Technical_Specifications.pdf

PDF 6 MB Posted

Attached to
Sawcutting for new maintenance bulkhead recesses at Montgomery Locks and Dam
Solicitation number
W911WN16B0001
Issued by

About this file

Technical Specifications

View the file

Other files

File Type Posted
BidResultsfor16B0001.docx DOCX document
W911WN-16-B-0001-0002.pdf PDF
W911WN-16-B-0001-0001.pdf PDF
PLANS.pdf PDF
W911WN-16-B-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911WN-16-B-0001

Sawcutting for New Maintenance Bulkhead Recesses Montgomery Locks and Dam Ohio River, PA

October 2015 Certified Final Documents RTA – W911WN-16-B-0001 Technical Specifications

Montgomery L/D - Maintenance Bulkhead Recess Sawcutting

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 13.00 08 SUMMARY OF WORK

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 32 17 CONSTRUCTION PROGRESS SCHEDULE

01 32 23.00 08 SURVEY AND ALIGNMENT CONTROL

01 32 33.00 08 DIGITAL PROGRESS IMAGES

01 33 00 SUBMITTAL PROCEDURES

01 35 00.00 08 SPECIAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01.00 08 USACE QUALITY CONTROL

01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 78 02.00 20 CLOSEOUT SUBMITTALS (AS-BUILT DRAWINGS)

DIVISION 02 - EXISTING CONDITIONS

02 41 16 WIRE SAWING

DIVISION 05 - METALS

05 50 04 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED

ITEMS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1 Certified Final RTA - W911WN-16-B-0001

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 13.00 08

SUMMARY OF WORK

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

1.1.1 Concrete Saw Cutting

1.1.1.1 Alternative Cutting Methods

1.1.2 Steel Cutting

1.1.3 Miscellaneous Steel and Reinforcement

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 13.00 08 Page 1

SECTION 01 11 13.00 08

SUMMARY OF WORK

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

The work is located at Montgomery Locks and Dam, Ohio River, Beaver County, Pennsylvania. The work is located on the Land Wall and Middle Wall, upstream of the upstream miter gates at the boule dam location and downstream of the downstream miter gates at the poiree dam location. The site of the work may be reached from state and local roads and streets, however, floating plant support may be required for some features of the work.

The general description of the work is to furnish all equipment, labor, layout of work, and supervision to saw cut concrete of the monoliths in the 110-FT Chamber to support the future installation of Maintenance Bulkhead Slots.

This work includes saw cutting of concrete and embedded items to the extent shown in the plans. The saw cuts will be from the top of the monolith to the elevation shown on the drawings. Portions of this work will occur underwater.

Photographs of the work area are included in the attached Wiresawing - Reference Photos.

1.1.1 Concrete Saw Cutting

All concrete saw cutting work will be performed in the 110-FT by 600-FT chamber, specifically at the monoliths adjacent to the boule dam sill and poiree dam sill in the 110-ft Chamber. The work will involve both vertical and horizontal saw cutting of concrete. The approximate dimensions to be saw cut are shown on the attached drawings. Concrete wire sawing operations shall be as specified in Section 02 41 16 WIRE SAWING.

1.1.1.1 Alternative Cutting Methods

At the Contractor's option, and subject to the approval by the Contracting Officer, only the back and bottom cuts may be made by methods other than saw cutting. If alternative cutting methods are used, the tolerances specified in Section 02 41 16 WIRE SAWING, paragraph Tolerances for Wire Sawing Operations shall apply to the centerline of the cutting for the back cut, and maximum concrete removal shall not exceed 1-inch beyond the indicated removal line. For the bottom cut, the tolerances shall apply to the extreme edge of the cut area, and concrete removal shall not extend below Elevation 649.92 at the downstream location or Elevation 665.25 at the upstream location. All requirements for containment and disposal of debris, waste water, and other materials shall apply as specified.

1.1.2 Steel Cutting

Existing corner protection and wall armor on the chamber face of the lock wall shall be cut at the locations of the proposed concrete sawing and in a

SECTION 01 11 13.00 08 Page 2 matter that facilitates the concrete sawing.

1.1.3 Miscellaneous Steel and Reinforcement

All concrete that is to be cut shall be assumed to have typical steel reinforcement as shown on the Reference Drawings. Form ties, abandoned pipes and other embedded metals may also be encountered in the concrete.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

NOT USED

-- End of Section --

SECTION 01 11 13.00 08 Page 3

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 JOB PAYMENT ITEMS

1.1.1 Sawcutting at Bulkhead Recesses

1.1.1.1 Payment

1.1.1.2 Unit of Measure

1.1.1.3 Payment Item

1.2 UNIT PRICE PAYMENT ITEMS

1.2.1 Digital Progress Images

1.2.1.1 Payment

1.2.1.2 Measurement

1.2.1.3 Unit of Measure

1.2.1.4 Payment Items

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 1

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work that are not specifically mentioned to be included in a particular job or unit price payment item shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1.1 Sawcutting at Bulkhead Recesses

1.1.1.1 Payment

Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs for concrete wire sawing and metal saw cutting necessary to accomplish the work as specified, fabricating and furnishing and installing the Stability system, including drilling and sawcutting as required. Payment for this item shall also include costs for performing surveys; all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract. Payment shall include, but not be limited to, all costs for drilling horizontal and vertical holes through concrete, wire sawing concrete to the dimensions/tolerances shown on the drawings, saw cutting necessary embedded metal items (corner protection, wall armor, reinforcing steel, etc.), fabrication and installation of the block support systems, verification of accuracy of large diameter core holes for lifting device, and disposal of debris resulting from saw cutting operations. Removal and disposal of the concrete blocks and associated metal items is not included in this contract.

1.1.1.2 Unit of Measure

Unit of measure: Job.

1.1.1.3 Payment Item

0003 SAWCUTTING AT UPSTREAM BULKHEAD RECESSES

0004 SAWCUTTING AT DOWNSTREAM BULKHEAD RECESSES

1.2 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract progress payments will be based are listed in the PRICE SCHEDULE and described below. The unit price and payment made for each item listed shall

SECTION 01 22 00.00 10 Page 2 constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.2.1 Digital Progress Images

1.2.1.1 Payment

Payment shall constitute full compensation for all labor, equipment, material and supply costs for furnishing monthly digital progress images as specified in Section 01 32 33.00 08 DIGITAL PROGRESS IMAGES.

1.2.1.2 Measurement

Measurement will be made of the number of months that sets of photographs are taken and delivered to the Contracting Officer as approved or directed by the Contracting Officer or his authorized representative. Each set shall consist of all specified hardcopies and electronic copies for each photographic session as specified in Section 01 32 33.00 08 DIGITAL

PROGRESS IMAGES.

1.2.1.3 Unit of Measure

Unit of Measure: Sets

1.2.1.4 Payment Items

0002 DIGITAL PROGRESS IMAGES, MONTHLY

SECTION 01 22 00.00 10 Page 3

DIVISION 01 - GENERAL REQUIREMENTS

01 32 17

CONSTRUCTION PROGRESS SCHEDULE

PART 1 GENERAL

1.1 SUBMITTALS

1.2 QUALIFICATIONS

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.2 MONITORING CONSTRUCTION PROGRESS

3.3 PROGRESS SCHEDULE - BAR CHART SCHEDULE

-- End of Section Table of Contents --

SECTION 01 32 17 Page 1

01 32 17

CONSTRUCTION PROGRESS SCHEDULE

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Bar Chart Schedule; G, AO

1.2 QUALIFICATIONS

The Contractor must designate an authorized representative who shall be responsible for the preparation of all required project schedule reports.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Pursuant to Section 00700 CONTRACT CLAUSES, FAR 52.236-15 SCHEDULE FOR CONSTRUCTION CONTRACTS, a Project Schedule as described below shall be prepared. The scheduling of construction shall be the responsibility of the Contractor. Contractor management personnel shall actively participate in its development. Subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule. A bar chart shall be prepared in accordance with paragraph PROGRESS SCHEDULE - BAR CHART. The schedule shall be submitted within 20 days after receipt of Notice to Proceed.

3.2 MONITORING CONSTRUCTION PROGRESS

The schedule shall be the basis for measuring Contractor progress. Lack of an approved schedule or scheduling personnel will result in an inability of the Contracting Officer to evaluate Contractor's progress. Failure of the Contractor to provide all information, as specified below, shall result in the disapproval of the entire Project Schedule submission and the inability of the Contracting Officer to evaluate Contractor progress for payment purposes. In the case where Project Schedule revisions have been directed by the Contracting Officer and those revisions have not been included in the Project Schedule, the Contracting Officer may hold retainage up to the maximum allowed by contract, each payment period, until revisions to the Project Schedule have been made.

3.3 PROGRESS SCHEDULE - BAR CHART SCHEDULE

The progress chart to be prepared by the Contractor pursuant to Section

SECTION 01 32 17 Page 2

00700 CONTRACT CLAUSE, 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS shall consist of a bar chart as described herein. In preparing this schedule, the scheduling of construction is the responsibility of the Contractor and contractor management personnel shall actively participate in its development. The chart may be prepared in a format proposed by the Contractor and approved by the Contracting Officer. Each activity shall include the applicable Price Schedule item number and show the estimated cost. The chart shall be prepared in sufficient detail to clearly show the Contractor's planned progress and the relationship of the various items of work. Larger activities shall be broken down into smaller activities with clearly defined limits (i.e. Excavation between STA xx and STA yy). In general, the estimated cost of any individual activity should not exceed $50,000. The selection and number of activities shall be subject to the Contracting Officer's approval. The chart shall be updated monthly to show actual progress and percentage of work completed for each activity. The Contractor must submit, as part of his monthly request for payment, updated copies of his progress schedule identifying the work completed during the reporting period. If the Government issues changes to the existing work or adds additional work items to the contract, the Contractor must revise his progress schedule accordingly. All costs associated with revising the schedule shall be included as part of the modification of the contract. If the Contractor's progress falls behind his planned work effort, a revised schedule shall be furnished to show how the Contractor proposes to complete the remaining work within the contract time. If the Contractor fails to submit updates as required, the Contracting Officer may withhold approval of partial payment estimates, until such submittals are made.

-- End of Section --

SECTION 01 32 17 Page 3

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 32 23.00 08

SURVEY AND ALIGNMENT CONTROL

PART 1 GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 SUBMITTALS

1.4 GENERAL REQUIREMENTS

1.4.1 Existing Project Survey Control

1.4.2 Contractor Survey Controls

1.4.3 Responsibilities

1.5 QUALIFICATIONS AND EXPERIENCE

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 PROCEDURES AND METHODOLOGIES

3.2 SURVEYS

-- End of Section Table of Contents --

SECTION 01 32 23.00 08 Page 1

SECTION 01 32 23.00 08

SURVEY AND ALIGNMENT CONTROL

PART 1 GENERAL

1.1 SUMMARY

This section addresses the overall project survey control and procedure requirements to meet all survey/positional accuracy requirements for this Contract.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-1-1003 (2011) NAVSTAR Global Positioning System Surveying

EM 1110-1-1005 (2007) Control and Topographic Surveying

EM 1110-2-1009 (2002) Structural Deformation Surveying

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Chief Surveyor; G, AO

Survey Plan; G, AO

The Contractor must submit a detailed plan showing the equipment, calibration records, field data collection and data processing procedures, and QC procedures.

Survey Information; G, AO

Bulkhead Recess Control Plan; G, DO

The Contractor shall submit interim data on the establishment of the centerline of the bulkhead recesses based on preliminary locations established on site. The information shall be submitted per requirements as detailed on the contract drawings. The control plan shall be submitted and reviewed by the Government prior to starting installation of the survey monuments for the final centerline location.

SECTION 01 32 23.00 08 Page 2

Final Survey Data; G, DO

The Contractor shall submit final survey data, with information as required on the contract drawings. Survey information shall be submitted in a legible format, on a plan sheet, with annotations and descriptions to clearly describe each data point. A copy of the field book entry shall also be included in the submittal.

Monument Protection Plan; G, DO

The Contractor shall submit a plan to protect existing monuments in the vicinity of the work the work limits. The plan shall detail methods to work around the monuments, and any protective measures which will be incorporated to ensure the integrity of the monument.

1.4 GENERAL REQUIREMENTS

1.4.1 Existing Project Survey Control

Existing horizontal and vertical control to be used for all construction layout is shown on the contract drawings.

1.4.2 Contractor Survey Controls

All new work to be constructed under this Contract shall be constructed based on the survey control established by Government and shown on the drawings. The Contractor must establish the project baselines shown and any other temporary survey control as may be necessary to carry out the requirements of this Contract. Any and all temporary control set by the Contractor must be based off the existing project control, as shown on the drawings. The Contractor must verify the horizontal and vertical positions of the existing project control. Any questions or problems concerning the survey control shall be directed to the Contracting Officer.

1.4.3 Responsibilities

The Contractor has the overall responsibility to determine the procedures, equipment, and methodologies to perform all survey requirements outlined in these plans and specifications. The Government has the right to review and approve all survey plans but approval does not relieve the Contractor of the responsibility to satisfy all positional accuracy and tolerance requirements of these plans and specifications.

1.5 QUALIFICATIONS AND EXPERIENCE

The Contractor must have a Licensed Professional Land Surveyor on staff who will be responsible for all survey work performed as part of this Contract, designated as the Chief Surveyor. This Licensure requirement can be satisfied by a current registration in good standing as a Surveyor in a U.S. State, Territory, or the District of Columbia obtained by written examination. The Chief Surveyor shall have a minimum total of 10 years of surveying experience, at least 3 of which shall be experience in vessel mounted or stationary hydrographic/bathymetric surveying. The qualifications shall show that this individual has held the position of Chief Surveyor on at least one previous inland marine or offshore project of similar size and complexity. All surveying work shall be performed by qualified surveyors as approved by the Contracting Officer. All surveying

SECTION 01 32 23.00 08 Page 3 work shall be reviewed by the Chief Surveyor.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 PROCEDURES AND METHODOLOGIES

The Contractor must use the appropriate survey equipment and procedures as deemed necessary to meet or exceed the positional accuracy requirements called for throughout this contract. The Contractor will be required to submit survey plan throughout this Contract in accordance with other technical sections of this specification. The survey plan shall include the Contractor's proposed methodology of acquiring the required survey information prior to starting the wiresawing or coring portion of the work. Provide the schedule of the survey work in relation to the physical wiresawing work required under the contract.

3.2 SURVEYS

All surveys performed as part of this Contract shall be conducted in accordance with EM 1110-1-1003, EM 1110-1-1005, and EM 1110-2-1009. Where requirements in other sections of these specifications exceed those outlined in the referenced EMs, the requirements in these specifications shall take precedence over any EM's and the Contractor shall be required to establish a plan to meet or exceed the requirements.

The Contractor shall perform surveys to establish the centerline of the bulkhead recesses and establish new monuments in accordance with the procedures defined on contract drawings S-1180 and V-1131. The Government will determine the actual centerline based on the survey data provided by the Contractor.

The Contractor shall also perform surveys to determine elevations at the locations indicated on contract drawing S-2182.

Submit survey information as required on the contract drawings S-1240, S-1241, and S-1242. Survey data shall be submitted by the date specified in Section 00800 SPECIAL CONTRACT PROVISIONS 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984). Survey information shall be submitted in a legible format on a plan sheet, with annotations to clearly describe each required portion of the work. After the centerline location has been determined, new monuments shall be established in accordance with Drawings S-1240 and S-1241 and as specified in Section

05 50 04 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED ITEMS.

-- End of Section --

SECTION 01 32 23.00 08 Page 4

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 32 33.00 08

DIGITAL PROGRESS IMAGES

PART 1 GENERAL

1.1 SCOPE

1.2 SUBMITTALS

1.3 GENERAL REQUIREMENTS

1.3.1 Description

1.3.2 Photographer Qualifications

1.3.3 Digital Photographs

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 EQUIPMENT

3.2 PHOTOGRAPHY

-- End of Section Table of Contents --

SECTION 01 32 33.00 08 Page 1

SECTION 01 32 33.00 08

DIGITAL PROGRESS IMAGES

PART 1 GENERAL

1.1 SCOPE

The work under this section includes furnishing digital photographs showing the progress of the construction operations throughout the contract period.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having an "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Photographer Qualifications; G, AO

Information on photographers experience and qualifications shall be submittal for approval by the Contracting Officer.

SD-11 Closeout Submittals

Thumbnail Hard Copy Prints of Progress Images; G, AO Glossy Prints of Selected Official Progress Images; G, AO Electronic Copy of Selected Official Progress Images; G, AO Electronic Copy of All Other Progress Images; G, AO

Copies of digital progress images in electronic form and hard copy form shall be submitted monthly for approval in accordance with paragraph PHOTOGRAPHY. Progress images shall be submitted in a timely manner as coordinated with the Contracting Officer.

1.3 GENERAL REQUIREMENTS

1.3.1 Description

The Contractor must, during the progress of the project (including progress of fabrication), furnish the Contracting Officer progress photographs taken by a professional photographer to depict progress of construction throughout the life of the contract. The photographs shall be taken using digital photography equipment furnished by the Contractor.

Electronic copies of approved photographs shall be furnished on CD-ROM or other storage media as approved by the Contracting Officer.

1.3.2 Photographer Qualifications

The photographer shall be a professional photographer with experience in photography for documentation of construction or industrial processes.

SECTION 01 32 33.00 08 Page 2

1.3.3 Digital Photographs

Digital photographs shall have a CCD resolution no less than 14.0 million pixels per image (4288 by 3216). The Contractor must furnish, using Microsoft Word 2007 or later version, a file with each set of photographs which lists the following identifying information for each photographic image:

Name and location of project Contract number Date taken Contractor (and subcontractor, if applicable) Orientation of view and brief description of work depicted

Each photograph shall be sequentially numbered. The identifying data shall be placed in the document accompanying the photographs. No identifying data, except the date stamp, shall appear on the photographs.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 EQUIPMENT

The Contractor shall be responsible for furnishing all photographic equipment to perform the work specified by this section. The camera shall have a CCD resolution no less than 14.0 million pixels per image (4288 by 3216) which will provide enough detail to print an 8" by 10" high-resolution photograph. The camera shall produce files that allows the user to download the images onto an IBM-compatible personal computer running Windows 7, and allow the images to be saved in TIFF (Tagged Image File Format) and shall also be submitted in JPEG (Joint Photographic Experts Group) formatQ4.

3.2 PHOTOGRAPHY

The Contractor must, during the progress of the work, furnish the Contracting Officer digitally produced progress photographs to depict the progress of the work, as applicable to show work in progress. All progress images shall be taken at the camera's highest resolution. In coordination with the Contracting Officer, furnish one set of progress photographs for each lock wall. Thumbnail Hard Copy Prints of Progress Images shall be submitted to the Contracting Officer for approval between the first and fifth day of each month. The Contracting Officer will select from the thumbnail views, unless directed otherwise, at least ten views to become official progress images. The selected official progress images shall be printed in color in 8" by 10" format, shall be identified on the back in accordance with paragraph Digital Photographs, and one set of prints shall be submitted for approval. Glossy Prints of Selected Official Progress Images and Electronic Copy of Selected Official Progress Images shall be furnished within ten days of approval of the thumbnail images. Electronic copies shall be furnished on CD-ROM with file of required photographic information. Electronic Copy of All Other Progress Images (including those not selected) shall be furnished on separate CD-ROM with file of required photographic information with the selected official progress images.

Digital photographs shall be taken continuously throughout each month in which work is in progress. Unless otherwise directed by the Contracting Officer, photographs will not be required for periods of time in which work is not being performed. Additional sets of photographs shall be taken as

SECTION 01 32 33.00 08 Page 3 directed by the Contracting Officer. Enough digital photographs shall be taken to adequately depict each phase of the work and shall show progress made during those phases and at the completion of the project. Digital photographs shall show work accomplished since the previous photographs.

Progress photographs shall be submitted as specified herein and in paragraph SUBMITTALS.

-- End of Section --

SECTION 01 32 33.00 08 Page 4

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

1.2.2 Approving Authority

1.2.3 Work

1.3 SUBMITTALS

1.4 SUBMITTAL CLASSIFICATION

1.4.1 Government Approved (G)

1.4.2 Information Only

1.5 PREPARATION

1.5.1 Transmittal Form

1.6 QUANTITY OF SUBMITTALS

1.6.1 Transmittal Form

1.6.2 Electronic File Format

1.7 INFORMATION ONLY SUBMITTALS

1.8 VARIATIONS

1.8.1 Considering Variations

1.8.2 Proposing Variations

1.8.3 Warranting That Variations Are Compatible

1.8.4 Review Schedule Is Modified

1.9 SUBMITTAL REGISTER

1.9.1 Use of Submittal Register

1.9.2 Contractor Use of Submittal Register

1.9.3 Approving Authority Use of Submittal Register

1.10 SCHEDULING

1.11 GOVERNMENT APPROVING AUTHORITY

1.11.1 Review Notations

1.12 DISAPPROVED SUBMITTALS

1.13 APPROVED SUBMITTALS

1.14 APPROVED SAMPLES

1.15 WITHHOLDING OF PAYMENT

1.16 STAMPS

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 33 00 Page 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractors shall check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders;

samples; O&M manuals (including parts list); certifications; warranties;

and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to or the start of the next major phase of the construction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work. Examples include the following:

Certificates of insurance

Surety bonds

List of proposed Subcontractors

SECTION 01 33 00 Page 2

List of proposed products

Construction progress schedule

Network Analysis Schedule (NAS)

Submittal register

Schedule of prices

Health and safety plan

Work plan

Quality Control(QC) plan

Environmental protection plan

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation. Examples include, but are not limited to, the following:

Investigation reports.

Daily logs and checklists.

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

SECTION 01 33 00 Page 3

Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications. Examples include, but are not limited to, the following:

Confined space entry permits.

Text of posted operating instructions.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.

Interim "DD Form 1354" with cost breakout for all assets 30 days prior to facility turnover.

1.2.2 Approving Authority

Office or designated person authorized to approve submittal.

1.2.3 Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Submittal Register; G, AO

1.4 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.4.1 Government Approved (G)

Within the terms of the Contract Clause entitled, "Specifications and Drawings for Construction," they are considered to be "shop drawings."

1.4.2 Information Only

They are not considered to be "shop drawings" within the terms of the

SECTION 01 33 00 Page 4

Contract Clause referred to above.

1.5 PREPARATION

1.5.1 Transmittal Form

Use the transmittal form (ENG Form 4025) sample, attached in Volume 2 ATTACHMENTS TO SPECIFICATIONS, for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.6 QUANTITY OF SUBMITTALS

Five copies of submittals and electronic files shall be submitted to:

Resident Engineer Upper Ohio Resident Office 3510 Grand Avenue Pittsburgh, PA 15225

1.6.1 Transmittal Form

Use the transmittal form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract.

Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.6.2 Electronic File Format

Provide submittals other than material samples in both hard copy (paper) and electronic formats. The electronic submittal file must be compiled as a single, complete document, to include the Transmittal Form described in Paragraph Transmittal Form. The electronic submittal file must be named specifically according to its contents (e.g. 01 45 00.00-1.2_Quality Control Plan.pdf).

Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic submittal documents fewer than 10MB to an email address as directed by the Contracting Officer. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:

SECTION 01 33 00 Page 5 https://safe.amrdec.army.mil/safe/

Provide hard copies of submittals as specified in this or other specification sections. Up to four additional hard copies of any submittal may be requested from the Contractor at the discretion of the COR, at no additional cost to the Government.

1.7 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.

The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;

and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.8 VARIATIONS

Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to Section 00700 CONTRACT CLAUSES, FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION and will be considered where advantageous to Government.

1.8.1 Considering Variations

Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).

Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.

1.8.2 Proposing Variations

When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.

Clearly mark the proposed variation in all documentation.

Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.

The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

SECTION 01 33 00 Page 6

1.8.3 Warranting That Variations Are Compatible

When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.8.4 Review Schedule Is Modified

In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.

1.9 SUBMITTAL REGISTER

Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and

(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. Maintain a submittal register for the project in accordance with Section 01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS). The Government will provide the initial submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage. A copy of the Submittal Register for this project is attached in Volume 2 ATTACHMENTS TO

SPECIFICATIONS.

Column (c): Lists specification section in which submittal is required.

Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.

Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.

Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.

1.9.1 Use of Submittal Register

Submit submittal register. Submit with QC plan and project schedule.

Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:

Column (a) Activity Number: Activity number from the project schedule.

Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.

Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.

SECTION 01 33 00 Page 7

Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.

1.9.2 Contractor Use of Submittal Register

Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor with each submittal throughout contract.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.

Column (l) List date of submittal transmission.

Column (q) List date approval received.

1.9.3 Approving Authority Use of Submittal Register

Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (l) List date of submittal receipt.

Column (m) through (p) List Date related to review actions.

Column (q) List date returned to Contractor.

1.10 SCHEDULING

Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Adequate time (a minimum of 30 calendar days exclusive of mailing time) shall be allowed and shown on the register for review and approval. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.

b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."

c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.

SECTION 01 33 00 Page 8

d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

1.11 GOVERNMENT APPROVING AUTHORITY

When approving authority is Contracting Officer, the Government will:

a. Note date on which submittal was received.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. Four copies of the approved submittal will be retained by the Contracting Officer and one copy of the submittal will be returned to the Contractor.

1.11.1 Review Notations

Contracting Officer review will be completed within 14 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" "or approved except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

1.12 DISAPPROVED SUBMITTALS

Contractor must make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under Section 00700 CONTRACT CLAUSES, FAR 52.243-4, CHANGES shall be given to the Contracting Officer.

Contractor shall be responsible for the dimensions and design of connection details and construction of work which are not detailed on the contract

SECTION 01 33 00 Page 9 drawings. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, the Contractor must make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.13 APPROVED SUBMITTALS

The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.

After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.14 APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor must assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at his expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.

Contractor must replace such materials or equipment to meet contract requirements.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.

1.15 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained.

SECTION 01 33 00 Page 10

1.16 STAMPS

Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:

| CONTRACTOR |

| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |

| SIGNATURE: __________________________________________________________ |

| TITLE: ______________________________________________________________ |

| DATE: _______________________________________________________________ |

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 33 00 Page 11

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 35 00.00 08

SPECIAL PROCEDURES

PART 1 GENERAL

1.1 GENERAL REQUIREMENTS

1.2 REFERENCES

1.3 SUBMITTALS

1.4 DRAWINGS

1.4.1 Contract Drawings

1.4.2 Reference Drawings

1.5 WORK UNDER OTHER CONTRACTS

1.5.1 Dam Gate Installation

1.5.2 Charleroi Locks and Dam Contractors

1.5.3 Government Work at Locks

1.6 ACCESS AND WORK AREAS

1.6.1 Access Plan

1.6.2 General Work Area Restrictions

1.6.3 Work Areas

1.6.4 Miter Gates

1.6.5 Lock Walls

1.6.6 Storage Areas

1.6.7 Placement of Equipment on Lock Walls

1.6.8 Time of Performance

1.6.9 Protection of Existing Roads and Property

1.6.9.1 General

1.6.9.2 Hauling Permits

1.6.10 Utilities

1.6.11 Protection of Grating

1.7 DAMAGE TO WORK

1.8 CONTRACTOR'S FLOATING PLANT

1.8.1 General

1.8.2 Floating Plant

1.8.3 Signal Lights

1.8.4 Maintenance of Floating Plant

1.8.5 Mooring of Floating Plant

1.8.6 Withdrawal of Equipment and Floating Plant