ADD1_Narrative_2474Kitchenette.pdf

PDF 134 KB Posted

Attached to
B2474 Kitchenettes
Solicitation number
W911SG26BA006
Issued by

About this file

This is an addendum to a federal contract drawing package for a kitchenette renovation project (FY26_2474_11B 10115 6P_Kitchenette) issued by the Directorate of Public Works on July 7, 2026.

The addendum modifies architectural, mechanical, plumbing, and electrical drawings across seven sheets (A-101, A-102, A-103, M-101, P-100, P-101, and E-101). Primary changes involve relocating drinking fountains from corridor locations to kitchenette areas throughout the project. Specific modifications include: removing drinking fountains and associated keyed notes from multiple corridor locations on sheets A-101, A-103, M-101, P-101, and E-101; adding drinking fountains to kitchenette locations on sheets M-101 and P-101; adding an electric water cooler to the kitchenette on sheet A-103; extending plan 1/P-100 to show a new corridor drinking fountain; adding keyed note #13 to sheet A-102; and revising keyed note #3 on sheet P-101 with detailed plumbing specifications requiring a 1-1/2" vent line through wall and above ceiling, connection to nearest vent pipe, and core drilling of existing concrete floor with fire stopping material and sealant at penetrations. On sheet E-101, electrical modifications include adding GFCI protection at the receptacle for the new drinking fountain and adding an additional receptacle at the kitchenette location.

View the file

Other files

File Type Posted
Abstract of Offerors OF_1419 Page 2.pdf PDF
Abstract of Offerors OF_1419 Page 1.pdf PDF
Solicitation - W911SG26BA006..pdf PDF
RFI Answers B2474.pdf PDF
ADD1_DWG_2474Kitchenette.pdf PDF
Solicitation Amendment W911SG26BA0060001 SF 30.pdf PDF
Basement Pictures.pdf PDF
Sign-in sheet.pdf PDF
DWG_FY26_2474.pdf PDF
Statement of Work (SOW).pdf PDF
As-Builts 1.pdf PDF
Asbestos Lead Survey_Bldg-2474.pdf PDF
Solicitation - W911SG26BA006.pdf PDF
As-Builts 3.pdf PDF
As-Builts 2.pdf PDF
Asbestos Closeout Report_Bldg-2474.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Directorate of Public Works

ESD

July 7, 2026

ADDENDUM #1 Narrative - FY26_2474_11B 10115 6P_Kitchenette

Drawings

1. Sheet A-101

a. Remove the drinking fountain and associated Keyed Note at the corridor from 1/A-101.

b. Remove the drinking fountain and associated Keyed Note at the corridor from 2/A-101.

c. Remove Keyed Note #8.

2. Sheet A-102

a. Add Keyed Note #13 to Plan 1/A-102.

3. Sheet A-103

a. Remove the drinking fountain and associated Keyed Note at the corridor from 1/A-103.

b. Remove the drinking fountain and associated Keyed Note at the corridor from 2/A-103.

c. Add electric water cooler to 2/A-103 at kitchene e.

4. Sheet M-101

a. Remove the drinking fountain and associated Keyed Note at the corridor from 1/M-101.

b. Remove the drinking fountain and associated Keyed Note at the corridor from 2/M-101.

c. Add drinking fountain to 2/M-101 at kitchene e.

5. Sheet P-100

a. Extend plan 1/P-100 to show new drinking fountain at corridor.

6. Sheet P-101

a. Remove the drinking fountain and associated Keyed Note at the corridor from 1/P-101.

b. Remove the drinking fountain and associated Keyed Note at the corridor from 2/P-101.

c. Add drinking fountain to 2/P-101 at kitchene e.

d. Revise Keyed Note #3 to read, “NEW DRINIKNG FOUNTAIN AS SPECIFIED. PROVIDE 1-1/2” VENT

LINE THROUGH WALL AND ABOVE CEILING. CONNECT TO NEAREST VENT PIPE. CORE DRILL

EXISIGN CONCRETE FLOOR TO CONNECT 1-1/2” DRAIN LINE FROM SECOND FLOOR AND

PROVIDE FIRE STOPPING MATERIAL AND SEALANT AT PENETRATIONS.”

7. Sheet E-101

a. Remove the drinking fountain and associated Keyed Note at the corridor from 1/E-101.

b. Remove the drinking fountain and associated Keyed Note at the corridor from 2/E-101.

c. Add drinking fountain to 2/P-101 at kitchene e.

d. Add “GFCI” at receptacle for new drinking fountain at 2/E-101.

e. Add addi onal receptacle at 2/E-101.

END OF ADDENDUM #1

File details come from the government source that posted it. Updated .