Changes to Section 02 42 00
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract 10-B-0004 Tionesta Tower.xlsm | XLSM spreadsheet | |
| BidResults for 10B0004.doc | DOC document | |
| 07 24 00.pdf | ||
| W911WN-10-B-0004-0001.doc.pdf | ||
| 01 57 20.00 10.pdf | ||
| Reference Drawings.pdf | ||
| W911WN-10-B-0004.pdf | ||
| Technical Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tionsta Dam, Control Tower EIFS Repair
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 42 00
DISPOSAL OF MATERIALS
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 DEFINITIONS
1.3.1 Demolition Debris
1.3.2 Excavated Material
1.3.3 Hazardous Waste
1.3.4 Permitted Solid Waste Disposal Facility
1.3.5 Solid Wastes
1.4 SUBMITTALS
1.5 ENVIRONMENTAL PROTECTION REQUIREMENTS
1.6 FEDERAL ENVIRONMENTAL COMPLIANCE REQUIREMENTS FOR
CONTRACTOR-PROPOSED DISPOSAL SITE
1.6.1 Background
1.7 DISPOSAL PLAN
1.8 WASTE CLASSIFICATION, HANDLING, AND DISPOSAL PLAN
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 SPECIAL DISPOSAL REQUIREMENTS
3.1.1 Containment of Debris
3.1.2 Disposal of Solid Wastes
3.1.3 Disposal of Demolition Debris
3.1.4 Disposal of Waste Water
3.1.5 Disposal of Contractor Generated Hazardous Wastes
3.1.6 Disposal of Materials with Lead Coatings
3.1.7 Burning
3.1.8 Hauling Materials to Disposal Facilities
3.2 SPECIAL REQUIREMENTS FOR EXCAVATED MATERIAL HANDLING
3.2.1 General
3.3 DISPOSAL OF EXCAVATED MATERIAL
3.3.1 General
3.4 INSPECTION
3.5 DISPOSAL REQUIREMENTS
-- End of Section Table of Contents --
SECTION 02 42 00 Page 1 W911WN-10-B-0004 Revised by Amendment 0001
SECTION 02 42 00
DISPOSAL OF MATERIALS
PART 1 GENERAL
1.1 SUMMARY
This section covers disposal of all materials resulting from excavation, demolition and construction operations under this contract.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926 Safety and Health Regulations for Construction
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 262.22 Number of Copies
40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
49 CFR 171, Subchapter C Hazardous Materials Regulations
1.3 DEFINITIONS
1.3.1 Demolition Debris
Demolition debris is concrete, stone, wood, pipe, and miscellaneous resulting from the demolition of structures or other facilities.
1.3.2 Excavated Material
Soil, rock and incidental debris removed during excavation for construction.
1.3.3 Hazardous Waste
Hazardous substances as defined in 40 CFR 261, or as defined by applicable State and local regulations.
SECTION 02 42 00 Page 2
1.3.4 Permitted Solid Waste Disposal Facility
A permitted solid waste disposal facility is a landfill or other facility which is properly permitted by the state in which the work is located for the disposal of municipal, residual, or construction/demolition waste. The facility shall be permitted to accept the particular material being disposed.
1.3.5 Solid Wastes
Solid waste is rubbish, debris, waste materials, garbage, and other discarded solid materials.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Disposal Plan; G, RE
Waste Classification, Handling, and Disposal Plan; G, RE
Disposal Sites
Plans shall be submitted as specified
1.5 ENVIRONMENTAL PROTECTION REQUIREMENTS
The Contractor shall comply with all applicable Federal, State, and local statues, laws and regulations. The Contractor shall provide environmental protective measures and procedures to prevent and control pollution, limit habitat disruption, and correct environmental damage that occurs during construction as specified in Section 01 57 20.00 10 ENVIRONMENTAL
PROTECTION.
1.6 FEDERAL ENVIRONMENTAL COMPLIANCE REQUIREMENTS FOR CONTRACTOR-PROPOSED
DISPOSAL SITE
These requirements apply only to that material which is identified as acceptable for disposal at an area other than a permitted solid waste disposal facility. Material which is specified to be disposed at a permitted solid waste disposal facility or hazardous waste facility must be disposed as specified for those materials.
1.6.1 Background
As an agency of the Federal government, the Pittsburgh District, US Army Corps of Engineers (District), is responsible for insuring compliance of its activities (including those undertaken by its contractors) with all applicable Federal environmental and cultural protection statutes, and regulations.
Disposal sites proposed by the Contractor must be permitted sites which comply with all pertinent Federal and State environmental protection
SECTION 02 42 00 Page 3 statutes and are commercially available. The Contractor shall submit documentation verifying that the Contractor's proposed disposal site meets all Federal environmental statutes and is commercially available. District approval of a Contractor-proposed disposal site is predicated upon the Contractor's demonstration that the site is in compliance with Federal statutes and is commercially available.
1.7 DISPOSAL PLAN
The procedures proposed for the collection, handling, transporting and disposal of the various materials to be disposed of under this contract shall be submitted for approval. The procedures shall provide for the safe conduct of the work and compliance with applicable Federal, state and local laws and regulations. The disposal procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operation. The plan shall include the name and location of all disposal facilities to be utilized for disposal of materials under this contract. The Contractor shall also furnish evidence of all required Federal, State or local permits and approvals. (See also paragraph
"FEDERAL ENVIRONMENTAL COMPLIANCE REQUIREMENTS FOR CONTRACTOR-PROPOSED
DISPOSAL SITE".) The plan shall be updated prior to any new hazardous material being brought on site or removed from the site. No work shall commence until the work plan has been approved.
1.8 WASTE CLASSIFICATION, HANDLING, AND DISPOSAL PLAN
The Contractor is responsible for assuring the proper disposal of all hazardous and nonhazardous waste generated during the project. Therefore, the Contractor shall develop a Waste Classification, Handling, and Disposal Plan in accordance with the requirements of 40 CFR 261 and 40 CFR 262. The waste classification, handling, and disposal plan shall include the source of materials, special handling requirements, and proposed disposal site.
In addition, the following provisions shall be included:
a. Hazardous waste shall be placed in closed containers and shall be shielded adequately to prevent dispersion of the waste by wind or water. Any evidence of improper storage shall be cause for immediate shutdown of the project until corrective action is taken.
b. Nonhazardous solid waste shall be stored in closed containers separate from hazardous waste storage areas.
c. All hazardous waste shall be transported by a licensed transporter in accordance with 40 CFR 263 and 49 CFR 171, Subchapter C.
d. All nonhazardous waste shall be transported in accordance with local regulations regarding waste transportation.
e. A copy of a waste profile sheet, identifying the particular waste and the proposed disposal site shall be submitted for each load of waste material before it is transported offsite.
f. The Contractor shall obtain a "Non-Hazardous Waste Manifest Form" from the permitted residual waste disposal facility for all wastes which are classified as non-hazardous, and submit the manifest to the Contracting Officer.
g. In addition to the number of manifest copies required by 40 CFR 262.22, one copy of each manifest for hazardous waste shall be
SECTION 02 42 00 Page 4 supplied to the Contracting Officer prior to transportation.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 SPECIAL DISPOSAL REQUIREMENTS
3.1.1 Containment of Debris
Debris from demolition and construction operations shall not be permitted to enter the river, lake or stream. All materials shall be contained in a manner to permit complete removal from the site.
3.1.2 Disposal of Solid Wastes
Solid waste shall be placed in containers and disposed on a regular schedule. All handling and disposal shall be conducted in such a way as to prevent spillage and contamination. The Contractor shall transport all solid waste off Government property and dispose at a commercially availabel and properly permitted solid waste disposal facility in compliance with Federal, State, and local requirements.
3.1.3 Disposal of Demolition Debris
Demolition products, except that which is to be recycled or salvaged, shall be transported from Government property for proper disposal at a commercially available and properly permitted solid waste disposal facility in compliance with Federal, State, and local requirements. Metals which are removed may be recycled as scrap. Materials which are coated with lead based paints shall be disposed in accordance with paragraph "Disposal of Materials with Lead Coatings".
3.1.4 Disposal of Waste Water
Waste water directly derived from construction activities, including but not limited to water used in drilling, concrete cutting, joint preparation, and dewatering of work areas, shall not be discharged before being treated to remove pollutants. Waste water shall be collected and placed in holding tanks so the suspended materials can settle prior to discharge to the stream or watercourse. Collection of waste water from cleaning of the existing surface will not be required if the cleaner used is not considered to be a hazard to the environment.
3.1.5 Disposal of Contractor Generated Hazardous Wastes
Hazardous waste generated by construction activities shall be removed from the work area and be disposed at a properly permitted commercially available disposal facility in compliance with Federal, State, and local requirements. The Contractor shall maintain separation and/or segregate hazardous waste from other materials and wastes, and shall protect it from the weather by placing it in a safe covered location; precautionary measures against accidental spillage such as berming or other appropriate measures shall be taken. Hazardous waste shall be removed from Government property within 60 days. Hazardous waste shall be transported in accordance with 40 CFR 263. The Contractor shall be responsible for preparing all waste manifests (EPA Form No. 8700-22 "Uniform Hazardous Waste Manifest Form"). A copy of each waste manifest and a copy of the disposal certificate from the Resource Conservation and Recovery Act (RCRA)
SECTION 02 42 00 Page 5 facility shall be furnished to the Contracting Officer. Hazardous waste shall not be dumped onto the ground, into storm sewers or open water courses, or into the sanitary sewer system.
3.1.6 Disposal of Materials with Lead Coatings
All miscellaneous metals and other items which are coated with a lead primer shall become the property of the Contractor, and shall be completely removed from the project site. These items may be sold as scrap (for basic steel processing) with the lead primer adhered, or may be disposed of in accordance with the applicable Federal, State, County and local laws.
Items with lead coatings, if not salvaged by the Contractor as scrap metal for reprocessing, shall be disposed of at an EPA approved disposal facility authorized to receive and process materials coated with lead product. The Contractor shall inform all workers involved with the removal of this material of the fact that the material is undercoated with lead primer.
Safety and health measures shall conform to EM 385-1-1 and 29 CFR 1926, Part 62. If materials containing lead are disposed of, the Contractor shall perform all required testing of the coating system and submit a certified copy of the test results along with a certified Uniform Hazardous Waste Manifest to the Contracting Officer. The manifest shall document the testing, transport and disposal of the material, and shall attest that the materials were disposed at a facility approved by the Pennsylvania Department of Environmental Resources for processing or disposal of such materials.
3.1.7 Burning
The use of burning at the project site for the disposal of refuse and debris will not be permitted. If burning is permitted, the following shall apply:
a. The material cleared may be burned within the contract area, and at any time within the contract period provided such burning does not interfere with inhabitants of the area by drastic changes in their accustomed environment, such as addition to air pollution or danger of fire. However, the specific time, location and manner of burning shall be subject to approval from the viewpoints of air pollution, governing fire laws and safety.
b. In the interest of conservation, the Contractor may, as an option, make available to the general public without charge, the material scheduled for burning. No burning operations shall be conducted within 100 feet of any standing timber or flammable growth. The burning operations shall be subject to all public law governing such operations and the Contractor will be responsible for any damage to life and/or property resulting from fires that are started by its employees or as a result of its operations.
c. Furnish at the site adequate fire fighting equipment, such as back tanks, flaps, shovels, rakes, etc., to properly equip his personnel for fighting fires. Fires shall be guarded at all times and shall be under constant surveillance until they have burned out or have been extinguished.
d. All burning shall be so thorough that the materials will be reduced to ashes, except that occasional charred pieces of logs or branches not exceeding 4 inches in diameter and/or 8 feet in length will be permitted to remain. Upon approval, charred material will be buried
SECTION 02 42 00 Page 6 after it is determined that it could not be disposed of by methods used in the normal burning operation. All material disposed of in such manner shall be at approved locations and shall be covered within a minimum of 18 inches of earth.
3.1.8 Hauling Materials to Disposal Facilities
Care shall be exercised in hauling the materials to the disposal facilities to preclude spillage and damage to public and private property and thoroughfares. Any materials spilled from the hauling equipment shall be removed by the Contractor at the Contractor's expense. The Contractor shall make all necessary arrangements and comply with all requirements associated with hauling the materials over streets and roads. (See also Section 01 30 00.10 GENERAL REQUIREMENTS, paragraph "WORK AREAS AND RESTRICTIONS", subparagraph "Use of Local Roads and Streets".
3.2 SPECIAL REQUIREMENTS FOR EXCAVATED MATERIAL HANDLING
3.2.1 General
In general, excavated material which is not used for fill or backfill and associated debris shall be disposed of at a commercially available and properly permitted solid waste disposal facility as defined in paragraph "Permitted Solid Waste Disposal Facility".
3.3 DISPOSAL OF EXCAVATED MATERIAL
3.3.1 General
The material excavated which is not used for fill or backfill and associated debris shall be disposed of in the vicinity of the work as directed by the Contracting Officer.
3.4 INSPECTION
If the Contracting Officer notifies the Contractor in writing of any observed noncompliance with contract requirements or Federal, State, or local laws, regulations and concerning disposal of materials, the Contractor shall inform the Contracting Officer of proposed corrective action and take such action to correct the noncompliance. If the Contractor fails to comply promptly, the Contracting Officer may issue an order stopping all or part of the work related to the disposal until satisfactory corrective action is taken. No time extensions will be granted and no costs or damages allowed to the Contractor for any such suspension.
3.5 DISPOSAL REQUIREMENTS
The following general requirements apply to disposal of materials unless other or more specific requirements are specified in the Task Order.
SECTION 02 42 00 Page 7
Table 1 Disposal Requirements
Material Disposal Requirements Testing Requirements
Solid Waste Commercially Available and As required by Properly Permitted Municipal facility Waste Facility
Demolition Debris Commercially Available and Heavy metals and as other than concrete Properly Permitted Municipal required by rubble (including or Construction/Demolition facility Bituminous Pavement) Waste Facility or burning of combustible materials where approved
Waste Water Discharge after removal of As required by suspended solids the Task Orderdisposal facility
Contractor Generated Commercially Available and As required by Hazardous Waste Properly Permitted Hazardous facility Waste Facility
-- End of Section --
SECTION 02 42 00 Page 8
| 02 42 00 - DISPOSAL OF MATERIALS |
| 02 42 00 - DISPOSAL OF MATERIALS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 DEFINITIONS |
| 1.3.1 Demolition Debris |
| 1.3.2 Excavated Material |
| 1.3.3 Hazardous Waste |
| 1.3.4 Permitted Solid Waste Disposal Facility |
| 1.3.5 Solid Wastes |
| 1.4 SUBMITTALS |
| 1.5 ENVIRONMENTAL PROTECTION REQUIREMENTS |
| 1.6 FEDERAL ENVIRONMENTAL COMPLIANCE REQUIREMENTS FOR CONTRACTOR-PROPOSED |
| 1.6.1 Background |
| 1.7 DISPOSAL PLAN |
| 1.8 WASTE CLASSIFICATION, HANDLING, AND DISPOSAL PLAN |
| PART 2 PRODUCTS Not Applicable |
| PART 3 EXECUTION |
| 3.1 SPECIAL DISPOSAL REQUIREMENTS |
| 3.1.1 Containment of Debris |
| 3.1.2 Disposal of Solid Wastes |
| 3.1.3 Disposal of Demolition Debris |
| 3.1.4 Disposal of Waste Water |
| 3.1.5 Disposal of Contractor Generated Hazardous Wastes |
| 3.1.6 Disposal of Materials with Lead Coatings |
| 3.1.7 Burning |
| 3.1.8 Hauling Materials to Disposal Facilities |
| 3.2 SPECIAL REQUIREMENTS FOR EXCAVATED MATERIAL HANDLING |
| 3.2.1 General |
| 3.3 DISPOSAL OF EXCAVATED MATERIAL |
| 3.3.1 General |
| 3.4 INSPECTION |
| 3.5 DISPOSAL REQUIREMENTS |
File details come from the government source that posted it. Updated .