W911WN-13-R-0002-0001.pdf

PDF 23 KB Posted

Attached to
East Branch Cutoff Wall Construction Project
Solicitation number
W911WN-13-R-0002
Issued by

About this file

AMENDMENT 0001

View the file

Other files

File Type Posted
W911WN-13-R-0002-0010.pdf PDF
DBWD_PA_130004__13_Sep_2013.pdf PDF
31_32_23.16_08_-_Amendment_0009.pdf PDF
01_45_00.00_10_-_Amendment_0009.pdf PDF
31_09_13.00_08_-_Amendment_0009.pdf PDF
W911WN-13-R-0002-0009.pdf PDF
31_32_23.13_08_-_Amendment_0009.pdf PDF
QUESTION_351_DIAGRAM.pdf PDF
Contractor_Questions__Responses_435-448.pdf PDF
W911WN-13-R-0002-0008_conformed.pdf PDF
Certified_Final_Tech_Specs_Volume__3C_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
AMEND_0008_Contractor_Questions_ _Responses.pdf PDF
Certified_Final_Tech_Specs_Volume__3B_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Showing_Revisions.pdf PDF
BID_SCHEDULE.xlsx XLSX spreadsheet
Certified_Final_Tech_Specs_Volume__3D_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
Attachment_8_-_Contractor_Proposed_Quantities.xlsx XLSX spreadsheet
PA130004_26_JUL_2013.pdf PDF
W911WN-13-R-0002-0008.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Accepted_Revisions.pdf PDF
Attachment_6_Offerors_Expected_Funding.docx DOCX document
Certified_Final_Tech_Specs_Volume__3A_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
Bid_Schedule.docx DOCX document
W911WN-13-R-0002-0008_Plan_amended_26_Aug_2013.pdf PDF
W911WN-13-R-0002-0007.pdf PDF
W911WN-13-R-0002_24_JUN_2013pdf.pdf PDF
1_-_Rock_Core_Viewing_28_Jun_2013.pdf PDF
2_-_MSWord_format_Attachments_1_thru_7.doc DOC document
W911WN-13-R-0002-0006.pdf PDF
3__-_Questions_ _Responses.pdf PDF
W911WN-13-R-0002-0005.pdf PDF
Core_Viewing_Sign_In_19_Jun_2013.pdf PDF
Index_of_Available_Cores_and_Laboratory_Test_Data_and_results.pdf PDF
W911WN-13-R-0002-0004.pdf PDF
Core_Viewing_Sign_In_11_Jun_2013.pdf PDF
Core_Viewing_Sign_In_12_Jun_2013.pdf PDF
9_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_authorization_cover_letter.pdf PDF
8_-_PERMIT_-_Phase_I_Site_Development_-_EBR_Site_Development_NPDES_Permit_Approval.pdf PDF
5_-_PERMIT_-_Dam_Safety_-_Response_to_E S_TR_comments_2.pdf PDF
4_-_PERMIT_-_Dam_Safety_-_Response_to_E S_TR_Comments.pdf PDF
00_31_31.13_08.pdf PDF
3_-_PERMIT_-_Dam_Safety_-_E S_Drawings.pdf PDF
11_-_PERMIT_-__Phase_I_Site_Development_-_PADEP_NPDES_Permit_No._PAI_062411003.pdf PDF
12_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Transferee-CoPermittee_Application.pdf PDF
10_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Notice_of_Termination.pdf PDF
7_-_PERMIT_-_Phase_I_Site_Development_-_E S_Drawings.pdf PDF
1_-_PERMIT_-_Dam_Safety_-_Appendix_B_E S_Control_Report_(1).pdf PDF
W911WN-13-R-0002-0003.pdf PDF
Core_viewing_sign_in_4_Jun_2013.pdf PDF
6_-_PERMIT_-_Phase_I_Site_Development_-_Appendix_B_E S_Report_Phase1.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET430355168

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

East Branch Cutoff Wall Construction Project

Please see Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-May-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-13-R-0002

X 9B. DATED (SEE ITEM 11)

10-May-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-May-2013

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN-13-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

Change 1: This amendment is to correct FAR 52.236-27 SITE VISIT contained within Section 00100, page 43 of the SF1442 RFP. Replace paragraphs (b), (e), and (f) of this section with the following:

(b) 22 May 2013 at 11:00 a.m. EST

(e) Prospective offerors wishing to participate in the site visit are encouraged to register by providing the following information no later than 1:00 p.m. EST on 21 May 2013, to the Contracting In-Box via email at LRP.CONTRACTING@USACE.ARMY.MIL with SUBJECT of the email as the solicitation number “W911WN-13-R-0002 SITE VISIT – your company name:” and the following information in the body of the email:

1. Name of Firm

2. Firm's CAGE and/or DUNS number

3. Name and position Title of primary point-of-contact and their telephone number and email address

4. Submit a photocopy of your picture ID--such as a passport or drivers license.

*FOREIGN NATIONALS: A photocopy of a valid passport is required NLT Monday, 20 May 2013 for additional security requirements.

(f) For questions/and or concerns regarding the site visit, please submit an email to

LRP.CONTRACTING@USACE.ARMY.MIL.

Change 2: Addendum to Section 00100, Instructions to Offerors, 00100-2 Submission of Questions is replaced in its entirety with the following:

00100-2 SUBMISSION OF QUESTIONS

Due to the importance of maintaining the schedule for this project, it is requested that all questions regarding the specifications and/or drawings be submitted by 31 May 2013, 1:00 p.m.

All questions MUST be in writing and shall be emailed to LRP.CONTRACTING@USACE.ARMY.MIL or FAXED to 412-644-5109 with the SUBJECT of the email as the solicitation number “W911WN-13-R-0002 - QUESTION.” Any questions received after the above date will be answered at the discretion of the Contracting Officer.

Change 3: Specifications SECTION 00 31 31.13 08 SUBSURFACE INVESTIGATION INFORMATION, PARAGRAPH 1.1.1, Inspection of Geological Samples is replaced in its entirety with the revised section included with this amendment.

W911WN-13-R-0002

(End of Summary of Changes)

File details come from the government source that posted it. Updated .