W911WN-09-B-0008-0002.pdf

PDF 61 KB Posted

Attached to
Emsworth Back Channel Service Bridge Federal contract opportunity
Solicitation number
W911WN09B0008
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Amendment 0002 - W911WN09B0008 - Emsworth Back Channel Service Bridge

View the file

Other files for this federal contract opportunity

Other files attached to Emsworth Back Channel Service Bridge, newest first.
File Type Posted
BidResults for 09B0008.doc DOC document
W911WN-09-B-0008-0003.pdf PDF
01 22 00.00 10.pdf PDF
list of attendees.pdf PDF
W911WN-09-B-0008-0001.pdf PDF
W911WN-09-B-0008.zip ZIP file
Technical Specifications.pdf PDF
Price.xls XLS spreadsheet
W911WN09B0008.pdf PDF
W911WN09B0008.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET491342805

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RE: Emsworth Back Channel Dam Service Bridge Repairs

This amendment is issued to add line item 0020 to the bid schedule, answer questions, make a revision to the specification, update the wage determination, input the required percentage for clause 52.236-1 and to add the list of site visit attendees.

See Summary of Changes for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 24

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Aug-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0008

X 9B. DATED (SEE ITEM 11)

16-Jul-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Aug-2009

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN-09-B-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

BID SCHEDULE

ITEM DESCRIPTION QUANTITY UNIT UNIT

PRICE

AMOUNT

0001 REIMBURSEMENT FOR

ACTUAL PERFORMANCE AND

PAYMENT BONDS,

1 Lump Sum

0002 MOBILIZATION/

DEMOBILIZATION

1 Lump Sum

0003 DIGITAL PROGRESS IMAGES 12 Sets

0004 PROJECT AND SAFETY SIGNS 1 Lump Sum

0005 CLEANING AND PAINTING 1 Lump Sum

0006 ADDITION OF UPSTREAM

WALKWAY

6 Each

0007 REPLACE EXISTING HANDRAIL

WITH NEW

76 Linear Feet

0008 MOUNT EXISTING

FLOODLIGHTS ON NEW

SUPPORTS

7 Each

0009 RELOCATE SERVICE BRIDGE

CRANE CONDUCTOR RAIL

684 Linear Feet

0010 DEMOLISH AND REPLACE

CRANE RAILS

1,368 Linear Feet

0011 DEMOLISH AND REPLACE

HOIST CONDUCTOR RAIL

783 Linear Feet

0012 DEMOLISH AND REPLACE

HOIST TRACK BEAM

801 Linear Feet

0013 DEMOLISH AND REPLACE END SPAN CONCRETE AND JOINTS

0013AA DEMOLITION OF EXISTING 11 Cubic Yards

0013AB NEW PLACEMENT AT BRIDGE

DECK, JOINTS, & PIERS

11 Cubic Yards

0013AC REPLACEMENT OF JOINT SEAL

SYSTEM

144 Linear Feet

0014 DEMOLISH AND REPLACE CONCRETE BULKHEAD WALL AT PIER 10

0014AA DEMOLITION OF EXISTING

BULKHEAD WALL

2 Cubic Yards

0014AB NEW PLACEMENT AT

BULKHEAD WALL

1 Cubic Yards

0015 DEMOLISH AND REPLACE

BRIDGE BEARINGS

24 Each

0016 DEMOLISH AND REPLACE PIER

CONCRETE FOR BEARING

ACCESS

16 Cubic Yards

0017 VERTICAL JACKING OF

BRIDGE SPANS

6 Each

0018 LONGITUDINAL JACKING OF

BRIDGE SPANS

4 Each

0019 STEEL REPAIR WORK

0019AA REMOVAL OF EXISTING

RIVETS - REPLACEMENT WITH

HIGH STRENGTH BOLTS (FIRST

1000 EACH)

1,000 Each

0019AB REMOVAL OF EXISTING

RIVETS - REPLACEMENT WITH

HIGH STRENGTH BOLTS (ALL

OVER 1000 EACH)

150 Each

0019AC PERFORM WEB HOLE REPAIR 1 Each

0019AD REPAIR OF FLASHING IN FUEL

STORAGE ROOMS

2 Each

0020 RESTORE BULKHEAD HOIST

FOR EMERGENCY SERVICE

1 Each

TOTAL, ITEMS 0001 THRU 0020

* ALL QUANTITIES ARE ESTIMATED, EXCEPT WHERE THE UNIT IS GIVEN AS "LS" OR "EA".

DO NOT ROUND OFF TOTALS. IN CASE OF A VARIATION BETWEEN THE UNIT PRICE AND

THE EXTENSION, THE UNIT PRICE WILL BE CONSIDERED TO BE THE BID. IF A

MODIFICATION TO A BID BASED ON UNIT PRICES IS SUBMITTED, WHICH PROVIDES FOR A

LUMP SUM ADJUSTMENT TO THE TOTAL ESTIMATED COST, THE APPLICATION OF THE

LUMP SUM ADJUSTMENT TO EACH UNIT PRICE IN THE BID SCHEDULE MUST BE STATED.

IF IT IS NOT STATED, THE BIDDER AGREES THAT THE LUMP SUM ADJUSTMENT SHALL BE

APPLIED ON A PRORATA BASIS TO EVERY UNIT PRICE IN THE BID SCHEDULE. IF ITEM NO.

1 IS NOT APPLICABLE BECAUSE THE BID IS UNDER $25,000, THE BIDDER SHOULD STATE

“N/A” IN THE SPACE PROVIDED FOR THE AMOUNT.

THE FOLLOWING IS A LIST OF ABBREVIATIONS AND THEIR MEANINGS AS USED IN THE

PRICE SCHEDULE UNDER U/M (UNIT OF MEASURE):

LS

MO

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

AMENDMENT 0002

EMSWORTH LOCKS AND DAMS, BACK CHANNEL SERVICE BRIDGE REPAIRS

W911WN-09-B-0008

CONTRACTOR QUESTIONS AND ANSWERS

1. Should the Contractor assume that the Government will not utilize the service bridge crane during the contract period? Would this then allow the Contractor to remove any or all of the electrical service or rail as required without concern for the ability of the crane to operate?

A1. The service bridge crane can be out of operation for a longer period of time than the bulkhead hoist. It can not be out of operation for the entire duration of the contract.

2. Should the Contractor assume that other than assess for lock operations personnel, the Contractor can stage material and equipment on the service bridge deck as necessary and without concern for the operation of the service crane?

A2. The Contractor will need to be able to stage material and equipment on the bridge, the Contractor’s staging should coincide with the different phases of work. The staging of material and equipment will be subject to approval by the Contracting Officer.

3. Will the Government limit the type or weight of equipment or scaffolding that can be placed on the service bridge deck or attached to bridge girders?

A3. Yes, the Contractor’s plan will be subject to the Contracting Officer’s approval. The weight limits on the bridge spans will be the same as the load limits presently restricting the bridge. The Locomotive Crane Loadings shown on Reference Drawing O-LEM-53/1 govern allowable loads on the girders. The Contractor shall determine allowable loads on the concrete bridge deck based on the dimensions and construction shown on Reference Drawing O-LEM-53/5.1 AND American Bridge Drawing Sheet No. 56.

4. Should it be assumed that the Contractor is responsible for inspecting the rivets for corrosion? What specific locations will need inspection or is the entire steel construction of the service bridge to be inspected?

A4. Yes, the Contractor is responsible for inspecting the rivets for corrosion. All rivets associated with the superstructure (bridge & bulkhead monorail beam support framing) need to be inspected. As specified in Section 02 41 00, paragraph 3.1.5.1, subparagraph f, the Contracting Officer will make the determination as to which rivets are to be replaced.

5. If the U.S. light fixtures are removed, will temporary lights need to be installed until new fixtures and supports are installed? What are the requirements of these temporary fixtures?

A5. Yes, temporary lighting will need to be installed, the existing fixtures may be used until the new fixtures are located and installed.

6. Why is the concrete demolition around the bearings so extensive? Can this demolition be reduced if Contractor’s design of jacking and replacement method does not require the concrete to be removed?

A6. Sizing of the demolition areas was based on anticipated requirements for removal of bearing bolt behind stiffener plate. Demolition can be reduced based on contractor’s approved design.

7. Section 01 11 00 states the manner in which the existing operating cylinders and equipment are to be protected. With the unpredictability and frequent gate movements that occur at the dam, how is the Contractor to coordinate the installation and removal of these protective coatings with the lock operations personnel on a daily basis? Gate movements often occur at night and are the Contractor is often not informed of the moves until they are to occur.

A7. The actual means and methods of providing protection of existing operating equipment is to be determined by the Contractor and submitted by the Contractor to the Government for approval as a part of their Work Plan.

It would be anticipated that the Contractor would only need to protect one to two gate bays at a time. Therefore, dependent upon the time of year the Work is being performed it may be permissible to have one to two additional gates inoperable for a short period of time.

Typically, river forecasting would provide advanced notice of the gate operation needs.

The Contractor would need to coordinate with and inform the Government of planned and current protection of operating cylinders and equipment. The Contractor is also required to provide the Government with an emergency and backup phone numbers.

8. Will the aluminum bulkheads at the back channel dam be relocated to a gate bay when the extension and painting of the bulkhead storage structure occurs or will the Contractor have to consider the protection of the bulkheads when pricing?

A8. The contractor should anticipate the bulkheads will be in the storage pit and will have to consider the protection of the bulkheads.

9. Does the original page 3 of 93 (lump sum line item 0001) need to be submitted with the revised price schedule?

A9. No it does not.

10. Detail B on Drawing S-1173 (attached) shows a bent plate wheel stop. The radius for the bending of a ¾” plate will be 2 times the thickness of the plate or 1 ½” R.

Is the 1 ½” R acceptable in this application or should this be a welded plate?

A10. The existing service bridge crane wheel stop is a bent plate which, bears on the rail.

It is possible that the existing has a bend radius that does not conform to current recommendations. The Contractor may supply a welded plate configuration at no additional charge. Also, the Contractor may propose a variation to supply a pre -manufactured wheel stop designed for the rail to be supplied for the service bridge crane.

11. As the specifications are written, the Contractor is responsible for sequencing work in a manner that shall allow for restoration of the contractors work for emergency operation as directed by the Contracting Officer during any stage of construction. As the possibility of one or numerous emergencies may prevail, can the addition of a separate price line be added to include this scenario?

A11. A separate payment item will be added for Restore Bulkhead Hoist for Emergency Service. The item will include payment for restoring the hoist to operation and returning to the construction condition prior to restoring to service.

11A. If a line item is added would there be specifics as to the wording?

A11A. The wording is given in the attached Amendment 0002.

12. Section 01 11 00, Paragraph 1.5.2.2 and Section 01 50 00, Paragraph 3.5 refer to requirements for Temporary Fencing. Please clarify the scope of fencing required.

A12. The fencing required in Section 01 11 00, Paragraph 1.5.2.2, is for safety and to secure the Contractor’s Work Area within the Construction Work Limits (CWL) for their project trailer(s), and laydown area. The CWL is indicated on Sheet C-1057.

The fencing required in Section 01 50 00, Paragraph 3.5 refers to 42” high, safety fencing.

This fencing is intended to be for workplace safety. The location(s) are to be proposed by the Contractor and approved by the Government. This may include sub-areas within the at-grade laydown and trailer area as well as on the bridge.

13. Section 09 97 02, Paragraph 1.4.4 requires the Paint Removal to be done by a certified SSPC-QP 2 Painting Contractor. This requirement excludes at least one qualified paint subcontractor with lead removal experience on various Corps and PennDOT projects. Could this requirement be modified to include Paint Contractors with “PennDOT Prequalification or SSPC- QP 2 Certification”?

A13. No, the Government does not feel we can alter this requirement because of the known presence of lead based paint.

14. If the Corps directs the Contractor to restore the use of the Bulkhead Hoist within 72 hours in the event of an emergency per Paragraph 1.12.5 in Section 01 11 00, how will the Contractor be compensated for this work?

A14. See answer to Comment A11 above.

15. Please clarify the scope of rivet removal required considered incidental to other work items and not included in Bid Item 0019.

A15. The Contractor is referred to Sheet S-5170, “RIVET REPLACEMENT NOTES:” 1 and 2. Removal or replacement of structural steel that requires removal of existing rivets within the Contract Documents, shall include costs of the rivet replacement as work incidental to the removal/replacement item (e.g. removal of frames for jacking – see Sheets S-3163 & S-3164). Therefore, structural steel items (e.g. plates and shapes) shown to be removed or replaced within the Contract Documents shall have the existing rivet removal and replacement with high strength bolts paid as an incidental cost to the structural steel item removed or replaced and not included in Bid Item 0019AA or 0019AB.

16. Section 01 11 00, Paragraph 1.5.5 indicates the Contractor is to arrange for transportation of employees from off-site parking areas. Section 01 50 00, Paragraph 3.1 indicates employees will park in an area within reasonable walking distance of the site and then goes on to state that it is up to the Contractor to provide transportation should remote parking become necessary. Is it possible to define available parking more clearly?

A16. Section 01 11 00, Paragraph 1.5.5 correctly indicates that limited laydown, storage and parking area is available to the Contractor. Should insufficient parking be available, Paragraph 1.5.5 correctly indicates that the Contractor is responsible for obtaining any supplemental parking areas and the associated transportation of employees from off-site parking.

Section 01 50 00, Paragraph 3.1 refers to any parking the Contractor plans on having within the Construction Work Limits (CWL). As a part of the Contractor’s work plan the Contracting Officer will review and approve, as appropriate, the Contractor’s proposed parking area(s) within the CWL’s. Any parking permitted within the on-grade CWL’s is estimated to be within reasonable walking distance to the construction site. Paragraph 3.1 correctly indicates that due to limited available space at the site, the Contractor shall provide transportation for employees parked off-site at a remote parking location.

17. Please note that in the Solicitation, on page 74 of 93, in Section 52.236-1, the percentage of work to be performed by the Contractor has not been filled in.

A17. The percentage for general construction is 15%

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at 15% percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

18. Please clarify if there are required locations for the splices in the new Bulkhead Hoist Beam on Drawing S-1175.

A18. The Contract Documents do not intend to explicitly, precisely locate the required splice locations. Note 6 on Sheet S-1175, and the corresponding “PROPOSED TRACK BEAM ELEVATION”, also on Sheet S-1175, indicate the variation in splice location permitted. This allows the Contractor flexibility to determine the lengths of beams desired to be purchased and installed. This also allows the Contractor some flexibility in determining their means and methods required to have the bulkhead hoist operable within the time constraints specified if notified by the Contracting Officer.

19. Can we start the project at Pier 16 and progress the work back to Pier 10?

A19. There are no restrictions specified on where the work can begin.

20. Can we utilize the existing top rails to access materials and equipment across the dam (55,000 to 60,000# unit and misc. equipment)?

A20. Yes, the Contractor’s plan will be subject to the Contracting Officer’s approval. The load limits on the bridge spans will be the same as the Locomotive Crane Loadings shown on Reference Drawing O-LEM-53/1.

Specifications

Changes have been made to this section of the specifications listed:

Section 01 22 00.10

The following have been modified:

WAGE DETERMINATION

General Decision Number: PA080004 07/24/2009 PA4

Superseded General Decision Number: PA20070004

State: Pennsylvania

Construction Types: Heavy and Highway

Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and Westmoreland Counties in Pennsylvania.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (excluding sewer grouting projects and excluding sewage and water treatment plant projects)

Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 03/07/2008 3 03/21/2008 4 04/11/2008 5 05/30/2008 6 06/20/2008

7 06/27/2008 8 07/04/2008 9 07/18/2008 10 09/19/2008 11 10/03/2008 12 10/24/2008 13 11/07/2008 14 11/28/2008 15 12/05/2008 16 12/12/2008 17 12/19/2008 18 12/26/2008 19 01/02/2009 20 02/27/2009 21 03/06/2009 22 04/03/2009 23 04/17/2009 24 04/24/2009 25 05/01/2009 26 06/05/2009 27 06/12/2009 28 06/26/2009 29 07/03/2009 30 07/10/2009 31 07/24/2009

BOIL0013-005 09/30/2008

CENTRE, FRANKLIN, POTTER, CLINTON, FULTON, HUNTINDON AND

MIFFLIN COUNTIES

Rates Fringes

BOILERMAKER......................$ 38.81 25.26

BOIL0154-004 06/01/2008

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA,

CAMERON, CLARION, CLEARFIELD, CRAWFORD, ELK, FAYETTE, FOREST,

GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES

BOILERMAKER......................$ 33.90 22.07

BOIL0744-003 07/01/2008

ERIE COUNTY

Rates Fringes

BOILERMAKER......................$ 35.34 18.48

BRPA0009-023 12/01/2008

BEAVER COUNTY

Rates Fringes

BRICKLAYER.......................$ 25.95 13.60

BRPA0009-024 12/01/2008

WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps) COUNTY

BRICKLAYER.......................$ 27.98 13.22

BRPA0009-025 12/01/2008

BUTLER, LAWRENCE, AND MERCER COUNTIES

Rates Fringes

BRICKLAYER.......................$ 25.95 13.48

BRPA0009-032 12/01/2008

FAYETTE (Jefferson & Washington Twps), GREENE (Except Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Rostraver Twp) COUNTIES

BRICKLAYER.......................$ 26.90 13.64

BRPA0009-033 12/01/2008

ARMSTRONG, CLARION (Brady, Madison, Perry, Tobe, Porter, Redbank Twps), FAYETTE (Except Jefferson & Washington Twps), GREENE (Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Except Rostrave Twp) COUNTIES

BRICKLAYER.......................$ 27.02 13.52

BRPA0009-034 05/01/2009

ERIE COUNTY

BRICKLAYER.......................$ 24.87 13.99

CARP2235-005 01/01/2009

Rates Fringes

PILEDRIVERMAN

Piledriverman (welder)......$ 29.15 12.10 Piledriverman...............$ 28.85 12.10

CARP2235-006 01/01/2007

Rates Fringes

Diver............................$ 40.40 10.77 Tender...........................$ 26.93 10.77

CARP2274-001 01/01/2009

Rates Fringes

CARPENTER (ALLEGHENY,

ARMSTRONG, BEAVER, BUTLER,

ERIE, FAYETTE, GREENE,

LAWRENCE, MERCER, WASHINGTON,

AND WESTMORELAND COUNTIES)

Carpenter (Welders).........$ 28.23 12.16 Carpenters..................$ 27.53 12.16

CARPENTER (BEDFORD, BLAIR,

CAMBRIA, CAMERON, CENTRE,

CLARION, CLINTON, CLEARFIELD,

CRAWFORD, ELK, FOREST,

FRANKLIN, FULTON, HUNTINGDON,

INDIANA, JEFFERSON, MCKEAN,

MIFFLIN, POTTER, SOMERSET,

VENANGO, AND WARREN COUNTIES)

Carpenters (Welders).......$ 27.99 12.16 Carpenters..................$ 27.28 12.16

ELEC0005-006 12/26/2008

ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON,

CENTRE (Remainder), CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, SOMERSET, VENANGO, WASHINGTON, AND WESTMORELAND COUNTIES

ELECTRICIAN......................$ 33.11 3%+$15.65

ELEC0056-004 06/01/2009

ERIE, FOREST AND WARREN COUNTIES

ELECTRICIAN......................$ 25.90 3%+16.32

ELEC0126-005 06/01/2008

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, CAMBRIA, CENTRE,

CLARION, CLEARFIELD, FAYETTE, FULTON, GREENE, HUNTINGDON,

INDIANA, JEFFERSON, SOMERSET, WASHINGTON AND WESTMORELAND

Line Construction:

Groundman...................$ 21.22 26%+5.55 Lineman.....................$ 37.45 26%+5.55 Truck Driver................$ 23.09 26%+5.55 Winch Truck Operator........$ 24.96 26%+5.55

ELEC0126-007 06/01/2008

FRANKLIN AND MIFFLIN COUNTIES

Rates Fringes

Line Construction:

Groundman...................$ 19.63 26%+5.55 Lineman.....................$ 34.65 26%+5.55 Truck Driver................$ 21.36 26%+5.55 Winch Truck Operator........$ 23.10 26%+5.55

ELEC0143-007 06/01/2009

FRANKLIN and MIFFLIN COUNTIES

Rates Fringes

ELECTRICIAN......................$ 27.20 14.69

ELEC0712-003 03/02/2009

CRAWFORD, BEAVER, LAWRENCE AND MERCER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 29.20 17.48

ELEC0812-008 06/01/2007

CLINTON COUNTY

Rates Fringes

ELECTRICIAN......................$ 24.34 14.58

ELEC0812-009 06/01/2007

POTTER COUNTY

ELECTRICIAN......................$ 25.35 14.61

ELEC0812-011 06/01/2007

CENTRE COUNTY (Burnside, Curtin, Liberty, Howard, Marion, Walker, Miles, Haines Townships)

ELECTRICIAN......................$ 25.35 14.61

ELEC1319-004 08/31/2008

BUTLER, CAMERON, CLINTON, CRAWFORD, ELK, ERIE, FOREST,

LAWRENCE, MCKEAN, MERCER, VENANGO, WARREN AND POTTER COUNTIES

Line Construction:

Groundman...................$ 24.53 17.13 Heavy Equipment Operator....$ 39.17 17.13 Lineman.....................$ 39.57 17.13 Truck Drivers...............$ 25.72 17.13

ENGI0066-016 01/01/2009

Rates Fringes

Power equipment operators:

(ALLEGHENY, ARMSTRONG,

BEAVER, BLAIR, BUTLER,

CAMBRIA, CENTRE, CLARION,

CLEARFIELD, CRAWFORD, ERIE,

ELK, FAYETTE, GREENE,

INDIANA, JEFFERSON, LAWRENCE,

MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON,

AND WESTMORELAND COUNTIES)

GROUP 1.....................$ 26.38 14.44

GROUP 2.....................$ 26.12 14.44

GROUP 3.....................$ 22.47 14.44

GROUP 4.....................$ 22.01 14.44

GROUP 5.....................$ 21.76 14.44

Power equipment operators:

(BEDFORD, CAMERON, CLINTON,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, MIFFLIN, AND

POTTER COUNTIES)

GROUP 1.....................$ 26.09 14.44

GROUP 2.....................$ 25.81 14.44

GROUP 3.....................$ 22.17 14.44

GROUP 4.....................$ 21.68 14.44

GROUP 5.....................$ 21.47 14.44

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1 - Asphalt Paving Machine (Spreader), Autograde (C.M.I. and similar); Backfiller, Compactor with Blade, Backhoe - 360 and 180 degree Swing; Cableway; Caisson Drill (similar to Hugh Williams), Central Mix Plant; Cooling Plant; Concrete Paving Mixer, Concrete Pump (self-propelled); Cranes; Cranes (boom or mast over 101ft.$.50 per each additional 50 feet inclusive of jib), Cranes (Tower Stationary- Climbing Tower Crane); Derrick; Derrick Boat; Dozer(greater than 25,000 lbs.); Dragline; Dredge;

Dredge Hydraulic; Elevating Grader; Franki Pile Machine;

Gradall (remote control or otherwise),Grader (power-fine grade); Hllift (4 cy. and over); Hoist 2 Drums or more (in one unit); Hydraulic Boom Truck with pivotal cab (single motor-Pitman or similar), (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used;)

Kocal; Mechanic, Locomotive (std. Gauge); Metro-chip Harvester or similar; Milling Machine (Roto Mill or similar); Mix Mobile; Mix Mobile (with Self Loading Attachment), Mucking Machine (tunnel); Pile Driver Machine;

Pipe Extrusion Machine; Prespliter Drill (self contained);

Refrigeration Plant (soil Stablization) Rough Terrain Crane (25 ton over) (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used); Rough Terrain Crane (under 25 ton), Scrapers; Shovel-Power; Slip form Paver (C.M.I. and similar); Trenching Machine (30,000 lbs.

and over), Trenching Machine (under 30,000 lb.), Tunnell Machine (Mark XXI Jarva or similar), Vermeer Saw, Whirley, Mechanic, Pipe bursting machine, Slip Lining machine

GROUP 2: Asphalt plant operator; auger (tractor mtd.); auger (truck mtd.); belt loader (euclid or similar); boring machine; cable placer or layer; compactor with blade, concrete batch plant (electronically synchronized);

concrete belt placer (C.M.I. and similar); concrete finishing machine and spreader, concrete mixer (over 1 cy.)

concrete pump (stationary); core drill (truck or skid mtd.

- similar to penn drill), dozer (25,000 lbs or less); Ditch Witch Saw, force feedloader; fork lift (lull or similar);

grader - power; grease unit opertor (head); guard rail post driver (truck mounted) guard rail post driver (skid type);

hilift (under 4 cy.); skid steer loader; hydraulic boom truck (non-pivotal cab); job work boat (powered), jumbo operator; locomotive (narrow guage); minor equipment operator (accumulative four units); mucking machine;

multi-head saw (groover); overhead crane; roller -power-asphalt; ross carrier; side boom or tractor mounted boom;

shuttle buggy (asphalt), stone crusher (screening-washing plants); stone spreader (self propelled) truck mounted drill (davey or similar); welder and repairman; well point pump operator.

GROUP 3: Broom Finisher (C.M.I. or similar);

Compactors/Rollers (static or vibratory (Self-propelled) on dirt or stone; Curb Builder; Minor Equipment Opertor (two or three units); Multi-head Tie Tamper; Pavement Breaker (self-propelled or ridden); Soil Stablizer Machine; Tire Repairman; Tractor (snaking and hauling); Well Driller and Horizontal: Winch or "A" Frame Truck (when hoisting and lowering).

GROUP 4: Ballast Regulator; Compressor; Concrete Mixer (1

cy. & under with skip); Concrete Saw (Ridden or selp-propelled); Conveyor; Elevator (Material hauling only); Fork-lift (Ridden or self-propelled); Form Line Machine; Generator; Groute Pump; Heater (Machinical); Hoist (single Drum); Ladavator, Light Plant; Mulching Machine;

Personnel Boat (Powered), Pulverizer, Pumps, Seeding Machine, spray Cure Machine (powered Driven); Subgrader;

Tie Puller; Tugger; Welding Machine (Gas or Diesel).

GROUP 5: Deck Hand; Farm Tractor; Fireman on Boiler; Oiler;

Power Broom; Side Delivery Shoulder Spreader (attachment).

IRON0003-001 06/01/2009

ALLEGHENY, FAYETTE, WESTMORELAND, CAMBRIA, INDIANA, ARMSTRONG,

BUTLER, BEAVER, CLARION, AND WASHINGTON COUNTIES

IRONWORKER.......................$ 29.43 21.25

IRON0207-002 06/01/2009

LAWRENCE, MERCER, AND VENANGO COUNTIES

Rates Fringes

IRONWORKER.......................$ 26.66 16.83

IRON0348-002 06/01/2009

CRAWFORD, ERIE, FOREST, AND WARREN COUNTIES

Rates Fringes

IRONWORKER.......................$ 25.33 20.17

IRON0404-008 07/01/2009

FRANKLIN (Remainder), HUNTINGDON (Remainder), AND MIFFLIN

COUNTIES

IRONWORKER, STRUCTURAL...........$ 27.07 21.85

IRON0549-002 12/01/2008

GREENE COUNTY

Rates Fringes

IRONWORKER.......................$ 28.75 10%+15.69

IRON0568-004 05/01/2009

BEDFORD, FRANKLIN (Southwest 1/3), FULTON, HUNTINGDON (Western

2/3), AND SOMERSET COUNTIES

Ironworkers:

Sheeter, Bucker-Up..........$ 26.33 12.88 Structural, Ornamental, Reinforcing, Machinery Mover, Rigger & Machinery Erector, Welder, Fence Erector.....................$ 26.08 12.88

IRON0772-001 06/01/2009

BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON,

MCKEAN AND POTTER COUNTIES

IRONWORKER.......................$ 24.73 19.94+A

A. HOLIDAYS

The following holidays shall be observed: New Years Day, Goodfriday, Memorial Day, Fourth of July, Labor Day, Veterans Day (Observed the day after Thanksgiving), Thanksgiving Day, Christmas Day.

Any holiday which occurs on Sunday shall be observed the following Monday.

LABO1058-001 01/01/2009

Rates Fringes

LABORER (BEDFORD, CAMERON,

CENTRE, CLINTON, CRAWFORD,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, JEFFERSON,

MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 23.20 12.65

GROUP 2.....................$ 23.36 12.65

GROUP 3.....................$ 23.85 12.65

GROUP 4.....................$ 24.30 12.65

GROUP 5.....................$ 24.71 12.65

GROUP 6.....................$ 21.55 12.65

GROUP 7.....................$ 24.20 12.65

GROUP 8.....................$ 25.70 12.65

Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND

COUNTIES)

GROUP 1.....................$ 23.30 12.65

GROUP 2.....................$ 23.46 12.65

GROUP 3.....................$ 23.85 12.65

GROUP 4.....................$ 24.30 12.65

GROUP 5.....................$ 24.71 12.65

GROUP 6.....................$ 21.55 12.65

GROUP 7.....................$ 24.30 12.65

GROUP 8.....................$ 25.80 12.65

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt curb sealer; Asphalt tamper; Batcherman (weigh) Blaster,Boatman, Brakeman, Change house attendant, Coffer dam, Concrete curing pitman, Puddler, Drill Runner's helper (Includes Drill Mounted on Truck, Track, or similar and Davey Drill Spots, Clean up, helps to maintain), Electric Brush and or Grinder, Fence Construction (Including Fence Machine Operator) Form stripper and Mover, Gabion (Erectors and Placers) Hydro jet blaster nozzleman;

Landscape laborer, Manually moved emulusion sprayer, Radio actuated traffic control operator Rip rap work, scaffolds and Runways, Sheeters and Shorers (includes lagging) structural concrete Top Surfacer, Walk Behind Street Sweeper, and Wood Chipper

GROUP 2: Air tool operator (all types); Asphalt, batch & concrete plant operator (manually operated) Burner, Caisson; men (open air); Carryable pumps; Chain saw operator including attachments, Cribbing, (concrete or steel); Curb machine operator (asphalt or concrete walk behind); Diamond head Core Drller, Drill runner's helper (tunnel) Fork Lift, (walk behind), Form Setter (Road Forms Line man) Highway Slab reinforcement placers (including joint and Basket Setters) Hydraulic pipe pusher; Liner plates (Tile or Vitrified Clay) Mechanical compacting equipment operators, Mechanical joint sealer, Dope pot and Tar Kettle, Mortar mixer (hand or machine) Muckers, Brakemen & all other Labor, (Includes installation of utility lines) Pipe Layers /Fusion /Heating Iron (Regardless of materials) Portable Single Unit Conveyor, Post Hole Auger, (2 or 4 cycle hand operated) Power wheelbarrows and buggies, Rail porter or similar; Sand blaster;Signal Man,Vibrator operator, Crown Screed Adjuster, All RAILROAD TRACK WORK TO INCLUDE THE FOLLOWING:

adzing machine, ballast Router, Bolting Machine, Power Jacks, Rail Drills, Railroad Brakeman,Rail Saws, Spike Drivers (Manually or hand held tool) Spike Pullers Tamping Machine, Thermitweld

GROUP 3: Asphalt Luteman/Raker,Blacksmith, Blaster, Brick, stone and block pavers and block cutters (wood, belgian and asphalt); Cement mortar lining car pusher; Cement mortar mixer (pipe relining); Cement mortar pipe reliners;

concrete saw operator (walk behind); Curb cutters and setters; Elevated roadway drainage construction; erector of overhead signs, Form setter (road forms-lead man); Grout machine operator; Gunite or dry pack gun (nozzle and machine man); Manhole or catch basin builder (Brick block concrete or any prefabrication) Miners and drillers (including lining, supporting and form workmen, setting of shields, miscellaneous equipment and jumbos); Multi-plate pipe (aligning and securing); Placing wire mesh on gunite projects; Wagon drill operators (air track or similar);

Walk behind ditching machine (trencher or similar)

GROUP 4: Reinforcing Steel Placer (Bending, aligning, and securing, Cadweld)

GROUP 5:High Burner, (Any burning not done from deck), Welder (Pipeline)

GROUP 6: Uniformed Flagperson, Watchman

GROUP 7: Toxic/Hazardous Waste Removal Laborer Levels C & D

GROUP 8: Toxic/Hazardous Waste Removal Laborer Levels A & B

PAIN0021-019 05/01/2009

CLINTON COUNTY

Rates Fringes

Painters:

Bridge......................$ 25.60 12.05 Brush & Roller..............$ 24.65 12.05 Spray.......................$ 25.65 12.05

PAIN0021-024 05/01/2009

FRANKLIN COUNTY

Rates Fringes

PAINTER

Brush.......................$ 22.17 8.90

PAIN0057-014 06/01/2009

ALLEGHENY, FAYETTE, GREEN, WASHINGTON COUNTIES

Rates Fringes

Painters:

Bridge......................$ 30.10 12.34 Brush & Roller..............$ 27.53 12.34 Spray.......................$ 28.06 12.34

PAIN0057-015 06/01/2009

ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE,

CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA,

JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND

WESTMORELAND COUNTIES

Painters:

Bridge......................$ 30.10 12.34 Brush and Roller............$ 27.53 12.34 Spray.......................$ 28.06 12.34

PAIN0057-022 05/01/2009

Rates Fringes

Painters: (ERIE, McKEAN, AND WARREN (Including Columbus and Freehold twps) COUNTIES) Bridges,Stacks,Towers.......$ 22.52 11.60 Brush and Roller............$ 20.52 11.60 Spray and Sandblasting......$ 21.27 11.60

PAIN0057-027 06/01/2009

CAMERON, CRAWFORD, POTTER, WARREN, (Excluding Columbus and Freehold twps)

PAINTER

Brush and Roller............$ 22.49 11.84

PLAS0526-002 01/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

Beaver, Cameron, Clarion, Crawford, Elk, Forest, Lawrence, McKean, Potter, Venango and Warren Counties....................$ 26.72 12.97 Bedford, Blair, Cambria, Centre, Clinton, Huntingdon, Mifflin and Somerset Counties...........$ 26.72 12.97 All Other Counties..........$ 26.72 12.97

PLUM0027-001 06/01/2009

ALLEGHENY, ARMSTRONG, GREENE (Except extreme Eastern portion), WASHINGTON (Except extreme Eastern portion) and WESTMORELAND (City of Arnold and City of New Kensington Only) COUNTIES

Plumbers and Pipefitters (Bridge Drain Pipe)..............$ 33.75 16.37

PLUM0047-005 05/01/2009

BEAVER, BUTLER, MCKEAN, MERCER, VENANGO, CLARION, LAWRENCE,

FOREST, WARREN, CRAWFORD, AND ERIE COUNTIES

(Bridge Drain Pipe)..............$ 34.18 16.90

PLUM0354-005 06/01/2009

BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE,

GREENE (Extreme Eastern portion), HUNTINGDON, INDIANA, JEFFERSON, SOMERSE, WASHINGTON (Extreme Eastern portion), AND

WESTMORELAND COUNTIES

(Bridge Drain Pipe)..............$ 28.54 18.48

TEAM0040-001 01/01/2009

Rates Fringes

TRUCK DRIVER (ALLEGHENY,

ARMSTRONG, BEAVER, BLAIR,

BUTLER, CAMBRIA, CENTRE,

CLARFIELD, CRAWFORD, ERIE,

FAYETTE, GREENE, INDIANA,

JEFFERSON, LAWRENCE, MCKEAN,

MERCER, SOMERSET, VENANGO,

WARREN, WASHINGTON, AND

WESTMORELAND)

GROUP 1.....................$ 24.23 $11.44 A+B

GROUP 2.....................$ 24.38 $11.51 A+B

GROUP 3.....................$ 24.91 $11.75 A+B

Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 24.05 $11.35 A+B

GROUP 2.....................$ 24.23 $11.44 A+B

GROUP 3.....................$ 24.74 $11.69 A+B

FOOTNOTES: A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate

B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1 - Single Axle (2 axles including steering axle);

Includes partsman and warehoueman

GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer (combination) (3 axles or more including steering axle)

GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);

Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

52.222-4000 WAGE RATES (May 2005)

The attached schedule of wage rates, Department of Labor General Decision No. PA080004 07/24/2009 PA4 contains rates applicable to all work under the contract.

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at 15% percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)