Revised_Technical_Specification _Division_01 _Section_01_73_19.00_08 _Govt_Furnished_Property.pdf
PDF 13 KB Posted
- Attached to
- Repair Bulkhead Hoist at Tygart Dam
- Solicitation number
- W911WN-16-B-8009
About this file
Revised Technical Specification Division 01 Section 01 73 19.00 08 Government Furnished Property
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bulkhead Hoist Repairs
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 73 19.00 08
GOVERNMENT-FURNISHED PROPERTY
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SUBMITTALS
1.4 GOVERNMENT-FURNISHED PROPERTY
1.5 INSPECTION OF GOVERNMENT-FURNISHED PROPERTY
1.6 LIFTING PLAN
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 GENERAL
3.2 DELIVERY AND LOADING OF HOIST
3.2.1 General
3.2.2 Storage
-- End of Section Table of Contents --
SECTION 01 73 19.00 08 Page 1 Certified Final Tech. Spec.- RTA W911WN-16-B-8009 Amend 0001
SECTION 01 73 19.00 08
GOVERNMENT-FURNISHED PROPERTY
PART 1 GENERAL
1.1 SUMMARY
The Government has purchased a new bulkhead hoist. The Contractor shall be responsible for relocating the existing bulkhead hois et and installing the new hoist. The hoist is is located at Pittsburgh Engineer Warehouse and Repair Shops (PEWARS), 3500 Grand Avenue, (Neville Island), Pittsburgh, PA 15225.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Lifting Plan; G, RO
A plan describing in detail the proposed methods of lifting of the bulkhead hoist as specified in paragraph LIFTING PLAN.
Condition Report; G, RO
1.4 GOVERNMENT-FURNISHED PROPERTY
The following materials and fabricated items will be furnished by the Government at the specified location.
[ ] Yale Model FEW15-146RT 1854, 15-ton monorail hoist.
1.5 INSPECTION OF GOVERNMENT-FURNISHED PROPERTY
The Contractor shall perform a detailed inspection of the Government-furnished property prior to off-loading from the storage or delivery barges. The Contractor shall and prepare a Condition Report that identifies each item, the current condition, repairs required prior to installation, and any missing or unusable items. The Contracting Officer
SECTION 01 73 19.00 08 Page 2 shall be notified to resolve any discrepancies.
1.6 LIFTING PLAN
A plan for lifting of bulkhead hoist and hoist rail shall be submitted.
The plan shall address equipment, lifting devices, and rigging poffloading offloading the items to and from the truck from the delivery barge and for installation. The plan shall be submitted at least 60 calendar days prior to proposed lifting of the items. The Government reserves the right to revise and/or alter the Contractor's lifting plan.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL
All operations for loading and transporting the various items of Government-furnished materials and equipment shall be performed in accordance with the requirements of EM 385-1-1 . Unless otherwise specified, the Contractor shall be responsible for furnishing all labor, equipment, and supplies required for loading, transporting, and unloading the equipment.
3.2 DELIVERY AND OFF- LOADING OF VERTICAL LIFT GATES HOIST
3.2.1 General
The Government will load the hoist chains onto the Contractor's truck at PEWARS. The Contractor shall notify the Contracting Officer at least 30 days prior to the date of delivery. The Contractor shall notify the Contracting Officer at least 48 hours prior to the approximate time of delivery of the truck for loading. The Contractor shall be responsible for unloading the items at the project site.
3.2.2 Storage
The Contractor shall be responsible for storage of the items from the time they are delivered to the Contractor until they are installed.
-- End of Section --
SECTION 01 73 19.00 08 Page 3
| 01 73 19.00 08 - GOVERNMENT-FURNISHED PROPERTY |
| 01 73 19.00 08 - GOVERNMENT-FURNISHED PROPERTY |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 GOVERNMENT-FURNISHED PROPERTY |
| 1.5 INSPECTION OF GOVERNMENT-FURNISHED PROPERTY |
| 1.6 LIFTING PLAN |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL |
| 3.2 DELIVERY AND OFF- LOADING OF VERTICAL LIFT GATESHOIST |
| 3.2.1 General |
| 3.2.2 Storage |