W911WN-15-B-0013-0001.pdf
PDF 1 MB Posted
- Attached to
- Site Development for Service Bridge Repairs at Loyalhanna Lake Dam, Westmoreland County, PA
- Solicitation number
- W911WN15B0013
About this file
Drawings Revised by Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Results.pdf | ||
| W911WN-15-B-0013-0003_PLANS.pdf | ||
| W911WN-15-B-0013-0003.pdf | ||
| W911WN-15-B-0013-0002.pdf | ||
| W911WN-15-B-0013-0001.pdf | ||
| Site_Visit_Attendees.pdf | ||
| W911WN-15-B-0013_PLANS.pdf | ||
| Certified_Final_RTA_-_Technical_Specifications.pdf | ||
| W911WN-15-B-0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
IP
P W
P :d m s
A O a a
G
A .d g n
H
T S
D B
A C
A U
G
:3
A O a a
G
A .d g n
.0
:1
L E
G E
N D
A B
B R
E V
IA
T
IO
N S A
N D
D R
A W
IN
G I
N D
E X
B
C R
A T
T Y
CIVIL
CONTRACT DRAWINGS
GENERAL
FILENAME
CODE
DWG.
ID NO.
SHEET
TITLE
G-0010
G-0011
AO38aa_100_G-0010
AO38aa_203_G-0011
SIGNATURE SHEET
AO38aa_204_G-1013 G-1013204
J
S H
IB
A T
A
A N
S I D s
B E
T H
L
S C
H N
E L
L E
R
P .E
PROJECT VICINITY AND LOCATION MAPS
LEGEND, ABBREVIATIONS AND DRAWING INDEX
SURVEY
PLAN - EXISTING SITE CONDITIONS AND CONTRACTOR WORK LIMITS
AO38aa_668_C-1001 668 C-1001 PLAN - PROPOSED SITE DEVELOPMENT
C-1002
C-1003
C-1004
C-1005
C-3006
C-3007
C-3008
C-3009
C-4010
AO38aa_668_C-1002 668
AO38aa_668_C-1003 668
AO38aa_668_C-1004 668
AO38aa_668_C-1005 668
AO38aa_668_C-3006 668
AO38aa_668_C-3007 668
AO38aa_668_C-3008 668
AO38aa_668_C-3009 668
AO38aa_668_C-4010 668
AO38aa_668_C-5011 668
AO38aa_668_C-5012 668 C-5012
AO38aa_668_C-5013 668 C-5013
AO38aa_668_C-5014 668 C-5014
C-5011
MISCELLANEOUS DETAILS
AO38aa_668_V-1001 100 V-1001 SURVEY CONTROL DRAWING
EROSION AND SEDIMENT CONTROL
AO38aa_565_X-0008 565 X-0008
X-0009565AO38aa_565_X-0009
X-5004565AO38aa_565_X-5004
X-5005565AO38aa_565_X-5005
X-5006565AO38aa_565_X-5006
X-5007565AO38aa_565_X-5007
PLAN OF SECTIONS
RANGE 19
US 5+50
US 10+05
US 12+90
US 14+65
US 16+35
US 18+00
US 19+70
US 21+30
US 23+20
US 25+20 SHEET 2 OF 2
US 25+20 SHEET 1 OF 2
PLAN OF SECTIONS AT DAM
125’ US OF DAM
175’ US OF DAM
50’ US OF DAM
V-1002100AO38aa_668_V-1002
M
G L
O W
C Z
E W
S K I
NEW MAIN ACCESS ROAD - PLAN AND PROFILE - SHEET 1 OF 2
NEW MAIN ACCESS ROAD - PLAN AND PROFILE - SHEET 2 OF 2
NEW SERVICE DOCK ACCESS LOOP - PLAN AND PROFILE - SHEET 1 OF 2
NEW SERVICE DOCK ACCESS LOOP - PLAN AND PROFILE - SHEET 2 OF 2
MAIN ACCESS ROAD - CROSS SECTIONS - STA 0+00 TO STA 1+25
MAIN ACCESS ROAD - CROSS SECTIONS - STA 1+50 TO STA 2+75
SERVICE DOCK ACCESS LOOP - CROSS SECTIONS - STA 0+25 TO STA 1+50
SERVICE DOCK ACCESS LOOP - CROSS SECTIONS - STA 1+75 TO STA 2+96
NEW SERVICE DOCK - PLAN AND SECTIONS
FENCE DETAILS
CHAIN-LINK FENCE GATE - DETAILS
NEW MAIN ACCESS ROAD - NEW PIPE GATE - DETAILS
NEW MAIN ACCESS ROAD AND SERVICE DOCK ACCESS LOOP - GEOMETRIC LAYOUT PLAN
PLAN - EROSION & SEDIMENTATION CONTROL - PHASE 1
PLAN - EROSION & SEDIMENTATION CONTROL - PHASE 2
PLAN - EROSION & SEDIMENTATION CONTROL - PHASE 3
EROSION AND SEDIMENT CONTROL PLAN - BMP DETAILS - SHEET 1 OF 4
EROSION AND SEDIMENT CONTROL PLAN - BMP DETAILS SHEET - 2 OF 4
EROSION AND SEDIMENT CONTROL PLAN - BMP DETAILS SHEET - 3 OF 4
EROSION AND SEDIMENT CONTROL PLAN - BMP DETAILS - SHEET 4 OF 4
EROSION & SEDIMENTATION CONTROL PLAN - STAGING OF CONSTRUCTION AND BMP SEQUENCING NOTES
EROSION & SEDIMENTATION CONTROL PLAN - BMP INSTALLATION NOTES
EROSION & SEDIMENTATION CONTROL PLAN - GENERAL NOTES, BMP MAINTENANCE NOTES, LEGEND AND ABBREVIATIONS
M
Y
A
REFERENCE DRAWINGS
DRAWING NO. TITLE
AO38aa_100_G-0012-A G-0012-A
A
A
A
A
AO38aa_565_X-1001-A
AO38aa_565_X-1002-A
AO38aa_565_X-1003-A
X-1001-A
X-1002-A
X-1003-A
X-0010-AAO38aa_565_X-0010-A
G-0012-A
R E
V
IS
D
P
R
E N
D M
E N
A U
G
J T
S
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
PITTSBURGH DISTRICT
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
T O S
U P
P O
R T S
E R
V
IC
E B
R
ID
G E R
E P
A
IR
S
L O
Y A
L H
A N
N A L
A K
E D
A M
B U
S H R
E C
R E
A T
IO
N A
R E
A S
IT
E D
E V
E L
O P
M E
N T
CERTIFIED FINAL DOCUMENTS
W
W N
B
C F S -1 -1
C
FS
-1 -2
CFS
-1 8-
RCE
WFT-1
WFT-12
WFT-
WFT-12
W F
T
CFS-18-4
C
FS
-1 8-
W
FT-
LP
4" MAPLE
4" MAPLE
MAPLE
8" MAPLE
SIGN
SIGN
ARROW LEFT"
"ONE WAY
SIGN
10 MPH"
"SPEED LIMIT
SIGN
SIGN
SIGN
BOATING"
SAFE
"PRACTICE
SIGN
BE WORN..."
"PFD’s MUST
SIGN
DOCK..."
"COURTESY
SIGN
BBQ
BBQ
BEVERAGES..."
"NO ALCOHOLIC
SIGN
ENTER"
"DO NOT
SIGN
LAKESIDE"
"115
SIGN
RECREATION AREA"
"USACE - BUSH
SIGN
FOLLOW RT 981N"
LOYALHANNA DAM
"LEFT ARROW
SIGN
TREE
PINE
INLET
TREE
INLET
TREE
TREE
TREE
TREE
TREE
TREE
"STOP"
SIGN
ENTER"
"DO NOT
SIGN
SWING
TREE
BBQ
ELEC BOX
ELEC BOX
(GRAVEL)
PARKING
(GRAVEL)
PARKING
(GRAVEL)
PARKING
(CONCRETE)
BOAT RAMP
" C
P P
12" CPP
"BOAT DOCK RD"
SIGN
(REMOVABLE)
BOAT DOCKS
TREE
CRABAPPLE
BBQ
BBQ
BBQ
"STOP"
SIGN
INLET
HEADWALL
STONE
" C
M P
BBQ
TREE
PINE
TREE
PINE
TREE
PINE
TREE
PINE
TREE
TREE
(DOUBLE-ARM)
GATE
POSITION)
(FIXED
BENCH
POSITION)
(FIXED
BENCH
POSITION)
(FIXED
BENCH
STUMP
24" TREE
TREE
(GRAVEL)
PARKING
(GRAVEL)
PARKING
(GRAVEL)
PARKING
(GRAVEL)
PARKING
WFT-
W F T
W
FT-
CFS-18-5
CFS-18-6
LOYALHANNA LAKE
B U S
O
A D
CONTRACTOR WORK LIMITS
WORK LIMITS
CONTRACTOR
WORK LIMITS
CONTRACTOR
USACE PROPERTY LINE
REMOVE TREE
(SEE NOTE 5)
REMOVE BBQ
REMOVE TREE
(SEE NOTE 5)
REMOVE BBQ
REMOVE TREE
(TYP)
BOULDER
REMOVE
(SEE NOTE 5)
REMOVE BBQ
(SEE NOTE 5)
REMOVE BENCH
CLEAR AND GRUB THIS AREA
AREAS
PARKING AND BBQ
REMOVE GRAVEL~
PARKING AREA
REMOVE GRAVEL
(TYP) - SEE NOTE 5
REMOVE WHEEL STOP
PARKING AREA
REMOVE GRAVEL
(SEE NOTE 5)
REMOVE GATE
REMOVE TREE
(SEE NOTE 5)
REMOVE SIGN
TREE
REMOVE
ROCK CONSTRUCTION2
X-5004 ENTRANCE
COMPOST FILTER
SOCK (TYP.)
X-5005
X-5005
NON-ERODIBLE
MATERIAL
LAYDOWN AREA
CONTRACTOR
X-5004
UPLAND DIVERSION
CHANNEL (TEMPORARY)
SEE NOTE 6
X-5004
FILTER BAG
INLET PROTECTION
AND HEADWALL
INLET, CULVERT
REMOVE STORM
REMOVE TREE
NN
LEGEND
SCALE: 1" = 20’-0"
PLAN - EROSION AND SEDIMENTATION CONTROL - PHASE 1
MAIN A
CCESS R
OAD
(TRAPEZOIDAL) ROADSIDE CHANNEL.
ACCEPT FLOW FROM THE NEW PERMANENT
CHANNEL, AND THEN MODIFY AGAIN LATER TO
TEMPORARY UPLAND (V-SHAPED) DIVERSION
TO ALLOW FLOW TO ENTER FROM THE
7. CONTRACTOR TO MODIFY INLET STRUCTURE
CONSTRUCTION.
CONNECTIONS ARE NOT DAMAGED DURING
6. ENSURE EXISTING ELECTRICAL BOXES AND
FUTURE USE.
BE STORED AND PROTECTED FOR POSSIBLE
BOULDERS, GRILLS AND WHEEL STOPS, SHALL
5. GOVERNMENT-OWNED ITEMS, SUCH AS BENCHES,
DETAILS, SEE DWGS X-5004 THROUGH X-5007.
4. FOR EROSION AND SEDIMENT CONTROL BMP
X-0009.
3. FOR BMP INSTALLATION NOTES, SEE DWG
DWG X-0008.
2. FOR AREA-SPECIFIC WORK SEQUENCES, SEE
NOTES, SEE DWG. X-0010.
1. FOR GENERAL NOTES AND BMP MAINTENANCE
NOTE 7
INLET - SEE
MODIFY EXISTING
A
A A
A
A
A
A
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
T O S
U P
P O
R T S
E R
V
IC
E B
R
ID
G E R
E P
A
IR
S
L O
Y A
L H
A N
N A L
A K
E D
A M
B U
S H R
E C
R E
A T
IO
N A
R E
A S
IT
E D
E V
E L
O P
M E
N T
CERTIFIED FINAL DOCUMENTS
W
W N
B
P W
P :d m s
A O a a
X
A .d g n
H
T S
D B
A C
A U
G
:4
A O a a
X
A .d g n
:1
P L
A N
B
C R
A T
T Y
S C
H N
E L
L E
R
P .E
E R
O S
IO
N S
E D
IM
E N
T A
T
IO
N C
O N
T R
O L
P H
A S
E
P
G O
L D
E N
K
H O
E S
C H
A N
S I D
X-1001-A
R E
V
IS
E N
D M
E
A U
G
J T
S
WORK LIMITS
CONTRACTOR
C F S -1 -1
C
FS
-1 -2
CFS
-1 8-
CFS-18-4
C
FS
-1 8-
LP
4" MAPLE
4" MAPLE
MAPLE
8" MAPLE
SIGN
SIGN
ARROW LEFT"
"ONE WAY
SIGN
10 MPH"
"SPEED LIMIT
SIGN
SIGN
SIGN
BOATING"
SAFE
"PRACTICE
SIGN
BE WORN..."
"PFD’s MUST
SIGN
DOCK..."
"COURTESY
SIGN
BBQ
BBQ
BEVERAGES..."
"NO ALCOHOLIC
SIGN
ENTER"
"DO NOT
SIGN
LAKESIDE"
"115
SIGN
RECREATION AREA"
"USACE - BUSH
SIGN
FOLLOW RT 981N"
LOYALHANNA DAM
"LEFT ARROW
SIGN
TREE
PINE
INLET
TREE
TREE
INLET
TREE
TREE
TREE
TREE
TREE
TREE
"STOP"
SIGN
ENTER"
"DO NOT
SIGN
SWING
TREE
BBQ
ELEC BOX
ELEC BOX
(GRAVEL)
PARKING
(GRAVEL)
PARKING
(GRAVEL)
PARKING
(CONCRETE)
BOAT RAMP
" C
P P
12" CPP
"BOAT DOCK RD"
SIGN
(REMOVABLE)
BOAT DOCKS
CFS-18-5
CFS-18-6
LOYALHANNA LAKE
B U
A D
CONTRACTOR WORK LIMITS
WORK LIMITS
CONTRACTOR
WORK LIMITS
CONTRACTOR
USACE PROPERTY LINE
LAYDOWN AREA
CONTRACTOR
SEE NOTE 6
PLAN - EROSION AND SEDIMENTATION CONTROL - PHASE 2
A
A A
A
A
A
A
VEGETATIVE COVER HAS BEEN ESTABLISHED.
CFS-18-2 SHALL REMAIN IN-PLACE UNTIL 70%
8. COMPOST FILTER SOCKS CFS-18-1 AND
ROAD.
ESTABLISHED ALONG THE NEW MAIN ACCESS
UNTIL 70% VEGETATIVE COVER HAS BEEN
7. FILTER BAGS SHALL REMAIN IN THE INLETS
(TRAPEZOIDAL) ROADSIDE CHANNEL.
TO ACCEPT FLOW FROM THE NEW PERMANENT
6. CONTRACTOR TO MODIFY INLET STRUCTURE
ARE NOT DAMAGED DURING CONSTRUCTION.
5. ENSURE ELECTRICAL BOXES AND CONNECTIONS
DETAILS, SEE DWGS X-5004 THROUGH X-5007.
4. FOR EROSION AND SEDIMENT CONTROL BMP
X-0009.
3. FOR BMP INSTALLATION NOTES, SEE DWG
DWG X-0008.
2. FOR AREA-SPECIFIC WORK SEQUENCES, SEE
NOTES, SEE DWG. X-0010.
1. FOR GENERAL NOTES AND BMP MAINTENANCE
NOTES:
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
T O S
U P
P O
R T S
E R
V
IC
E B
R
ID
G E R
E P
A
IR
S
L O
Y A
L H
A N
N A L
A K
E D
A M
B U
S H R
E C
R E
A T
IO
N A
R E
A S
IT
E D
E V
E L
O P
M E
N T
CERTIFIED FINAL DOCUMENTS
W
W N
B
P W
P :d m s
A O a a
X
A .d g n
H
T S
D B
A C
A U
G
:4
A O a a
X
A .d g n
:1
P L
A N
B
C R
A T
T Y
S C
H N
E L
L E
R
P .E
E R
O S
IO
N S
E D
IM
E N
T A
T
IO
N C
O N
T R
O L
P H
A S
E
P
G O
L D
E N
K
H O
E S
C H
A N
S I D
X-1002-A
R E
V
IS
E N
D M
E
40’10’0 20’
SCALE: 1"=20’
A U
G
J T
S
WORK LIMITS
CONTRACTOR
COMPOST FILTER
SOCK (TYP.)
X-5005
X-5004
FILTER BAG
INLET PROTECTION
X-5005 MATERIAL
NON-ERODIBLE
NOTE 6
INLET - SEE
MODIFY EXISTING
DETAIL 10, DWG X-5006
MAT ON FILL SLOPES - SEE
INSTALL TURF REINFORCEMENT
(SEE DETAIL 10, DWG X-5006)
POSSIBLE HIGH-WATER EVENTS
AREA FOR PROTECTION DURING
MAT ON CUT SLOPES, THIS
INSTALL TURF REINFORCEMENT
X-5007
TRM-LINED CHANNEL
TRAPEZOIDAL, VEGETATED
CFS-18-4
CFS
-1 8-
C
FS
-1 8-
LP
4" MAPLE
4" MAPLE
MAPLE
8" MAPLE
SIGN
SIGN
ARROW LEFT"
"ONE WAY
SIGN
10 MPH"
"SPEED LIMIT
SIGN
SIGN
SIGN
SIGN
BOATING"
SAFE
"PRACTICE
SIGN
BE WORN..."
"PFD’s MUST
SIGN
DOCK..."
"COURTESY
SIGN
BBQ
BBQ
BEVERAGES..."
"NO ALCOHOLIC
SIGN
ENTER"
"DO NOT
SIGN
LAKESIDE"
"115
SIGN
RECREATION AREA"
"USACE - BUSH
SIGN
FOLLOW RT 981N"
LOYALHANNA DAM
"LEFT ARROW
SIGN
TREE
PINE
INLET
TREE
TREE
TREE
INLET
TREE
TREE
TREE
TREE
TREE
TREE
"STOP"
SIGN
ENTER"
"DO NOT
SIGN
SWING
TREE
BBQ
ELEC BOX
ELEC BOX
(GRAVEL)
PARKING
(GRAVEL)
PARKING
(GRAVEL)
PARKING
(CONCRETE)
BOAT RAMP
" C
P P
12" CPP
"BOAT DOCK RD"
SIGN
(REMOVABLE)
BOAT DOCKS
CFS-18-6
LOYALHANNA LAKE
B U
A D
CONTRACTOR WORK LIMITS
WORK LIMITS
CONTRACTOR
WORK LIMITS
CONTRACTOR
USACE PROPERTY LINE
COMPOST FILTER
SOCK (TYP.)
X-5005
LAYDOWN AREA
CONTRACTOR
PLAN - EROSION AND SEDIMENTATION CONTROL - PHASE 3
NON-ERODIBLE
MATERIAL
X-5005
X-5005
TEMPORARY
COFFERDAM
NON-ERODIBLE
MATERIAL
X-5005
CONSTRUCTION.
CONNECTIONS ARE NOT DAMAGED DURING
5. ENSURE EXISTING ELECTRICAL BOXES AND
DETAILS, SEE DWGS X-5004 THROUGH X-5007.
4. FOR EROSION AND SEDIMENT CONTROL BMP
X-0009.
3. FOR BMP INSTALLATION NOTES, SEE DWG
DWG X-0008.
2. FOR AREA-SPECIFIC WORK SEQUENCES, SEE
NOTES, SEE DWG. X-0010.
1. FOR GENERAL NOTES AND BMP MAINTENANCE
A
A
A
A
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
T O S
U P
P O
R T S
E R
V
IC
E B
R
ID
G E R
E P
A
IR
S
L O
Y A
L H
A N
N A L
A K
E D
A M
B U
S H R
E C
R E
A T
IO
N A
R E
A S
IT
E D
E V
E L
O P
M E
N T
CERTIFIED FINAL DOCUMENTS
W
W N
B
P W
P :d m s
A O a a
X
A .d g n
H
T S
D B
A C
A U
G
:4
A O a a
X
A .d g n
:1
P L
A N
B
C R
A T
T Y
S C
H N
E L
L E
R
P .E
E R
O S
IO
N S
E D
IM
E N
T A
T
IO
N C
O N
T R
O L
P H
A S
E
P
G O
L D
E N
K
H O
E S
C H
A N
S I D
40’10’0 20’
SCALE: 1"=20’ X-1003-A
R E
V
IS
E N
D M
E
A U
G
J T
S
WORK LIMITS
CONTRACTOR
P W
P :d m s
A O a a
X
A .d g n
H
T S
D B
A C
A U
G
:4
A O a a
X
A .d g n
.0
:1
B
C R
A T
T Y
S C
H N
E L
L E
R
P .E
E R
O S
IO
N S
E D
IM
E N
T A
T
IO
N C
O N
T R
O L P
L A
N
G E
N E
R A
L N
O T
E S
B M
P M
A
IN
T E
N A
N C
E
N O
T E
S L E
G E
N D A
N D A
B B
R E
V
IA
T
IO
SYMBOLS, SEE DWG G-0012.
1. FOR ADDITIONAL ABBREVIATIONS AND LEGEND
K
H O
E S
C H
A N
S I D
P
G O
L D
E N
X-0010-A
R E
V
IS
E N
D M
E
A A
A U
G
J T
S
ABBREVIATIONS
CFS - COMPOST FILTER SOCK
TRM - TURF REINFORCEMENT MAT
RCE - ROCK CONSTRUCTION ENTRANCE
WFT - WEIGHTED SEDIMENT FILTER TUBE
PWFB - PUMPED WATER FILTER BAG
LEGEND
MULCHING RATE:
MULCH TYPE:
LIMING RATE:
FERTILIZER APPL. RATE:
FERTILIZER TYPE:
APPLICATION RATE:
% PURE LIVE SEED:
SPECIES:
TEMPORARY PERMANENT
3.0 TON/ACRE
STRAW
1.0 TON/ACRE
500 LB/ACRE
10-10-10
40 LB/ACRE
10%
ANNUAL RYEGRASS
3.0 TON/ACRE
STRAW
6.0 TON/ACRE
1,000 LB/ACRE
10-10-20
10 LB/ACRE; 35 LB/ACRE
6%; 30%
BIRDSFOOT TREFOIL; TALL FESCUE
WEIGHTED FILTER TUBE (12" DIA.)
PWFB PUMPED-WATER FILTER BAG
NON-ERODIBLE MATERIAL
RCE ROCK CONSTRUCTION ENTRANCE
WFT-12
CFS-18
WORK PAD COFFERDAM/PERIMETER STRUCTURE
COMPOST FILTER SOCK (18" DIA.)
HANDLING AND DISPOSAL OF MATERIALS REMOVED FROM BMP’S:
CONSTRUCTION WASTES (RECYCLING AND DISPOSAL):
PERMANENT CONTROL MEASURES:
BE PLACED AS REQUIRED TO A THICKNESS OF 3".
4. IF THE PRE-CONSTRUCTION CONDITION WAS BARE GROUND OR GRAVEL, #57 STONE WILL
3. CONTRACTOR TO TEST SOIL TO DETERMINE PROPER SOIL AMENDMENTS.
OF AGRICULTURAL SCIENCES, PENN STATE UNIVERSITY.
AND CONSERVATION PLANTINGS ON NONCROPLAND" MANUAL BY THE COLLEGE
NOTE: SOIL AMENDMENTS AND SEED MIX IN ACCORDANCE WITH THE "EROSION CONTROL
AS FOLLOWS:
2. IF THE PRE-CONSTRUCTION AREA WAS VEGETATED, THE AREA SHALL BE RE-VEGETATED
WITHIN THE WORK AREA SHALL BE RETURNED TO PRE-CONSTRUCTION CONDITIONS.
1. AFTER ALL BMP’S HAVE BEEN REMOVED FROM THE WORK AREA, THE GROUND SURFACE
AT A COMMERCIALLY AVAILABLE AND PROPERLY PERMITTED DISPOSAL FACILITY.
LIMBS, BRUSH AND OTHER ORGANIC MATERIAL SHALL BE DISPOSED OF OFF-SITE
CONSTRUCTION ENTRANCES, AS WELL AS ANY PUMPED WATER FILTER BAGS, TREE
1. SOIL MATERIAL REMOVED FROM BEHIND THE CFS, WFT, CHANNELS AND ROCK
CLEAN FILL/ENVIRONMENTAL DUE DILIGENCE
GENERAL EROSION AND SEDIMENT CONTROL NOTES
FACILITY.
OF OFF-SITE AT A COMMERCIALLY AVAILABLE AND PROPERLY-PERMITTED DISPOSAL
AFTER THE WASTE CONCRETE HAS HARDENED, IT SHALL BE REMOVED AND DISPOSED
AREA AT THE FURTHEST POINT AWAY FROM THE LAKE AND ROADSIDE CHANNEL.
CHUTE AND MIXER WASHOUT SHALL BE PERFORMED IN THE CONTRACTOR LAYDOWN
PIPE, ETC., SHALL BE DISPOSED OF OFF-SITE AS STATED ABOVE. CONCRETE TRUCK
3. NON-BIODEGRADABLE CONSTRUCTION WASTES, SUCH AS TRM, WFT, GEOTEXTILE, PVC
WEEK.
SHALL BE DISPOSED OF OFF-SITE AS STATED ABOVE AT THE END OF EACH WORK
INTO SEPARATE GARBAGE CANS (PLASTIC AND GLASS BOTTLES FOR RECYCLING) AND
2. CONTRACTOR PERSONNEL FOOD, PAPER PRODUCTS AND BOTTLES WILL BE PLACED
AND PROPERLY PERMITTED DISPOSAL FACILITY.
WORK AREAS SHALL BE DISPOSED OF OFF-SITE AT A COMMERCIALLY AVAILABLE
1. EXCESS SOIL AND RIPRAP FROM CONSTRUCTION AND DEMOLITION OF THE VARIOUS
APPROVALS.
ENVIRONMENTAL PROTECTION. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING THOSE
WESTMORELAND COUNTY CONSERVATION DISTRICT/PENNSYLVANIA DEPARTMENT OF
2. ALL OFF-SITE BORROW AND/OR WASTE AREAS REQUIRE PRIOR APPROVAL FROM THE
SITE FILL MATERIAL. ALL OFF-SITE FILL MUST MEET PADEP CLEAN FILL STANDARDS.
1. THE CONTRACTOR IS RESPONSIBLE FOR ENVIRONMENTAL INVESTIGATIONS FOR ANY OFF-
STATED IN THE SPECIFICATIONS.
DURABILITY REQUIREMENTS FOR PERMANENT FILL AS
LAYER OF AASHTO NO. 1 STONE MEETING THE
5. NON-ERODIBLE MATERIAL SHALL BE A 6-INCH THICK
THE NEXT STEP, EXCEPT WHERE NOTED.
SHALL BE COMPLETED BEFORE PROCEEDING TO
IMPLEMENTATION. EACH STEP OF THE SEQUENCE
THE CONTRACTING OFFICER PRIOR TO
SEQUENCE MUST BE APPROVED IN WRITING FROM
THE PLAN DRAWINGS. ANY DEVIATION FROM THAT
IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED
UTILITIES.
1776 FOR THE LOCATION OF EXISTING UNDERGROUND
CALL SYSTEM, INC., SHALL BE NOTIFIED AT 1-800-242-
AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE
DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH
PERMITTEE SHALL PROVIDE NOTIFICATION TO PADEP.
DISTURBANCE ACTIVITIES, THE PERMITTEE OR CO-
3 DAYS PRIOR TO PROCEEDING WITH BULK EARTH
PERIMETER SEDIMENT CONTROL BMP’S, AND AT LEAST
2. UPON INSTALLATION OR STABILIZATION OF ALL
OF THE EROSION AND SEDIMENTATION CONTROL PLAN.
CONSTRUCTION ON-SITE MEETING WITH THE PREPARER
GRUBBING), THE CONTRACTOR SHALL HOLD A PRE-
DISTURBANCE ACTIVITIES (INCLUDING CLEARING AND
1. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH
MAINTENANCE PROGRAM
INSPECTION SCHEDULE AND RESPONSIBILITIES:
MAINTENANCE INSTRUCTIONS:
TO START OF WORK THE FOLLOWING DAY.
4. REPAIR AND MAINTENANCE OF THE BMP SHALL BE PERFORMED THE SAME DAY OR PRIOR
AND MAINTENANCE OF THE BMP’S.
3. THE CONSTRUCTION CONTRACTOR SUPERINTENDENT WILL BE RESPONSIBLE FOR THE REPAIR
CONTRACTOR SUPERINTENDENT SHALL BE INFORMED.
OBSERVED OR MAINTENANCE REQUIRED WILL BE NOTED AND THE CONSTRUCTION
INSPECTIONS AND NOTE THE FINDINGS IN THE DAILY CONSTRUCTION LOG. ANY DEFICIENCIES
2. THE CONSTRUCTION CONTRACTOR QUALITY CONTROL REPRESENTATIVE SHALL CONDUCT THE
0830 AND AFTER EACH RUNOFF AND HIGH-WATER EVENT.
1. EACH BMP SHALL BE INSPECTED AT THE BEGINNING OF EACH WORK DAY BETWEEN 0730-
PROVIDED TO THE CONTRACTOR FOR MULTIPLE STRUCTURE DEWATERINGS.
THE AREA WITHIN THE PERIMETER STRUCTURE. ADDITIONAL COMPENSATION WILL NOT BE
STRUCTURE DRY. NUMEROUS CHANGES IN THE LAKE LEVEL COULD OCCUR AND INUNDATE
PUMPING PLANT OR OTHER SIMILAR FACILITIES TO KEEP THE AREA WITHIN THE PERIMETER
ANY LEAKS SHALL BE REPAIRED IMMEDIATELY. THE CONTRACTOR SHALL PROVIDE A
THE WORK PAD COFFERDAM/PERIMETER STRUCTURE SHALL BE INSPECTED EACH DAY AND
8. WORK PAD COFFERDAM/PERIMETER STRUCTURE:
HAS FALLEN INTO THE CHANNEL SHALL BE REMOVED IMMEDIATELY.
FROM THE CHANNEL. ANY BRUSH, TREE LIMBS, LARGE ROCKS OR OTHER MATERIAL THAT
LINING IMMEDIATELY. SEDIMENT ACCUMULATIONS OF MORE THAN 3" SHALL BE REMOVED
VEGETATED CHANNELS TO MAINTAIN GRASS HEIGHT BELOW 4". REPAIR DAMAGED TRM
REMOVE ANY BRUSH GROWING UP THROUGH THE CHANNEL OR ON THE SIDE SLOPES. MOW
7. UPLAND DIVERSION CHANNEL:
SITE FOR THIS PURPOSE.
REPLACED WITHIN 24 HOURS OF INSPECTION. A SUPPLY OF TUBES SHALL BE KEPT ON
REACHES HALF THE HEIGHT OF THE TUBE. DAMAGED TUBES SHALL BE REPAIRED OR
ACCUMULATED SEDIMENT SHALL BE REMOVED AND PROPERLY DISPOSED OF WHEN IT
6. WEIGHTED SEDIMENT FILTER TUBE (WFT):
VEGETATIVE HEIGHT.
MOWED TO A HEIGHT OF 6 INCHES UNTIL THE SURROUNDING AREAS REACH THE SAME
70% VEGETATIVE COVER). VEGETATION THAT GROWS QUICKER IN SOME AREAS SHALL BE
FERTILIZING AND WATERING AS NEEDED TO ACHIEVE PERMANENT STABILIZATION (UNIFORM
5. AREAS TO RECEIVE VEGETATION SHALL BE MAINTAINED BY RE-SEEDING, MULCHING,
SECTION OF CFS. ANY LOOSE OR BROKEN STAKES SHALL BE SECURED OR REPLACED.
CFS SECTION SHALL EXTEND A MINIMUM OF 4 FEET BEYOND EACH END OF THE DAMAGED
SHALL BE PLACED DIRECTLY UPSLOPE OF THE DAMAGED SECTION OF CFS. THE REPAIR
DAMAGED SECTIONS OF THE CFS WILL REMAIN IN PLACE AND A NEW SECTION OF CFS
THE CFS. UNDERCUT SECTIONS OF THE CFS WILL BE FILLED WITH NSA R-3 STONE.
WHEN THE ACCUMULATED HEIGHT BEHIND THE CFS REACHES ONE-HALF THE HEIGHT OF
4. COMPOST FILTER SOCK (CFS): SEDIMENT WILL BE REMOVED AND PROPERLY DISPOSED OF
STRAPS ALREADY ATTACHED.
BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING
AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL
REPLACED WHEN THEY BECOME � FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT
REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE
PROBLEM IS CORRECTED. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY
PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE
SHALL BE FLOATING SCREENED. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY
� THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES
3. FILTERED PUMP OUTFLOW: THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR
THICKNESS BECOMES LESS THAN 6 INCHES.
2. STONE SHALL BE ADDED TO THE NON-ERODIBLE AGGREGATE SURFACES WHEN THE
DRAINAGE COURSES IS NOT ACCEPTABLE.
SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER
BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE. WASHING THE ROADWAY OR
AT ALL TIMES. ANY SEDIMENT MATERIAL TRACKED OUT ON TO PAVED ROADWAYS SHALL
SHALL BE STOCKPILED ON-SITE. THE 8" THICKNESS OF THE RCE SHALL BE MAINTAINED
1. ROCK CONSTRUCTION ENTRANCE (RCE): AN ADEQUATE SUPPLY OF AASHTO No. 1 STONE
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
T O S
U P
P O
R T S
E R
V
IC
E B
R
ID
G E R
E P
A
IR
S
L O
Y A
L H
A N
N A L
A K
E D
A M
B U
S H R
E C
R E
A T
IO
N A
R E
A S
IT
E D
E V
E L
O P
M E
N T
CERTIFIED FINAL DOCUMENTS
W
W N
B
| G-0012-A |
| X-1001-A |
| X-1002-A |
| X-1003-A |
| X-0010-A |
File details come from the government source that posted it. Updated .