Asbestos Closeout Report_Bldg-2474.pdf

PDF 514 KB Posted

Attached to
B2474 Kitchenettes
Solicitation number
W911SG26BA006
Issued by

About this file

This is an Asbestos Air Monitoring Close-Out Report documenting the completion of asbestos abatement activities at Building 2474, Fort Bliss, Texas.

ENCON International, Inc. conducted asbestos removal work from October 22-23, 2009, under project number 117-09-029 for the Department of Public Works (DPW) at Fort Bliss. The abatement involved the removal of approximately 315 square feet of 12" x 12" black floor tile and mastic from the basement of Building 2474. Air monitoring was performed in three phases: baseline sampling on October 21, 2009; ambient air monitoring during removal activities on October 22, 2009; and clearance sampling on October 23, 2009. All clearance air samples indicated airborne asbestos fibers below the EPA Clean Air Standard of 0.01 fibers per cubic centimeter (f/cc) using Phase Contrast Microscopy by NIOSH 7400 Method. Specifically, clearance sampling results showed 0.001 f/cc, 0.000 f/cc, and 0.000 f/cc at the three monitoring locations (East Doorway, North-center Wall, and West Doorway), all reporting as less than 0.005 f/cc under the limit of quantification. Area sampling during abatement activities on October 22-23, 2009 demonstrated effective containment, with most samples below quantification limits. Monometer readings documented negative pressure containment ranging from -0.032 to -0.054 inches of water column throughout work activities. The project was completed and cleared by October 23, 2009, with the report prepared by ENCON International on October 27, 2009.

View the file

Other files

File Type Posted
Abstract of Offerors OF_1419 Page 2.pdf PDF
Abstract of Offerors OF_1419 Page 1.pdf PDF
Solicitation - W911SG26BA006..pdf PDF
RFI Answers B2474.pdf PDF
ADD1_DWG_2474Kitchenette.pdf PDF
Solicitation Amendment W911SG26BA0060001 SF 30.pdf PDF
ADD1_Narrative_2474Kitchenette.pdf PDF
Basement Pictures.pdf PDF
Sign-in sheet.pdf PDF
DWG_FY26_2474.pdf PDF
Statement of Work (SOW).pdf PDF
As-Builts 1.pdf PDF
Asbestos Lead Survey_Bldg-2474.pdf PDF
Solicitation - W911SG26BA006.pdf PDF
As-Builts 3.pdf PDF
As-Builts 2.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

Engineering, Environmental & Technical Services

ASBESTOS AIR MONITORING CLOSE-OUT REPORT

BUILDING 2474

FORT BLISS, TEXAS 79916

Prepared for:

Mr. Henry Wilson, P.E.

DPW

Building 777

Fort Bliss, Texas 79916

Prepared by:

ENCON International, Inc.

7307 Remcon Circle, Suite 103

El Paso, Texas 79912

Date of Completion:

October 23, 2009

ENCON Project No. 117-09-029

E

N C O N INTERNATIONAL, INC.

October 27, 2009

Mr. Henry Wilson, P.E. Phone: (915) 568-2300

Asbestos & Lead Manager Via email: Henry.C.Wilson@us.army.mil

DPW, Bldg. 777

Fort Bliss, TX 79916

RE: ASBESTOS AIR MONITORING CLEARANCE LETTER

Building 2474

Fort Bliss, TX 79916

Dear Mr. Wilson, ENCON presents the air monitoring results for the abatement activities at Building 2474, Fort

Bliss, TX, 79916.

The abatement began on October 22, 2009 and ended October 23, 2009.

The work consisted of the removal of approximately 315 square feet of 12” x 12” black floor tile and mastic located in the basement of building 2474. A visual inspection was performed prior to clearance air sampling. In addition to the clearance sampling performed on October 23, 2009, ambient air monitoring was conducted inside and outside of the containment during removal activities. All Clearance air samples indicated airborne fibers below EPA Clean Air Standard of

0.01 fibers per cubic centimeter by Phase Contrast Microscopy by NIOSH 7400 Method.

For additional information regarding this project please contact the Asbestos Project Manager listed below.

Sampling Reviewed by:

performed by:

Leah A. Porras Alicia Orrantia

Air Monitor Technician Project Manager

Attachments:

Air Sampling Results

Air Sample Location Drawing

Air Monitoring Chains of Custody

Project Manager Daily Logs

Monometer Readings

Phase Contrast Microscopy Report

Project #: 117-09-029 Sample Type: Clearances

Building #: 2474 Sample Date: 10/23/09

Client Lab Location Fibers Flow Rate Total Time Results

Reporting

Results

Sample No. Sample No. (liters/min) (minutes) (f/cc) *(f/cc)

117.09.029.2474.1023.C1 2028 East Doorway 2.0 9.5 135 0.001 <0.005

117.09.029.2474.1023.C2 2029 North-center Wall 0.0 9.5 135 0.000 <0.005

117.09.029.2474.1023.C3 2030 West Doorway 0.5 9.5 135 0.000 <0.005

117.09.029.2474.1023.FB1 2033 Field Blank 1 0.0 - - - -

117.09.029.2474.1023.FB2 2034 Field Blank 2 0.0 - - - -

*Limit Of Quantification: 0.005 f/cc

Analyst's signature: Date: 10/23/09

Analyzed by Analytical Method NIOSH 7400; Counting Rules "A"

95% Confidence Level

TDH Asbestos PCM Laboratory License #300385

7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Phone 915-833-3740 Fax 915-581-2049

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

CHAIN OF CUSTODY

Project #: 117-09-029

Building#: 2474

Date: 10-23-09 Sample Type: Clearances

Sample ID Pump Time

On

Flow

Rate

Time

Off

Flow

Rate

Total

Time

Avg.

Flow

Volume Location

117.09.029.2474.1023.C1 5 9:15a 9.5 11:30a 9.5 135 9.5 1282.5 East Doorway

117.09.029.2474.1023.C2 9 9:15a 9.5 11:30a 9.5 135 9.5 1282.5 North-center Wall

117.09.029.2474.1023.C3 1 9:15a 9.5 11:30a 9.5 135 9.5 1282.5 West Doorway

117.09.029.2474.1023.FB1 NA - - - - - - - Field Blank 1

117.09.029.2474.1023.FB2 NA - - - - - - - Field Blank 2

Client: DPW, Building 777 Fort Bliss, Texas 79916

Contractor: KEERS Environmental

Logged in by: Leah A. Porras

E N C O N INTERNATIONAL, INC.

ENCON International, Inc.

Air Sample Locations

ENCON #: 117-09-029

Date: 10/27/09 N.T.S

Bldg. 2474

Basement

Air Sample Location Drawing

A = Area Samples

B = Baseline Samples

C=Clearances Samples

U p

U p

B3

B2

B1

A3

A2

A1

A5

*Please Note: A4 is at the 1 st Floor Stairway Entrance

C3

C2

C1

Project #: 117-09-029 Sample Type: Baselines

Building #: 2474 Sample Date: 10/21/09

Client Lab Location Fibers Flow Rate Total Time Results

Reporting

Results

Sample No. Sample No. (liters/min) (minutes) (f/cc) *(f/cc)

117.09.029.2474.1021.B1 2035 East Doorway 3.0 7 180 0.001 <0.005

117.09.029.2474.1021.B2 2036 North-center Wall 0.0 7 180 0.000 <0.005

117.09.029.2474.1021.B3 2037 West Doorway 5.5 7 180 0.002 <0.005

117.09.029.2474.1021.FB1 2038 Field Blank 1 0.0 - - - -

117.09.029.2474.1021.FB2 2039 Field Blank 2 0.0 - - - -

*Limit Of Quantification: 0.005 f/cc

Analyst's signature: Date: 10/26/09

Analyzed by Analytical Method NIOSH 7400; Counting Rules "A"

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

Date: 10-21-09 Sample Type: Baselines

Flow

Rate

Time

Off

Flow

Rate

Total

Time

Avg.

Flow

Volume Location

117.09.029.2474.1021.B1 3 1:15p 7.0 4:15p 7.0 180 7.0 1260.0 East Doorway

117.09.029.2474.1021.B2 5 1:15p 7.0 4:15p 7.0 180 7.0 1260.0 North-center Wall

117.09.029.2474.1021.B3 8 1:17p 7.0 4:17p 7.0 180 7.0 1260.0 West Doorway

117.09.029.2474.1021.FB1 NA - - - - - - - Field Blank 1

117.09.029.2474.1021.FB2 NA - - - - - - - Field Blank 2

Project #: 117-09-029 Sample Type: Areas

Building #: 2474 Sample Date: 10/22/09

Client Lab Location Fibers Flow Rate Total Time Results

Reporting

Results

Sample No. Sample No. (liters/min) (minutes) (f/cc) *(f/cc)

117.09.029.2474.1022.A1 2040 I/C North-center Wall 8.0 4 215 0.005 <0.005

117.09.029.2474.1022.A2 2041 I/C East Doorway 11.5 4 215 0.007 0.007

117.09.029.2474.1022.A3 2042 Make up air 2.0 4 214 0.001 <0.005

117.09.029.2474.1022.A4 2043 1st Floor Stairwell Entrance 3.0 4 215 0.002 <0.005

117.09.029.2474.1022.A5 2044 Exhaust 0.0 4 215 0.000 <0.005

117.09.029.2474.1022.FB1 2045 Field Blank 1 0.0 - - - -

117.09.029.2474.1022.FB2 2046 Field Blank 2 0.0 - - - -

*Limit Of Quantification: 0.005 f/cc

*I/C: Inside Containment

Analyst's signature: Date: 10/26/09

Analyzed by Analytical Method NIOSH 7400; Counting Rules "A"

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

Date: 10-22-09 Sample Type: Areas

Flow

Rate

Time

Off

Flow

Rate

Total

Time

Avg.

Flow

Volume Location

117.09.029.2474.1022.A1 5 12:05p 4.0 3:40p 4.0 215 4.0 860.0 I/C North-center Wall

117.09.029.2474.1022.A2 9 12:05p 4.0 3:40p 4.0 215 4.0 860.0 I/C East Doorway

117.09.029.2474.1022.A3 1 12:08p 4.0 3:42p 4.0 214 4.0 856.0 Make Up Air

117.09.029.2474.1022.A4 3 12:10p 4.0 3:45p 4.0 215 4.0 860.0 1 st Floor Stairwell Entrance

117.09.029.2474.1022.A5 8 12:15p 4.0 3:50p 4.0 215 4.0 860.0 Exhaust

117.09.029.2474.1022.FB1 NA - - - - - - - Field Blank 1

117.09.029.2474.1022.FB2 NA - - - - - - - Field Blank 2

*I/C: Inside Containment

Project #: 117-09-029 Sample Type: Areas

Building #: 2474 Sample Date: 10/23/09

Client Lab Location Fibers Flow Rate Total Time Results

Reporting

Results

Sample No. Sample No. (liters/min) (minutes) (f/cc) *(f/cc)

117.09.029.2474.1023.A1 2047 I/C North-center Wall 3.0 4 95 0.004 <0.005

117.09.029.2474.1023.A2 2048 I/C East Doorway 6.0 4 97 0.008 0.008

117.09.029.2474.1023.A3 2049 Make up air 3.5 4 95 0.005 <0.005

117.09.029.2474.1023.A4 2050 1st Floor Stairwell Entrance 0.0 4 97 0.000 <0.005

117.09.029.2474.1023.A5 2051 Exhaust 0.0 4 95 0.000 <0.005

117.09.029.2474.1023.FB1 2033 Field Blank 1 0.0 - - - -

117.09.029.2474.1023.FB2 2034 Field Blank 2 0.0 - - - -

*Limit Of Quantification: 0.005 f/cc

*I/C: Inside Containment

Analyst's signature: Date: 10/26/09

Analyzed by Analytical Method NIOSH 7400; Counting Rules "A"

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

Date: 10-23-09 Sample Type: Areas

Flow

Rate

Time

Off

Flow

Rate

Total

Time

Avg.

Flow

Volume Location

117.09.029.2474.1023.A1 5 7:05a 4.0 8:40a 4.0 95 4.0 380.0 I/C North-center Wall

117.09.029.2474.1023.A2 9 7:05a 4.0 8:42a 4.0 97 4.0 388.0 I/C East Doorway

117.09.029.2474.1023.A3 1 7:10a 4.0 8:45a 4.0 95 4.0 380.0 Make Up Air

117.09.029.2474.1023.A4 3 7:13a 4.0 8:50a 4.0 97 4.0 388.0 1 st Floor Stairwell Entrance

117.09.029.2474.1023.A5 8 7:20a 4.0 8:55a 4.0 95 4.0 380.0 Exhaust

117.09.029.2474.1023.FB1 NA - - - - - - - Field Blank 1

117.09.029.2474.1023.FB2 NA - - - - - - - Field Blank 2

*I/C: Inside Containment

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

DAILY LOG SHEET

11:30a – Arrive to job site; building is unoccupied but there are subcontract workers doing a variety of work throughout the upper levels

11:50a-I locate the area where the abatement will take place and begin to unload sampling equipment

12:30p-1:00p Lunch break

1:00p- I set and calibrate all high volume pumps for baseline sampling

1:15p-Pumps are turned on

2:30p-I check on all pumps

3:00p-There is no traffic down in the basement where air sampling is being conducted

4:15p-I turn off all pumps and collect all samples

4:30p-I leave job site

Project Manager Signature:___________________________

N C O N

Project #: 117-09-029 Date: 10-21-09 Day: 1

Building #: 2474

Material/Location: 12” x 12” Black Floor Tile / Basement Office

Point of Contact: Osvaldo Arroyo

Baselines: X Areas: Personnels: Clearances: Other:

INTERNATIONAL, INC.

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

7:00a-KEERS and I arrive to job site

-The office that’s going to be abated contains furniture items such as: a refrigerator, sofa, a few desks, chairs, cabinets, and a microwave

7:30a-KEERS continues to move out all furniture

8:15a-KEERS begins to prepare room by placing critical barriers over windows and doors

9:00a-Ruben Kato of KEERS arrives to job site to assist in the preparation process

-I begin to unload and set up all high volume pumps for ambient air sampling

10:30a-Prep continues; all pumps are calibrated, set, and ready for sampling

11:00a-Crew takes lunch break and Ruben Kato leaves job site

12:00p-Crew returns from lunch and begins to suit up; I turn on all pumps

12:30p-Crew is removing floor tile; Mr. Alberto Gonzalez of ENCON arrives to job site

1:15p-I check on all pumps

2:15p-Mr. Henry Wilson and Mr. Jesse Schaffer arrive to job site to observe work activity

2:40p-Bag out procedure commences thru decon; up the stairs and out the north entrance of bldg

3:20p-Crew begins decontamination so they can exit containment

3:40p-I begin to collect all samples

4:00p-Leave job site

KEERS Crew Members: Raymond Padilla

KEERS Supervisor: Osvaldo Arroyo

Project #: 117-09-029 Date: 10-22-09 Day: 2

Building #: 2474

Material/Location: 12” x 12” Black Floor Tile / Basement Office

Point of Contact: Osvaldo Arroyo

Baselines: Areas: X Personnels: Clearances: Other:

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

7:00a-KEERS and I arrive to job site; crew suits up; I turn on all pumps

-Crew begins by detail cleaning entire floor

8:00a-I check all pumps

8:35a-I perform a visual inspection of containment

9:00a-Visual inspection has passed and I have turned off all pumps

-I recalibrate and set three high volume pumps to start clearance sampling

9:15a-Pumps are turned and Mr. Alberto Gonzalez arrives to job site

10:25a-I check on all pumps

11:30a-I turned off all pumps and collected all samples

12:30p-Osvaldo receives a verbal of clearance so he begins to tear down

1:00p-A final visual inspection is performed and passes

1:15p-Crew leaves job site

1:30p-I collect all equipment and begin air monitoring report

3:30p-I leave job site

KEERS Crew Members: Raymond Padilla

KEERS Supervisor: Osvaldo Arroyo

Project #: 117-09-029 Date: 10-23-09 Day: 3

Building #: 2474

Material/Location: 12” x 12” Black Floor Tile / Basement Office

Point of Contact: Osvaldo Arroyo

Baselines: Areas: X Personnels: Clearances: X Other:

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

Engineering, Environmental & Construction Services

MONOMETER READING

Project Number: 117-09-029 Building Number: 2474 Date: 10-22-09

Time

Reading

Reader’s Initials

Comments

6:00am-7:00am

7:00am-8:00am

8:00am-9:00am

9:00am-10:00am

10:00am-11:00am

11:00am-12:00pm

12:00pm-1:00pm -0.042

1:00pm-2:00pm -0.035

2:00pm-3:00pm -0.054

3:00pm-4:00pm -0.048

4:00pm-5:00pm

5:00pm-6:00pm

6:00pm-7:00pm

El Paso Office: 7307 Remcon Circle, Suite 103 El Paso, Texas 79912 Fax 915-581-2049 Phone 915-833-3740

Engineering, Environmental & Construction Services

MONOMETER READING

Project Number: 117-09-029 Building Number: 2474 Date: 10-23-09

Time

Reading

Reader’s Initials

Comments

6:00am-7:00am

7:00am-8:00am -0.032

8:00am-9:00am -0.041

9:00am-10:00am -0.034

10:00am-11:00am -0.039

11:00am-12:00pm -0.035

12:00pm-1:00pm

1:00pm-2:00pm

2:00pm-3:00pm

3:00pm-4:00pm

4:00pm-5:00pm

5:00pm-6:00pm

6:00pm-7:00pm

bldg 2474 coc 102109B
bldg 2474 coc 102209A
bldg 2474 coc 102309A
bldg 2474 coc 102309C
bldg 2474 daily log 2
bldg 2474 daily log 3
bldg 2474 drwg
bldg 2474 drwg.vsd
Page-1
bldg 2474 lab rslt
bldg 2474 mono 102209
bldg 2474 mono 102309
bldg 2474 clearance letter.pdf

File details come from the government source that posted it. Updated .