calculations, signed by a registered Professional Engineer, must but be submitted for approval prior to performing the work. This shall be included in the Construction Site Plan Submittal.

Q10. Can a floating plant platform be anchored to the bulkhead guides to keep the access and containment stable?

A10. Mooring rings are provided on the upstream face of the dam as noted in Section 01 35 00.00 08 SPECIAL

PROCEDURES and have been used for mooring floating plant in the past

SITE VISIT ATTENDEES

SECTION 00010 - SOLICITATION CONTRACT FORM

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Tygart Dam Bulkhead Hoist Repairs Technical Specifications

176 02-MAY-2016

Attachment 2 Tygart Dam Bulkhead Hoist Repairs Plans

41 23-MAY-2016

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Tygart Dam Bulkhead

Hoist Repairs Technical Specifications

176 02-MAY-2016

Attachment 2 Tygart Dam Bulkhead Hoist Repairs Plans

41 23-MAY-2016

Attachment 3 Revised Tech Specification, Division 01, Section 01 35 00.00

1 04-AUG-2016

Attachment 4 Revised Tech.

Specification, Division 01, Section 01 22 00.0

8 04-AUG-2016

Attachment 5 Revised Tech.

Specification, Division 05, Section 05 12 00

10 04-AUG-2016

Attachment 6 Revised Tech.Specification, Division 01, Section 01 73 19.00

3 04-AUG-2016

(End of Summary of Changes)