AMENDMENT 0001
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET430355168
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
East Branch Cutoff Wall Construction Project
Please see Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-May-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-13-R-0002
X 9B. DATED (SEE ITEM 11)
10-May-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-May-2013
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-13-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
Change 1: This amendment is to correct FAR 52.236-27 SITE VISIT contained within Section 00100, page 43 of the SF1442 RFP. Replace paragraphs (b), (e), and (f) of this section with the following:
(b) 22 May 2013 at 11:00 a.m. EST
(e) Prospective offerors wishing to participate in the site visit are encouraged to register by providing the following information no later than 1:00 p.m. EST on 21 May 2013, to the Contracting In-Box via email at LRP.CONTRACTING@USACE.ARMY.MIL with SUBJECT of the email as the solicitation number “W911WN-13-R-0002 SITE VISIT – your company name:” and the following information in the body of the email:
1. Name of Firm
2. Firm's CAGE and/or DUNS number
3. Name and position Title of primary point-of-contact and their telephone number and email address
4. Submit a photocopy of your picture ID--such as a passport or drivers license.
*FOREIGN NATIONALS: A photocopy of a valid passport is required NLT Monday, 20 May 2013 for additional security requirements.
(f) For questions/and or concerns regarding the site visit, please submit an email to
LRP.CONTRACTING@USACE.ARMY.MIL.
Change 2: Addendum to Section 00100, Instructions to Offerors, 00100-2 Submission of Questions is replaced in its entirety with the following:
00100-2 SUBMISSION OF QUESTIONS
Due to the importance of maintaining the schedule for this project, it is requested that all questions regarding the specifications and/or drawings be submitted by 31 May 2013, 1:00 p.m.
All questions MUST be in writing and shall be emailed to LRP.CONTRACTING@USACE.ARMY.MIL or FAXED to 412-644-5109 with the SUBJECT of the email as the solicitation number “W911WN-13-R-0002 - QUESTION.” Any questions received after the above date will be answered at the discretion of the Contracting Officer.
Change 3: Specifications SECTION 00 31 31.13 08 SUBSURFACE INVESTIGATION INFORMATION, PARAGRAPH 1.1.1, Inspection of Geological Samples is replaced in its entirety with the revised section included with this amendment.
W911WN-13-R-0002