ALCON Attached you will find the most updated Q A. I added one more question- 19. Please let me know if you have any questions/.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Signature_Technical_Support_Solicitation_Modification_2.pdf | ||
| Signature_Technical_Support_Solicitation_Modification.pdf | ||
| STS_Questions_Answers_Final.docx | DOCX document | |
| STS_Questions_Answers_Final.docx | DOCX document | |
| STS_Memo_for_Record-glitch_in_system.pdf | ||
| STS_Questions_ _Answers.docx | DOCX document | |
| Signature_Technical_Support_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Signature Technical Support Questions and Answers
1. Question: I am hoping to find out if there is an incumbent contractor currently performing these services.
Answer: The current Bridge Contract is W911W5-16-C-0003 and, it is with EOIR Technologies Inc., 10300 Spotsylvania Ave STE 420, Fredericksburg, VA 22408-2697.The previous contract was W911W5-10-D-0004 with the same vendor
2. Question: Several tasks relate to ThermoAnalytics' activities, but this one does especially: "1.3.2.2 Support Tasks Specific to Geophysical and IR Predictive Codes.
The Contractor shall use predictive codes to model parameter changes of ground and rotary-winged systems and the effect upon the system's geophysical or IR signature. The Contractor shall use IR predictive code software ThermoAnalytics’ MUSES to analyze..."
Do you have any suggestions for us on how we could be involved with this? It looks like a recurring IDIQ contract that is up for 5 year renewal. We're wondering how to propose involvement on a targeted task basis (like this 1.3.2.2 Support Task).
Answer: If a contractor cannot propose for the entire requirement, then they can find another contractor(s) and team with them to cover the entire requirement.
3. Question: Table L.1 (page 85) states that the page limit for Volume III is 6 pages. This volume needs to include the Technical Capability Section and Management Section (L.4.3 and L.4.4 on pages 86-88). The Management Section includes resumes for key personnel as well as the geophysical and IR analyst resumes and that the name should "appear centered at the top of the first page of the resume" which implies at least one page per resume. This would not give sufficient space in Volume III to complete the other requirements needed for that volume. Question: Are resumes included in the page count?
Answer: You deserve a more detailed answer as the original answer was “yes”, but those 6-pages were only the resumes and did not include all of the pages needed to reply to the remaining requested proposal information. Use the plan as given below for a page count.
Volume III
| Technical Capability Section | |||
| Technical Approach to the IDIQ | 3 pages | ||
| Technical Approach to the Sample Task Order | 2 pages | ||
| Management Section (Mark to differentiate from the |
Technical Capability Section)
| Program-Specific Management Plan | 1 Pages | ||||
| Subcontractor Management | 1 Page | ||||
| Security Plan | 1 Page | ||||
| Staffing | 1 Page | ||||
| Transition | 1 Page | ||||
| Program Management Plan (do not include | |||||
| Resumes here) | 1 Page | ||||
| Quality Control Plan | 3 Pages | ||||
| Personnel Resumes | 6 Pages | ||||
| Total Pages Volume III | 20- Pages |
Of the 20 possible pages there shall be no more than 6 pages of resumes. The Technical capability section shall be no more than 5 pages. The Management Section, not including resumes, shall be no longer than 9 pages with 3 pages for the Quality Control Plan and the remainder has to be on the allotted 6 pages. In your response, you should not cover the same provided information twice.
4. Question: Per section H020, a Small Business Subcontracting Plan is required by all large businesses. Item (d) notes that the Government reserves the right to request the submission of Small Business Subcontracting Plans at the IDIQ and/or Task Order level. Question: Is this a requirement as stated? If not, will the appropriate Clauses Section H, clause H020 and FAR 52.219-9 be removed?
Answer: This is not required and it will be removed.Subcontracting plans are required by large businesses but does not mean you have to go out and find a small business to partner with. If you as a large company will be doing all the work yourself then that is fine-but have a subcontracting plan just in case you do have to sub out. If all the proposals come back and all the companies show that they will do all the work themselves then this will be removed. So I will not be removing H020 or 52.219-9 until I see what the proposals say.
5. Question: Key personnel listed in section H012 shows Contract Manager and Alternate Contract Manager as key personnel, while Section L.4.4.h suggests the Key Personnel as Geophysical and IR analyst. Question: Are the Contract Manager and Alternate Contracts Manager to be considered Key Personnel.
Answer: The key personnel have been changed in Section H012. The key personnel are Geophysical and IR analyst.
6. Question: Section H012, Key Personnel, references the FME Support Performance Work Statement (PWS). Question: Should that be removed?
Answer: Yes, it has been removed.
7. Question: For costing, section L4.5.8 asks offerors to develop a total proposed price for each Sample Task Order, yet only one Sample Task Order is included in the RFP. Question: Is there supposed to be more than one Sample Task Order in the RFP?
Answer: There is the base task order in Section C and there is the sample task order in the attachments. For costing, you are developing your total price off of the Task Order in Attachment 2.
8. Question: Would the government clarify if we are responding to an IDIQ proposal or a Task Order proposal. Or is one proposal response applicable to both the IDIQ and TO One (1) attachment?
Answer: Read question 7.
9. Question: Would the government clarify if additional Period of Performances will be applicable following the initial periods of 4 Sep 2016 - 3 Mar 2017?
Answer: Additional Task Orders on this IDIQ contract may be written depending on funding.
10. Question: Does the contractor need to provide a local storage facility to house the GFE property? If so, within what distance of NGIC? What will be the minimum size of that facility?
Answer: The NGICNational Ground Intelligence Center is where all the GFE is housed and where the contractor will reside and for the most part work..
11. Question: Would the government consider a classified proposal be submitted via SIPR or JWICS network(s)?
Answer: The Government does not anticipate the need for a classified proposal. If prior past performance has been classified, then sanitize the classified aspects and concentrate on the how you accomplished the CPED of the Past Performance. Example: A classified collection of a small arm (sniper rifle) was made. Do not use the classified name, just say “A collection was made of a sniper rifle. Do not give the actual results but how you derived the results.
12. Question: Would the government clarify who is considered Key Personnel?
Answer: Key personnel are considered the person or persons representing the IR analyst, geophysical analyst, and the person setting up the collection platforms for the collection modalities. Also, all funded contract management needs to be associated with the above mentioned Key Perasonnel.
13. Question: Would the government clarify if the Historic staffing in Section C is applicable to Attachment 2?
Answer: The Historic Staffing was provided just to say, “This is how this contract was accomplished in the past.” It was for the benefit of all those proposing to provide a historical baseline. Each offeror can decide how they would solve the manpower resource problem to accomplish the Sample Task Order independently.
14. Question: Would the Gov’t consider an extension from 23 May to 26 May?
Answer: No
15. Question: Section L.4 Table L.1. The Section L Reference column says that IV Past Performance is L4.4. Please clarify that it is L.4.
Answer: It is L.4.5 and Cost will be changed to L 4.6.
15. Question: Section L.4 Table L.1 The Page Limit Total for III Technical is 6 pages. Please confirm that the Page Limit Total for all of L.4.3 and L.4.4 is only 6 pages.
Answer: The answer to this question is given in Question 3.
16. Question: Please clarify that resumes are EXCLUDED from the Page Limit Total.
Answer: Answered above – see response to Question 3.
17. Question: If Resumes are excluded from the page count is there a page limit for each resume? Please clarify.
Answer: Answered above - see response to Question 3.
18. Question: Section A – Solicitation/Contract Form : DELIVERY OF PROPOSALS – (a) Mailing Address and Section L.6.2 Proposals will be submitted electronically to the KO via email.
Answer: I don’t understand what you are asking but email your proposals to quammie.j.semper.mil@mail.mil, jessica.c.mullins.civ@mail.mil and usarmy.charlottesville.ngic.mbx.ngic-contracting@mail.mil. No hard copies needed.
19. Question: Per RFP Section L.4.5.2, “offerors shall provide an IDIQ FFP proposal to perform work identified in the PWS and Sample Task Order.”
Question: Please confirm that offerors shall submit two (2) separate pricing tables (Table L.4 - Pricing Summary Table); one for the work identified in the IDIQ PWS for the IDIQ period of performance (5 years) and supported by our Volume III - Technical Approach to the IDIQ, and another for the Sample Task for the period of performance (6 months) and supported by our Volume III - Technical Approach to the Sample Task Order.
Answer: You are only proposing for the Sample Task Order in Section J-the attachment. I misspoke in Per RFP Section L.4.5.2, “offerors shall provide an IDIQ FFP proposal to perform work identified in the PWS and Sample Task Order.” We only need it for the sample because we don't know what our future Task Orders will hold. If you could provide us with the Labor rates for those future years, that would be good.