Certified_Final_RTA_-_Technical_Specifications.pdf
PDF 685 KB Posted
- Attached to
- Site Development for Service Bridge Repairs at Loyalhanna Lake Dam, Westmoreland County, PA
- Solicitation number
- W911WN15B0013
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Results.pdf | ||
| W911WN-15-B-0013-0003_PLANS.pdf | ||
| W911WN-15-B-0013-0003.pdf | ||
| W911WN-15-B-0013-0002.pdf | ||
| W911WN-15-B-0013-0001.pdf | ||
| W911WN-15-B-0013-0001.pdf | ||
| Site_Visit_Attendees.pdf | ||
| W911WN-15-B-0013_PLANS.pdf | ||
| W911WN-15-B-0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911WN-15-B-0013
Loyalhanna Dam Lake
Site Development for Dam Service Bridge Repairs
Westmoreland County, PA
Technical Specifications
Certified Final Documents – RTA W911WN-15-B-0013
13 May 2015
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 18 00 UTILITY COORDINATIONS
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 32 01.00 10 PROJECT SCHEDULE
01 32 23 SURVEY AND ALIGNMENT CONTROL
01 32 33 DIGITAL PROGRESS IMAGES
01 33 00 SUBMITTAL PROCEDURES
01 35 00.00 08 SPECIAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 10 PROJECT SIGN
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23.00 08 STORM WATER POLLUTION CONTROL
01 78 02.00 15 CLOSEOUT SUBMITTALS (AS-BUILT DRAWINGS)
DIVISION 02 - EXISTING CONDITIONS
02 32 00 SUBSURFACE DRILLING, SAMPLING, AND TESTING
02 41 00 DEMOLITION
02 42 00 DISPOSAL OF MATERIALS
DIVISION 05 - METALS
05 52 00 METAL RAILINGS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASES
32 17 23.00 20 PAVEMENT MARKINGS
32 22 16 BITUMINOUS PAVEMENT CONSTRUCTION
32 30 00 INCIDENTAL CONSTRUCTION
32 31 13 CHAIN LINK FENCES AND GATES
32 31 19 METAL GATES
32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 92 19 SEEDING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1 Certifified Final Documents - RTA W911WN-15-B-0013
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 18 00
UTILITY COORDINATIONS
PART 1 GENERAL
1.1 SUMMARY
1.2 PROTECTION OF UTILITIES
1.3 LOCATION OF EXISTING UTILITIES
1.4 CONNECTIONS TO MUNICIPAL UTILITY SYSTEMS
1.5 UTILITY SERVICES
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 18 00 Page 1
SECTION 01 18 00
UTILITY COORDINATIONS
PART 1 GENERAL
1.1 SUMMARY
This section addresses the requirements regarding the Contractor's responsibility for coordination of the work under this contract with existing utilities.
1.2 PROTECTION OF UTILITIES
The Contractor shall locate and clearly identify all underground and above ground utility lines, wires, cables, pipes, poles, support lines, and culverts, within the Contractor's work areas. The Contractor shall contact the Pennsylvania One Call System at telephone (800) 242-1776 at least three days prior to beginning any Construction activity. The Contractor shall be responsible for any costs for the Pennsylvania One Call System. The Contractor shall conduct his operations such that the utilities are not damaged or disturbed. Any damage to utilities caused by the Contractor's actions shall be repaired by him at no additional expense to the Government. The Contractor shall store materials and equipment in a manner that does not interfere with utility company services or utility company access to the facilities. The Contractor shall relocate any equipment or stockpiles, at no additional cost to the Government, that interfere with utility company operations, emergency repairs, or standard maintenance services.
1.3 LOCATION OF EXISTING UTILITIES
Existing utilities at the Project are as shown on the drawings. Regardless of the information provided on the drawings, the Contractor shall verify the total extent of wiring from its source to the fixtures and equipment at the existing facilities, at his expense. The location of these utilities shall be coordinated with the Contracting Officer and the Facility Manager.
1.4 CONNECTIONS TO MUNICIPAL UTILITY SYSTEMS
All work in connection with connection to existing utility systems shall be coordinated with the appropriate authority. Such connections shall be made in accordance with the requirements of the authority. Costs for all connections shall be be the responsibility of the Contractor.
1.5 UTILITY SERVICES
The following is a listing of points of contact for some utilities:
EXISTING UTILITIES
Utility Service Point of Contact
General Utility Pennsylvania One Call System Locations Telephone Requests Only
SECTION 01 18 00 Page 2
Ph. 1-800-242-1776
Government Utility Mr. Paul Toman, Locations Resource Manager Loyalhanna Lake Ph. (724) 639-9013 Fax (724) 639-9818
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 18 00 Page 3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.3 JOB PAYMENT ITEMS
1.3.1 Protection and Maintenance of Traffic During Construction
1.3.1.1 Payment
1.3.1.2 Unit of Measure
1.3.1.3 Payment Item
1.3.2 Erosion and Sediment Controls
1.3.2.1 Payment
1.3.2.2 Unit of Measure
1.3.2.3 Payment Item
1.3.3 Pavement Markings
1.3.3.1 Payment
1.3.3.2 Unit of Measure
1.3.3.3 Payment Item
1.3.4 Signage
1.3.4.1 Payment
1.3.4.2 Unit of Measure
1.3.4.3 Payment Item
1.3.5 Geotechnical Investigation
1.3.5.1 Payment
1.3.5.2 Unit of Measure
1.3.5.3 Payment Items
1.3.6 Design and Certification of Retaining Wall
1.3.6.1 Payment
1.3.6.2 Unit of Measure
1.3.6.3 Payment Items
1.4 UNIT PRICE PAYMENT ITEMS
1.4.1 Digital Progress Images
1.4.1.1 Payment
1.4.1.2 Measurement
1.4.1.3 Unit of Measure
1.4.1.4 Payment Item
1.4.2 Clearing and Grubbing
1.4.2.1 Payment
1.4.2.2 Measurement
1.4.2.3 Unit of Measure
1.4.2.4 Payment Item
1.4.3 Guide Rail
1.4.3.1 Payment
1.4.3.2 Measurement
1.4.3.3 Unit of Measure
1.4.3.4 Payment Item
1.4.4 Chain Link Fence
1.4.4.1 Payment
1.4.4.2 Measurement
SECTION 01 22 00.00 10 Page 1
1.4.4.3 Unit of Measure
1.4.4.4 Payment Item
1.4.5 Gate
1.4.5.1 Payment
1.4.5.2 Measurement
1.4.5.3 Unit of Measure
1.4.5.4 Payment Item
1.4.6 Removal of Storm Drainage Structures
1.4.6.1 Payment
1.4.6.2 Measurement
1.4.6.3 Unit of Measure
1.4.6.4 Payment Item
1.4.7 Removal of Storm Drainage Pipe
1.4.7.1 Payment
1.4.7.2 Measurement
1.4.7.3 Unit of Measure
1.4.7.4 Payment Item
1.4.8 Remove Existing Gravel
1.4.8.1 Payment
1.4.8.2 Measurement
1.4.8.3 Unit of Measure
1.4.8.4 Payment Item
1.4.9 Earthwork
1.4.9.1 Payment
1.4.9.2 Measurement
1.4.9.3 Unit of Measure
1.4.9.4 Payment Item
1.4.10 Geotextile
1.4.10.1 Payment
1.4.10.2 Measurement
1.4.10.3 Unit of Measure
1.4.10.4 Payment Item
1.4.11 Bituminous Pavement Construction
1.4.11.1 Payment
1.4.11.2 Measurement
1.4.11.3 Unit of Measure
1.4.11.4 Payment Item
1.4.12 Aggregate Base Courses
1.4.12.1 Payment
1.4.12.2 Measurement
1.4.12.3 Unit of Measure
1.4.12.4 Payment Item
1.4.13 Turf Reinforcement Mat
1.4.13.1 Payment
1.4.13.2 Measurement
1.4.13.3 Unit of Measure
1.4.13.4 Payment Item
1.4.14 Precast Concrete Block Retaining Wall
1.4.14.1 Payment
1.4.14.2 Measurement
1.4.14.3 Unit of Measure
1.4.14.4 Payment Items
1.4.15 Seeding
1.4.15.1 Payment
1.4.15.2 Measurement
1.4.15.3 Unit of Measure
1.4.15.4 Payment Item
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 2
SECTION 01 22 00.00 10 Page 3
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PDT)
PDT 408 (2011) Specifications
1.2 GENERAL REQUIREMENTS
This section covers measurement and payment of items applicable to the performance of the work under this contract.
1.3 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.3.1 Protection and Maintenance of Traffic During Construction
1.3.1.1 Payment
This work is specified in Section 01 35 00.00 08 SPECIAL PROCEDURES Payment will be made for costs associated with developing and implementing traffic control maintenance and protection measures as required throughout the life of the contract. The job price shall include, but not be limited to, protection of vehicular and pedestrian traffic, signing, lighting, channelization devices, and any additional requirements necessary to maintain traffic within the project area. Price shall be in accordance with PDT 408, Section 901, and include all materials, labor, and equipment, and supplies associated with this work.
1.3.1.2 Unit of Measure
Unit of measure: Job.
SECTION 01 22 00.00 10 Page 4
1.3.1.3 Payment Item
Item No. 0003 Protection and Maintenance of Traffic During Construction
1.3.2 Erosion and Sediment Controls
1.3.2.1 Payment
This work is specified in Section 01 57 23.00 10 STORM WATER POLLUTION PREVENTION MEASURES. Payment will be made for costs associated with furnishing, installing, maintaining and removing sediment and erosion controls measures; including but not limited to silt/filter fabric fence, filter bags, inlet protection, rock construction entrances, erosion control mulch blanket, erosion control mat, temporary trench plug, silt curtains/coffer dam device, dewatering, dust control, etc.; as shown on the drawings or as defined in the Erosion and Sediment Control Plan. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.3.2.2 Unit of Measure
Unit of measure: Job.
1.3.2.3 Payment Item
Item No. 0004 Erosion and Sediment Controls
1.3.3 Pavement Markings
1.3.3.1 Payment
This work is specified in Section 32 17 23.00 20 PAVEMENT MARKINGS.
Payment will be made for costs associated with surface preparation, protection and placement of pavement markings of width, color and locations indicated in the contract drawings, details and specifications. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.3.3.2 Unit of Measure
Unit of measure: Job.
1.3.3.3 Payment Item
Item No. 0007 Paint Pavement Lines/Markings
1.3.4 Signage
1.3.4.1 Payment
This work is specified in Section 02 41 00 Demolition. Payment will be made for costs associated with removing existing project, traffic, and safety signs; and reinstalling them after completion of work. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.3.4.2 Unit of Measure
Unit of measure: Job.
SECTION 01 22 00.00 10 Page 5
1.3.4.3 Payment Item
Item No. 0008 Remove and Reinstall Project/Traffic/Safety Signs
1.3.5 Geotechnical Investigation
1.3.5.1 Payment
This work is specified in Section 02 32 00 SUBSURFACE DRILLING, SAMPLING, AND TESTING. Payment will be made for all costs associated with the geotechnical investigation of Loyalhanna's Bush Run Recreation Area including, but not limited to drilling and testing of sample borings, test pit excavation and sampling, and material for shoring/lining pit excavation. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.3.5.2 Unit of Measure
Unit of measure: Job.
1.3.5.3 Payment Items
Item No. 0024 Block Wall - Geotechnical Investigative Services
1.3.6 Design and Certification of Retaining Wall
1.3.6.1 Payment
This work is specified in Section 32 32 23 SEGMENTED BLOCK RETAINING WALL.
Payment will be made for costs associated with the design and certification of the new segmental retaining wall.
1.3.6.2 Unit of Measure
Unit of measure: Job.
1.3.6.3 Payment Items
Item No. 0025 Block Wall - Design and Certification of Precast Concrete Block Retaining Wall
1.4 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.4.1 Digital Progress Images
1.4.1.1 Payment
This work is specified in Section 01 32 33 DIGITAL PROGRESS IMAGES.
Payment will be made for costs associated with furnishing digital progress
SECTION 01 22 00.00 10 Page 6 images, as specified. Each set shall consist of all specified hard copies and electronic copies of each photographic session as specified. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.1.2 Measurement
Measurement will be made of the number of sets of photographs taken and delivered to the Contracting Officer as approved or directed by the Contracting Officer or authorized representative. Each set shall consist of all specified hard copies and electronic copies of each photographic session as specified.
1.4.1.3 Unit of Measure
Unit of measure: Sets.
1.4.1.4 Payment Item
Item No. 0002 Digital Progress Images
1.4.2 Clearing and Grubbing
1.4.2.1 Payment
This work is specified in Section 31 11 00 CLEARING AND GRUBBING. Payment will be made for costs associated with clearing and grubbing, as required to perform the work. Payment shall include, but not be limited to, removal of topsoil and organic matter; removal of all woody debris (bushes, trees, stumps, etc.); removal of objectionable material, rubbish, and trash within the project limits; disposal of removed material; salvage of material, if required, including temporary storage and delivery; and preparing excess soil material for disposal offsite. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.2.2 Measurement
Measurement for payment will be made for the actual area of surface to be cleared rounded to the nearest 10th of an acre..
1.4.2.3 Unit of Measure
Unit of measure: Acre.
1.4.2.4 Payment Item
Item No. 0005 Clearing and Grubbing
1.4.3 Guide Rail
1.4.3.1 Payment
This work is specified in Section 32 30 00 INCIDENTAL CONSTRUCTION.
Payment will be made for costs associated with furnishing and installing guide rail, including all appurtenances and hardware for the execution of this work; as specified in the Conttact drawings. Price shall include all materials, labor, equipment, and supplies associated with this work.
SECTION 01 22 00.00 10 Page 7
1.4.3.2 Measurement
Measurement for payment shall be by the actual lineal foot of guide rail and post installed.
1.4.3.3 Unit of Measure
Unit of measure: Lineal Foot.
1.4.3.4 Payment Item
Item No. 0006 Guide Rail
1.4.4 Chain Link Fence
1.4.4.1 Payment
This work is specified in Section 32 31 13 CHAIN LINK FENCES AND GATES.
Payment will be made for costs associated with furnishing and installing chain link fence and three fence swing gates, including all appurtenances and hardware for the execution of this work, as specified and as shown on the contract drawings. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.4.2 Measurement
Measurement for payment shall be by the actual lineal foot of fence installed, including the length of the gates.
1.4.4.3 Unit of Measure
Unit of measure: Lineal Foot.
1.4.4.4 Payment Item
Item No. 0009 Chain Link Fence, 7' High
1.4.5 Gate
1.4.5.1 Payment
This work is specified in Section 32 31 19 METAL GATES. Payment will be made for costs associated with furnishing and installing a new vehicular gate, including all appurtenances and hardware for the execution of this work, as specified and as shown on the contract drawings. Price shall include all materials, labor, equipment, and supplies associated with this work. The three swing gates installed with the fence in the locations shown on the drawings will be measured and paid for under CLIN 0009, Chain Link Fence, 7' High
1.4.5.2 Measurement
Measurement for payment shall be by the actual number of gates installed.
1.4.5.3 Unit of Measure
Unit of measure: Each.
SECTION 01 22 00.00 10 Page 8
1.4.5.4 Payment Item
Item No. 0010 Vehicular Gate, Swing, 20' Wide
1.4.6 Removal of Storm Drainage Structures
1.4.6.1 Payment
This work is specified in Section 02 41 00 DEMOLITION and Section 02 42 00 Disposal of Materials. Payment will be made for costs associated with the removal of existing concrete catch basins and headwalls; including but not limited to hauling the material to a properly permitted commercially available facility and payment of all associated fees. Price shall include all materials, labor, equipment, and supplies associated with this work
1.4.6.2 Measurement
Measurement for payment shall be by the actual amount of structures removed and disposed.
1.4.6.3 Unit of Measure
Unit of measure: Each.
1.4.6.4 Payment Item
Item No. 0019 Storm Drainage - Removal of Existing Concrete Headwall
1.4.7 Removal of Storm Drainage Pipe
1.4.7.1 Payment
This work is specified in Section 02 41 00 DEMOLITION and Section 02 42 00 Disposal of Materials. Payment will be made for costs associated with the removal of existing corrugated metal pipes, steel pipes, and plastic pipes;
including but not limited to hauling the material to a properly permitted commercially available facility and payment of all associated fees. Price shall include all materials, labor, equipment, and supplies associated with this work
1.4.7.2 Measurement
Measurement for payment shall be by the actual length of pipe removed and disposed.
1.4.7.3 Unit of Measure
Unit of measure: Lineal Foot.
1.4.7.4 Payment Item
Item No. 0018 Storm Drainage - Removal of Existing 12" Corrugated Metal Pipe
1.4.8 Remove Existing Gravel
1.4.8.1 Payment
This work is specified in Section 02 41 00 DEMOLITION. Payment will be
SECTION 01 22 00.00 10 Page 9 made for costs associated with required removal and disposal of gravel material as specified and as shown in the contract drawings. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.8.2 Measurement
Measurement for payment shall be by the actual area of gravel acceptably remove base of the surface area of the plane covered. All measurements for payment shall be made by or in the presence of the Contracting Officer
1.4.8.3 Unit of Measure
Unit of measure: Square Yard
1.4.8.4 Payment Item
Item No. 0020 Remove Existing Gravel Areas
1.4.9 Earthwork
1.4.9.1 Payment
This work is specified in Section 31 00 00 EARTHWORK and Section 02 42 00 DISPOSAL OF MATERIALS. Payment will be made for costs associated with required excavation, backfill, and disposal of unsuitable material as specified and as shown in the contract drawings. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.9.2 Measurement
Measurement of quantities will be made for the actual volume of common excavation and backfill completed within the limits, lines and grades shown on the contract drawings. No allowance will be made for overdepth excavation of for the removal of any material outside the required lines unless authorized by the Contracting Officer. The volume of material removed and placed shall be determined by the average-end-area method, based on cross sections taken by field survey prior to and after completion of common excavation, or other method approved by the Contracting Officer.
The cross section surveys shall be obtained by the Contracting Officer at a maximum 50-foot interval over the length of disturbance prior to and after excavation to determine the actual amount of material removed. Volume computations shall be performed by the Contractor, and copies of all cross section data and computations shall be submitted to the Contracting Officer within 48 hours following completion of the field cross sections.
1.4.9.3 Unit of Measure
Unit of measure: Cubic Yard.
1.4.9.4 Payment Item
Item No. 0012 Roadway - Excavation
Item No. 0013 Roadway - Backfill
Item No. 0026 Block Wall - Excavation
Item No. 0027 Block Wall - Backfill
SECTION 01 22 00.00 10 Page 10
1.4.10 Geotextile
1.4.10.1 Payment
This work is specified in Section 31 05 19 GEOTEXTILE. Payment will be made for costs associated with placement of geotextile fabric as indicated on the contract drawings. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.10.2 Measurement
Measurement for payment shall be by the actual area of geotextile acceptably installed based on the surface area of slope covered. All measurements for payment shall be made by or in presence of the Contracting Officer.
1.4.10.3 Unit of Measure
Unit of measure: square yard.
1.4.10.4 Payment Item
Item No. 0028 Block Wall - Geotextile
1.4.11 Bituminous Pavement Construction
1.4.11.1 Payment
This work is specified in Section 32 22 16 BITUMINOUS PAVEMENT CONSTRUCTION; and shall comply with PDT 408, Item 305 for Bituminous Concrete Base Course. Payment for pavement removal will be made for costs associated with removal, hauling and disposal of material.Payment for reconstructing pavement and overlay new pavement will be made for costs associated with placement, rolling and compaction, and finishing of the materials to the depth specified in the contract drawings. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.11.2 Measurement
Measurement for pavement will be the actual area of surface constructed and accepted.
1.4.11.3 Unit of Measure
Unit of measure: Square Yard.
1.4.11.4 Payment Item
Item No. 0011 Roadway - Removal of Bituminous Pavement
Item No. 0014 Roadway - Bituminous Wearing Course, 1-1/2"
Item No. 0015 Roadway - Bituminous Binder Course, 2-1/2"
Item No. 0016 Roadway - Bituminous Concrete Base Course, 6"
SECTION 01 22 00.00 10 Page 11
1.4.12 Aggregate Base Courses
1.4.12.1 Payment
This work is specified in Section 32 11 23 AGGREGATE BASES. Payment will be made for costs associated with placement, rolling and compaction, and finishing of the material to the depth specified in the contract drawings.
Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.12.2 Measurement
Measurement for pavement will be the actual volume of aggregate installed and accepted. Volume will be determined by average end area method.
1.4.12.3 Unit of Measure
Unit of measure: Cubic Yard.
1.4.12.4 Payment Item
Item No. 0017 Roadway - Aggregate Base Course, 6"
Item No. 0023 Laydown Area - Aggregate Base Course, 6" (AASHTO #1)
Item No. 0029 Block Wall - Compacted Aggregate Base
1.4.13 Turf Reinforcement Mat
1.4.13.1 Payment
This work is specified in Section 32 92 19 SEEDING. Payment will be made for costs associated with lining ditch with turf reinforcement mat as indicated on the contract drawings. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.13.2 Measurement
Measurement for payment shall be by the actual area of turf reinforcement mat acceptably installed based on the surface area of slope covered. All measurements for payment shall be made by or in presence of the Contracting Officer.
1.4.13.3 Unit of Measure
Unit of measure: Square Yard.
1.4.13.4 Payment Item
Item No. 0022 Storm Drainage - Ditch, Lined with Turf Reinforcement Mat
1.4.14 Precast Concrete Block Retaining Wall
1.4.14.1 Payment
This work is specified in Section 32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL and Section 31 00 00 EARTHWORK. Payment will be made for costs associated with excavation, installation of precast wall units to construct new concrete retaining wall, expansion joint material, pvc pipe
SECTION 01 22 00.00 10 Page 12 for drainage; placing and compaction of structural backfill for wall stabilization, soil sampling and testing and any other work related to the retaining wall construction. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.4.14.2 Measurement
Measurement for payment shall be by the actual area of retaining wall installed.
1.4.14.3 Unit of Measure
Unit of measure: Square Foot
1.4.14.4 Payment Items
Item 0030 Block Wall - Precast Concrete Retaining Wall Units
1.4.15 Seeding
1.4.15.1 Payment
This work is specified in Section 32 92 19 SEEDING. Payment will be made for costs associated with equipment calibration,sitepreparation, application of fertilizer, seed installation, mulching, watering, erosion control and clean up. Price shall include all materials, labor, equipment and supplies associated with this work.
1.4.15.2 Measurement
Measurement for payment shall be the by the actual area, rounded to the nearest tenth of an acre, of seeding required.
1.4.15.3 Unit of Measure
Unit of measure: Arce
1.4.15.4 Payment Item
Item No. 0021 Seeding
-- End of Section --
SECTION 01 22 00.00 10 Page 13
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 32 01.00 10
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 MONITORING CONSTRUCTION PROGRESS
3.3 PROGRESS SCHEDULE - BAR CHART
-- End of Section Table of Contents --
SECTION 01 32 01.00 10 Page 1
SECTION 01 32 01.00 10
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Project Schedule - Bar Chart; G, RE
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Pursuant to the Contract Clause, SCHEDULE FOR CONSTRUCTION CONTRACTS, a Project Schedule as described below shall be prepared. The scheduling of construction shall be the responsibility of the Contractor. Contractor management personnel shall actively participate in its development.
Subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule. A bar chart shall be prepared in accordance with paragraph PROGRESS SCHEDULE - BAR CHART.
3.2 MONITORING CONSTRUCTION PROGRESS
The schedule shall be the basis for measuring Contractor progress. Lack of an approved schedule or scheduling personnel will result in an inability of the Contracting Officer to evaluate Contractor's progress. Failure of the Contractor to provide all information, as specified below, shall result in the disapproval of the entire Project Schedule submission and the inability of the Contracting Officer to evaluate Contractor progress for payment purposes. In the case where Project Schedule revisions have been directed by the Contracting Officer and those revisions have not been included in the Project Schedule, the Contracting Officer may hold retainage up to the maximum allowed by contract, each payment period, until revisions to the Project Schedule have been made.
3.3 PROGRESS SCHEDULE - BAR CHART
The progress chart to be prepared by the Contractor pursuant to Section 00700 CONTRACT CLAUSE, paragraph "SCHEDULES FOR CONSTRUCTION CONTRACTS" shall consist of a Project Schedule - Bar Chartas described herein. In preparing this schedule, the scheduling of construction is the responsibility of the Contractor and contractor management personnel shall actively participate in its development. The chart may be prepared in a
SECTION 01 32 01.00 10 Page 2 format proposed by the Contractor and approved by the Contracting Officer.
Each activity shall include the applicable Price Schedule item number and show the estimated cost. The chart shall be prepared in sufficient detail to clearly show the Contractor's planned progress and the relationship of the various items of work. Larger activities shall be broken down into smaller activities with clearly defined limits (i.e. Excavation between STA xx and STA yy). In general, the estimated cost of any individual activity should not exceed $50,000. The selection and number of activities shall be subject to the Contracting Officer's approval. The chart shall be updated monthly to show actual progress and percentage of work completed for each activity. The Contractor shall submit, as part of his monthly request for payment, updated copies of his progress schedule identifying the work completed during the reporting period. If the Government issues changes to the existing work or adds additional work items to the contract, the Contractor shall revise his progress schedule accordingly. All costs associated with revising the schedule shall be included as part of the modification of the contract. If the Contractor's progress falls behind his planned work effort, a revised schedule shall be furnished with a brief explanation demonstrating how the Contractor proposes to complete the remaining work within the contract time. If the Contractor fails to submit updates as required, the Contracting Officer may withhold approval of partial payment estimates, until such submittals are made.
-- End of Section --
SECTION 01 32 01.00 10 Page 3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 32 23
SURVEY AND ALIGNMENT CONTROL
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SUBMITTALS
1.4 GENERAL REQUIREMENTS
1.4.1 Existing Project Survey Control
1.4.2 Contractor Survey Controls
1.4.3 Responsibilities
1.5 QUALIFICATIONS AND EXPERIENCE
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 PROCEDURES AND METHODOLOGIES
3.2 SURVEYS
-- End of Section Table of Contents --
SECTION 01 32 23 Page 1
SECTION 01 32 23
SURVEY AND ALIGNMENT CONTROL
PART 1 GENERAL
1.1 SUMMARY
This section addresses the overall project survey control and procedure requirements to meet all survey/positional accuracy requirements for this contract.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 1110-1-1005 (2007) Control and Topographic Surveying
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications and Experience; G, RE
The Contractor shall submit for approval evidence of the Professional Land Surveyor who will oversee all surveying as required under this contract.
Survey Plans; G, RE
The Contractor shall submit a detailed plan showing the equipment and calibration records, field data collection and data processing procedures, and QC procedures.
1.4 GENERAL REQUIREMENTS
1.4.1 Existing Project Survey Control
Existing project baseline stationing has been established for this work.
Existing horizontal and vertical control to be used to layout the project baselines is shown on the drawings.
1.4.2 Contractor Survey Controls
All new work to be constructed under this contract shall be constructed accurately from measurements made from project baselines and survey control
SECTION 01 32 23 Page 2 points established by the Contractor as necessary to construct all work within the proper alignment. The Contractor shall establish the project baselines shown and any other temporary survey control as may be necessary to carry out the requirements of this contract. All temporary control shall be based off the existing project control. The Contractor shall verify the elevations and positions of the existing project controls before using them to establish the project baselines and his survey control points, and shall notify the Contracting Officer of any discrepancies prior to commencing work. Any questions or problems concerning the survey control may be directed to the Chief, Dam Safety Section, Pittsburgh District at 412-395-7311.
1.4.3 Responsibilities
The Contractor has the overall responsibility to determine the procedures, equipment, and methodologies to perform all survey requirements outlined in these plans and specifications. The Government has the right to review and approve all survey plans but approval does not relieve the Contractor of the responsibility to satisfy all positional accuracy and tolerance requirements of these plans and specifications.
1.5 QUALIFICATIONS AND EXPERIENCE
The Contractor shall have a Professional Land Surveyor on staff who responsible for all survey work performed as part of this contract.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 PROCEDURES AND METHODOLOGIES
The Contractor shall use the appropriate survey equipment and procedures as deemed necessary to assure the positional accuracy requirements are met or exceeded as called for throughout this contract. The Contractor will be required to submit survey plans throughout this contract in accordance with other technical sections of this specification. These plans shall include detailed descriptions of the procedures and equipment that will be used for that requirement.
3.2 SURVEYS
All surveys performed as part of this contract shall be done in accordance with EM 1110-1-1005. Where requirements in other sections of these specifications exceed those outlined in the referenced EM, the requirements in these specifications shall take precedence over the EM and the Contractor shall be required to establish a plan to meet or exceed the requirements.
-- End of Section --
SECTION 01 32 23 Page 3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 32 33
DIGITAL PROGRESS IMAGES
PART 1 GENERAL
1.1 SUMMARY
1.2 GENERAL REQUIREMENTS
1.2.1 Description
1.2.2 Digital Photographs
1.3 SUBMITTALS
1.4 PHOTOGRAPHER QUALIFICATIONS
PART 2 PRODUCTS
2.1 CONTRACTOR-FURNISHED EQUIPMENT
2.1.1 Digital Camera
2.1.2 Color Printer
PART 3 EXECUTION
3.1 PHOTOGRAPHY
-- End of Section Table of Contents --
SECTION 01 32 33 Page 1
SECTION 01 32 33
DIGITAL PROGRESS IMAGES
PART 1 GENERAL
1.1 SUMMARY
The work under this section includes furnishing progress photographs consisting of digital photographs showing the progress of the construction operations throughout the contract period.
1.2 GENERAL REQUIREMENTS
1.2.1 Description
The Contractor shall, during the progress of the project (including progress of fabrication), furnish the Contracting Officer progress photographs to depict progress of construction throughout the life of the contract. The photographs shall be taken using digital photography equipment furnished by the Contractor. Electronic copies of approved photographs shall be furnished on compact disk or other storage media as approved by the Contracting Officer.
1.2.2 Digital Photographs
Digital photographs shall have a CCD resolution no less than 7.0 million pixels per image (3072 by 2304) which will provide enough detail to print an 8-inch by 10-inch photo-realistic photograph. The Contractor shall furnish, using Microsoft Word 2007 version, a file with each set of photographs which lists the following identifying information for each photographic image:
a. Name and location of project.
b. Contract number.
c. Date taken.
d. Contractor (and subcontractor if applicable).
e. Orientation of view and brief description of work depicted.
Each photograph shall be sequentially numbered. The identifying data shall be placed in the document accompanying the photographs. No identifying data, except the date stamp, shall appear on the photographs.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having an "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:+
Submittals
SD-03 Product Data
Digital Camera; G, RE
SECTION 01 32 33 Page 2
Product specification sheets for each item of equipment.
SD-11 Closeout Submittals
Thumbnail Hard Copy Prints of Progress Images; G, RE Glossy Prints of Selected Official Progress Images; G, RE Electronic Copy of Selected Official Progress Images; G, RE Electronic Copy of All Other Progress Images; G, RE
Copies of digital progress images in electronic form and hard copy form shall be submitted monthly for approval in accordance with paragraph "Photography". Progress images shall be submitted in a timely manner as coordinated with the Contracting Officer.
1.4 PHOTOGRAPHER QUALIFICATIONS
Progress photographs shall be made by a person experienced in photography and familiar with the photographic equipment to be used for making such photographs.
PART 2 PRODUCTS
2.1 CONTRACTOR-FURNISHED EQUIPMENT
The Contractor shall be responsible for furnishing all photographic equipment to perform the work specified by this section. If the camera becomes unusable for three days or more due to defects in materials or workmanship, the Contractor shall be responsible for furnishing a temporary replacement for the period it is out of service. The Contractor shall furnish the camera equipment within 14 days after receipt of Notice-to-Proceed. The Contractor shall use a color printer for producing the final,photo-quality, color hard copies of progress images.
2.1.1 Digital Camera
The Contractor shall use a minimum of one digital camera for his use to take the official progress photos for this contract. Progress photos,shall include progress during all phases of construction. The digital camera shall conform to the following minimum requirements. The camera shall have a CCD resolution no less than 7.0 million pixels per image (3072 by 2304) which will provide enough detail to print an 8-inch by 10-inch photo-realistic photograph. The camera shall have the capability to set the exposure settings manually or automatically. The camera shall also have picture overlay capability, which shall allow the user to overlay the time, date, and/or text over the digital image. The camera shall come with software that allows the user to download the images onto an IBM-compatible personal computer running Windows XP, Vista, or 7 and allow the images to be saved in one of the following graphic formats: JPG (Joint Photographic Experts Group), TIFF (Tagged Image File Format) or BMP (Windows Bitmap).
2.1.2 Color Printer
The Contractor shall furnish and utilize a photo-quality color laser printer or inkjet printer capable of producing high quality color photographs. The color printer shall be used for developing all official progress photographs taken during the contract.
SECTION 01 32 33 Page 3
PART 3 EXECUTION
3.1 PHOTOGRAPHY
The Contractor shall, during the progress of the work, furnish the Contracting Officer digitally produced progress photographs to depict the progress of the work both onsite and offsite at fabrication facilities.
All progress images shall be taken at the camera's highest resolution. In coordination with the Contracting Officer, one (1) set of progress photographs per month shall be taken over the full duration of this contract, except photographs will not be required for periods when no work is in progress. Thumbnail Hard Copy Prints of Progress Images shall be submitted to the Contracting Officer for approval between the first and fifth day of each month. The Contracting Officer will select from the thumbnail views, unless directed otherwise, at least ten (10) views to become official progress images. The selected official progress images shall be printed in color using the printer, ink, and paper combinations required to produce the quality of photograph specified above in 8-inch by 10-inch format and submitted for approval. Glossy Prints of Selected Official Progress Images and Electronic Copy of Selected Official Progress Images shall be furnished within ten days of approval of the thumbnail images. Electronic copies shall be furnished on compact disk with file of required photographic information. Electronic Copy of All Other Progress Images (including those not selected) shall be furnished on separate compact disk with file of required photographic information with the selected official progress images. Digital photographs shall be taken continuously throughout each month in which work is in progress. Unless otherwise directed by the Contracting Officer, photographs will not be required for periods of time in which work is not being performed.
Additional sets of photographs shall be taken as directed by the Contracting Officer. Enough digital photographs shall be taken to adequately depict each phase of the work and shall show progress made during those phases and at the completion of the project. Digital photographs shall show work accomplished since the previous photographs.
Progress photographs shall be submitted as specified herein and in paragraph "Submittals".
-- End of Section --
SECTION 01 32 33 Page 4
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
1.1.2 Approving Authority
1.1.3 Work
1.2 SUBMITTALS
1.3 SUBMITTAL CLASSIFICATION
1.3.1 Government Approved G
1.3.2 Information Only
1.4 PREPARATION
1.4.1 Transmittal Form
1.4.2 Procedures
1.4.3 Electronic File Format
1.5 INFORMATION ONLY SUBMITTALS
1.6 VARIATIONS
1.6.1 Considering Variations
1.6.2 Proposing Variations
1.6.3 Warranting That Variations Are Compatible
1.6.4 Review Schedule Is Modified
1.7 SUBMITTAL REGISTER
1.7.1 Use of Submittal Register
1.7.2 Contractor Use of Submittal Register
1.7.3 Approving Authority Use of Submittal Register
1.7.4 Copies Delivered to the Government
1.8 SCHEDULING
1.9 GOVERNMENT APPROVING AUTHORITY
1.10 DISAPPROVED OR REJECTED SUBMITTALS
1.11 APPROVED/ACCEPTED SUBMITTALS
1.12 APPROVED SAMPLES
1.13 WITHHOLDING OF PAYMENT
1.14 STAMPS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to start of construction (work) or the start of the next major phase of the construction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates of insurance
Surety bonds
List of proposed Subcontractors
List of proposed products
SECTION 01 33 00 Page 2
Construction Progress Schedule
Submittal register
Schedule of prices
Health and safety plan
Work plan
Quality Control(QC) plan
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
SECTION 01 33 00 Page 3
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
Interim "DD Form 1354" with cost breakout for all assets 30 days prior to facility turnover.
SECTION 01 33 00 Page 4
1.1.2 Approving Authority
Office or designated person authorized to approve submittal.
1.1.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register; G, RE
The Submittal Register shall be submitted within 20 calendar days after receipt of Notice to Proceed. The attached Submittal Register contains submittal requirements for the work under this Contract. A minimum of 14 days, exclusive of mailing time, shall be allowed and shown on the register for review and approval of submittals.
1.3 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.3.1 Government Approved G
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.
Within the terms of the Contract Clause entitled, "Specifications and Drawings for Construction," they are considered to be "shop drawings."
1.3.2 Information Only
Submittals not requiring Government approval will be for information only.
They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.4 PREPARATION
1.4.1 Transmittal Form
Use the form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper
SECTION 01 33 00 Page 5 listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for…