SOLICITATION_AMENDMENT(M)_01_-_W911SG19B0005.pdf
PDF 1 MB Posted
- Attached to
- REPAIR/ REPLACE ELECTRICAL SYSTEM Federal contract opportunity
- Solicitation number
- W911SG19B0005
About this file
SOLICITATION AMENDMENT(M) 01 - W911SG19B0005
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SG19B0005
0011325822
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is:
1. To extend the solicitation bid closing date from 04 September 2019 at 9:00 AM to 17 September 2019 at 11:00 AM
2. Incorporate the RFI questions/ answ ers, and pictures uploaded on 29 August 2019.
3. Update the Plans and Draw ings, update SOW, and upload the specification for Rodent Dropping Remediation.
All other terms and conditions remain unchaged
1. CONTRACT ID CODE PAGE OF PAGES
1 31
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SG19B0005
X 9B. DATED (SEE ITEM 11)
01-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Aug-2019
CODE
MICC-FT BLISS W911SG
111 PERSHING RD
FT BLISS TX 79916
W911SG 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 04-Sep-2019 09:00 AM to 17-Sep-2019 11:00 AM.
The required performance has changed from This is an “Invitation for Bids”Project Title: Repair/Replace Electrical System A bid guarantee is required (see clause at FAR 52.228-1). All bid bonds must be originals;
photocopies will not be accepted. Performance and payment bonds are required (see clause at FAR 52.228-15)This is a 100% competitive set-aside for Service Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS 238210 with a small business size standard of $15 MillionThe estimated magnitude of construction for this project is between $1,000,000 and $5,000,000Applicable New Mexico Gross Receipts Tax Rate for Otero County is 6.3125% as of the date of solicitation.The awardee of this contract will be required to provide a Superintendent at all times work is being performed on the project (see clause at FAR 52.236-6). The Superintendent is considered a key position. This position SHALL NOT be subcontracted and must work directly for the prime contractor.Bid opening address: MICC-Fort Bliss, RM 220 111 Pershing Rd, Fort Bliss, TX 79916Bidders are required to provide a CD copy of their bid documents with their IFB submissionResulting contract will be Firm-Fixed-Price (FFP) to This is an “Invitation for Bids”Project Title: Repair/Replace Electrical System A bid guarantee is required (see clause at FAR 52.228-1). All bid bonds must be originals; photocopies will not be accepted. Performance and payment bonds are required (see clause at FAR 52.228-15)This is a 100% competitive set-aside for Service Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS 238210 with a small business size standard of $15 MillionThe estimated magnitude of construction for this project is between $500,000 to $1,000,000Applicable New Mexico Gross Receipts Tax Rate for Otero County is 6.3125% as of the date of solicitation.The awardee of this contract will be required to provide a Superintendent at all times work is being performed on the project (see clause at FAR 52.236-6). The Superintendent is considered a key position. This position SHALL NOT be subcontracted and must work directly for the prime contractor.Bid opening address: MICC-Fort Bliss, RM 220 111 Pershing Rd, Fort Bliss, TX 79916Bidders are required to provide a CD copy of their bid documents with their IFB submissionResulting contract will be Firm-Fixed-Price (FFP).
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTIONS TO BIDDERS
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
1. Description of the Project:
The Directorate of Public Works (DPW) White Sands Missile Range (WSMR), has a new requirement that consists of replacing electrical panels, switchboard and switchgear for building 25900 at White Sands Missile Range, NM.
2. Instructions to Bidders:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB)
W911SG-19-B-0005 REPAIR/REPLACE ELECTRICAL SYSTEM, at 11:00 AM MST 17 September 2019 at Ft. Bliss TX Bldg 111 Room 220.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. This solicitation is set-aside 100% for Service Disabled Veteran Owned Small Businesses (SDVOSB).
3. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
3.1. A pre-bid conference will be conducted on 14 August 2019 at 1:00 P.M. MST for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at the parking lot of BLDG 102 White Sands Missile Range, NM. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.
3.2. The conference/site visit is limited to a maximum of two (2) attendees per company. Contractor representatives should be prepared to furnish identification if requested.
Email the following information for all attendees to Christopher Herrera at christopher.herrera1.civ@mail.mil
Company Name POC Name and position title Telephone Number
Individual or group questions will not be answered during the site visit. Potential bidders may submit written questions in accordance with number 4 (below) of this instructions to bidders section.
3.3. Potential bidders are not allowed to take pictures at the site visit. If pictures are required, the bidder may ask the designated Government representative to take any pictures requested. Pictures will subsequently be cleared by the WSMR Security Office and then incorporated into the solicitation as an amendment.
3.4. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
3.5. A record of the conference shall be made and furnished to all prospective bidders via posting at http://www.fbo.gov.
4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
4.1. Submit all questions in the format shown below by email to the contracting office at the address shown below. Do NOT contact DPW directly. Doing so will only delay your answer. All questions must come through the Contracting Office.
Subject Line: Reference No. SOLICITATION W911SG-19-B-0005 Email: christopher.herrera1.civ@mail.mil
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Address:_____________________________________________________________________________
Phone Number: _____________________________ Fax Number:______________________________
Email address: ________________________________________________________________________
Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
4.1. Any explanation desired by bidder regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
4.2. All questions and requests for information (RFI) must be received NOT LATER THAN 21 August 2019 at 1:00 P.M. MST. An amendment will then be issued with all questions and answers. BIDDERS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS. **After the due date no additional RFI’s will be answered**
4.3. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment.
However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on FBO at http://www.fbo.gov
4.4. Receipt by the bidder must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
4.5. All technical data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.
4.5.1. Amendments, if/when issued will be posted to https://www.fbo.gov/ for electronic downloading.
This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
5. SUBMISSION OF BIDS: ELECTRONIC SUBMISSION OF BIDS, TO INCLUDE E-MAIL AND
FACSIMILE TRANSMISSIONS, IS NOT AUTHORIZED.
5.1. The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf as indicated below. Bids shall not be addressed to any specific person. Any bids hand-delivered between 10:00 AM and 11:00 AM MST on the due date shall only be delivered to the bid opening room at:
MICC-Fort Bliss, Room 220 111 Pershing Rd Fort Bliss, TX 79916
*Note: Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer shall declare the bid “late” in accordance with FAR 14.304.
All bids must be clearly identified with the bidder’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Invitation for Bid No: W911SG-19-B-0005 Due Date of Bids: 17 September 2019 Time by which Bids are due: 11:00 A.M. (Mountain Standard Time) Title of Project: REPAIR/REPLACE ELECTRICAL SYSTEM
Bidders submission shall consist of one (1) volume, physically separated with detachable parts, and individually title (to include one CD/DVD submitted). Please note no thumb drives will be accepted.
TAB TITLE ORIGINAL
(HARD COPY)
CD/DVD
COPIES
A COVER SHEET 1 1
B SF 1442/
AMENDMENTS
1 1
C TOTAL CONTRACT
PRICE
1 1
D LETTER FROM
BONDING COMPANY
1 1
E BID BOND
GUARANTEE
1 1
F SUBCONTRACT LIST 1 1
G WORK EXPERIENCE 1 1
H REPS & CERTS 1 1
Bids delivered before bid opening must be delivered only by mail, including, Federal Express or United Parcel Service to the address as indicated below. The date and time of delivery established by these carriers is not the official time of receipt by the Government. Bidders are responsible for allowing sufficient time for the bid to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of bids. Bids sent by Federal Express and United Parcel Service are required to be sent to:
MICC – Fort Bliss Attention: Christopher Herrera Contract Specialist
W911SG-19-B-0005
Bldg 111 Pershing Road Fort Bliss, TX 79916
*Note the mailing address differs from the bid opening location.
Bidders must allow sufficient time to complete security screening to gain admittance to Fort Bliss, TX. The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf. Bidders are responsible for ensuring bids are submitted so as to reach the location designated for receipt of bids.
6. PUBLIC BID OPENING:
The bid opening will occur at the time and date specified in Block 13 of the SF1442:
MICC-Fort Bliss, Room 220 111 Pershing Rd Fort Bliss, TX 79916
7. WAGE DETERMINATION:
Construction Wage Rates are applicable to this project are __NM20190025__ as shown in Section 00800.
8. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS:
This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
9. CLAUSES:
Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements there to are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
10. SYSTEM FOR AWARD MANAGEMENT (SAM):
Bidder must be registered in the database IAW FAR 52.204-7 in order to be awarded a contract and have the applicable NAICS code listed in FAR 52.219-1(c), Small Business Program Representations (Alternate I), Representations.
11. DISPOSITION OF UNSUCCESSFUL BIDS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
12. BID CONTENT/OFFERORS QUALIFICATIONS: (See section 00800 for Contracting Officer Determination of Responsibility)
IFB DOCUMENTS. Contract shall be awarded to the responsive/responsible bidder considering only price. Before award, to be determined responsive, a prospective contractor must furnish the following information with their bid:
a. TAB A: Cover Sheet. Coversheet shall be on company letterhead and must contain your DUNS number, CAGE code, Tax ID, and authorized representative(s) who can obligate your company contractually, sign the bid, and sign, other contract actions; include telephone number with area code and complete email address for each authorized representative. Failure to provide all of the above requirements shall render your bid nonresponsive.
b. TAB B: Signed and completed SF 1442 along with any amendments. The SF1442 shall be submitted fully completed. The Contractor shall acknowledge any amendments to the IFB in accordance with the instructions on the SF1442. All bidders are cautioned to complete blocks 20a-20c with an original signature in block 20b. Failure to provide all of the above requirements shall render your bid nonresponsive.
c. TAB C: CLIN Price and Total Contract Amount . The Bidders shall provide page 3 of the solicitation pricing each CLIN individually and include the OVERALL contract price.
d. TAB D: Letter from Bonding Company. Letter must indicate the bidder’s ability to obtain performance and payment bonds in the amount of their bid. Failure to provide this letter shall render your bid as nonresponsive.
e. TAB E: Bid Bond Guarantee. Per FAR 52.228-1, failure to provide a bid bond guarantee per FAR 52.228-1 shall render your bid nonresponsive.
f. TAB F: Subcontract List. Bidders shall submit a list of proposed subcontractors as an attachment to their bid. If bidder does not intend on utilizing subcontractors (self-perform), Bidder shall state so in their bid.
Failure to provide this listing or statement will render the bid nonresponsive and eliminate the offer from further consideration for award.
g. TAB G: Work Experience. The prime contractor shall demonstrate that it possesses general construction contract management by providing at least two examples of relevant work experience in an awarded contract similar to the requirements stated in this solicitation. Documentation shall be submitted with the bid and include the contract number, the date of contract award, the customer's name and contact information, the awarded dollar value, a description of all work elements included in the contract, the number and type of specialty trades needed to complete the contract, and the period of time allocated for completion of the work. The Government will accept work experience from Federal, State, and institutional and commercial contracts. Failure to provide this documentation will render the bid/offer non-responsive and no further consideration will be given to that bidder for award of this contract.
h. TAB H: REPRESENTATIONS, CERTIFICATIONS. The bidder shall ensure that their business has completed an online Representations and Certifications at the System and Awards Management (SAM) website, which may be found at https://www.sam.gov/portal/public/SAM//. It is the bidder’s responsibility to ensure that the information provided in each representation and certification is completed truthfully and completely. A bidder’s failure to complete the online representations and certifications prior to the close of the Solicitation (to include listing of the applicable NAICS code and applicable size standards) will result in their bid being deemed non-responsive and eliminated from further consideration. Bidders shall submit the representations and certifications listed in Section 00600 or provide a printed version of the documents from their corporate SAM profile. Bidder must be registered in the database IAW FAR 52.204-7 in order to be awarded a contract and have the applicable NAICS code listed in FAR 52.219-1(c), Small Business Program Representations (Alternate I), Representations.
SECTION 00700 - CONTRACT CLAUSES
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
ARL047479P- PLANS AND DRAWINGS - 28 AUGUST 2019 -Final Design Upgrade
(End of clause)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
RFI QUESTIONS
RFI QUESTIONS/ ANSWERS TO W911SG19B0005
3. Will pictures of panels be provided for those located in restricted areas that the site visit didn’t cover?
Answer: Yes, pictures of all panels and fuse disconnects that are to be replaced have been sent to MICC to distribute.
4. Will night and weekend work be permitted with escorts?
Answer: Night work will not be allowed. Weekend work must be coordinated through the COR in advance, will be by exception and will only be approved as needed when the work cannot be accomplished during the week.
5. What is the process for gaining access to restricted areas over the course of the project?
Answer: Once contractor/subcontractor personnel receive approval from WSMR Garrison Security to enter the installation, the building user will perform additional screening and place personnel on an approved access list. The building user will provide escort(s) for them when working in and around Building 25900 at no cost to the Contractor. They will be allowed to work only in a few areas at one time and no more than two escorts will be available at any one time. Personnel will not be allowed into the work area without being on the building’s approved access list. Deliveries of materials do not have to meet this requirement.
6. Will we be able to access the site from the Oro Grande gate?
Answer: Yes, the contractor awarded the contract will be able to access the site from the Oro Grande gate, but contractor/subcontractor personnel must first go through WSMR’s Garrison Security process to enter the installation.
8. Will there be times during the project that will have no access to the facility? If so, what kind of time frames can be expected?
Answer: The contractor/subcontractors might not have access to the facility and/or government escorts may not be available to support during Federal holidays. The contractor must stay current on road block information affecting access to the facility by calling Range Control. The contractor is responsible for accurately documenting on the project’s daily reports installation/ building access that is directly impacted by road blocks.
9. How much notice does the user require for outages?
Answer: The contractor shall coordinate with the COR to inform the building user about outages at least two weeks in advance, and will include in the information provided the areas that are to be affected along with the panels and room numbers that will be worked on.
19. If panels A1 and A2 are in room 134 as shown on this drawing, then they are in the wrong corner of room 134 shown on drawing 3. Can this be clarified?
Answer: The location of panels A1 and A2 is in the southeast corner of Room 134, as shown in Drawing Number WS-25900-2019-EP-3 in Sheet 3 of the updated Drawings. Also, see photos provided.
26. Note 2) at top right of this drawing “EACH PANEL SHALL HAVE THE PROPER MARKINGS ………” General signs and warning labels are standard for all gear. Are you asking for an Arc Flash and Fault Current Study to be provided by the equipment manufacturer? Or are you just asking for PROPER MARKINGS?
Answer: An Arc Flash and Fault Current Study is not required. The contractor shall install markings and safety signs as stated in NFPA 79 Section 16.2. A label in the panel shall list the circuit designations. This information is provided in the General Notes on Sheets 18 and 19 of the updated Drawings.
27. Need Rodent Remediation Specification as required on EP22 Answer: Please refer to the attachment titled “Specification_Rodent Droppings Remediation” for remediation requirements.
The RFI questions below have been answered but have been separated from the rest due to the change in scope of the project. They are no longer applicable to the updated scope of the project.
1. Scope states the existing MDP cabinet will be re-used and retrofitted with new bussing and gear. This cabinet will lose its UL label, please advise.
Answer: Replacement of the switchboard (MDP), switchgear and feeder conductors is no longer in the scope of this project. See updated SOW and Drawings.
2. Is it acceptable to remove existing MDP cabinet to provide and install a new MDP?
Answer: See answer to Question 1.
7. If underground feeder pipes are damaged and deemed unusable, will a change order be executed to Answer: Replacement of the feeder conductors is no longer in the scope of this project. See updated
Drawings.
10. Please provide a switchboard schedule for SG-2.
Answer: Replacement of the switchboard (MDP or SWB-1 as identified in the previous version of the project Drawings) and the switchgear (SG-2 as identified in the previous version of project Drawings) are no longer in the scope of this project. See updated Drawings.
Drawing number WS-25900-2019-G-G1-01 (1 of 26) Building 25900 Cover Sheet/Index Sheet:
The last drawing WS-ML-4/18.4-26 Floor Plan-Power & Special Systems (Reference As built) is not included in the issued drawings.
11. Will the government-issue this drawing?
Answer: Replacement of the switchboard, switchgear and feeder conductors is no longer in the scope of this project. Drawing WS-ML-4/18.4-26 has been removed from the Sheet Index table in Sheet 1 of Drawings. See updated Drawings.
Drawing number WS-25900-2019-EP-4 (4 of 26) Building 25900 Room 134 Switchgear and Switchboard
12. What is the identity of the switchgear/switchboard that is on this sheet? Is it SWB-1 shown on drawing 21 note 4? Or is it SWB-1 shown on drawing 21 note 5?
Answer: Replacement of the switchboard, switchgear and feeder conductors is no longer in the scope of this project. The as-built drawings provided in Sheets 4, 5 and 6 of the previous version of the project Drawings have been removed. See updated Drawings.
13. The “triangle symbols” with numbers on upper corners usually indicate revisions to drawings. These symbols do not match with any description of work shown on this drawing. Will the government-issue tagged sheet notes, or revision notes to match these symbols?
Answer: See answer to Question 12.
14. We can see that this drawing is marked as an as-built – SHOWN FOR REFERENCE ONLY. Can the government show NEW WORK in BOLD Lines, and existing work in dimmed lines to clarify the work?
Answer: See answer to Question 12.
Drawing number WS-25900-2019-EP-5 (5 of 26) Building 25900 POWER RISER DIAGRAM
15. We can see that this drawing is marked as an as-built – SHOWN FOR REFERENCE ONLY. Can the government show NEW WORK in BOLD Lines, and existing work in dimmed lines to clarify the work?
Answer: Replacement of the switchboard, switchgear and feeder conductors is no longer in the scope of this project. The as-built drawings provided in Sheets 4, 5 and 6 of the previous version of the project Drawings have been removed. See updated Drawings.
16. The “triangle symbols” with numbers on upper corners usually indicate revisions to drawings. These symbols do not match with any description of work shown on this drawing. Will the government provide revision notes to match these symbols?
Answer: See answer to Question 15.
17. Keyed notes on this drawing indicate this is NEW WORK. Certain Room numbers and layouts do not match Drawing 3 for the general building 25900 floor plan. Specifically, switchgear 121 layout on this sheet 5 does not match layout plan on sheet 3. We can see normal “match-line” symbols, or “section symbols”, but these do not have any details associated with the symbols. Can these be clarified?
Answer: See answer to Question 15.
18. The SUBSTATION labeled and located on the left side of this sheet does not match the building footprint shown on drawing 3. Can you clarify the location of this substation?
Answer: See answer to Question 15.
Drawing number WS-25900-2019-EP-21 (21 of 26) Building 25900 Transformer and Switchgear Replacement
20. Keyed note 1 says to disconnect & reinstall smart meter shark 200 ……. Is this on the primary side of transformer or secondary side?
Answer: Disconnection and reinstallation of the smart meter shark 200 is no longer in the scope of this project. See updated Drawings.
21. Keyed note 1 says new conductors are run from secondary to new switchgear. No conductors are shown on this drawing. Is this conduit and wire or bus duct?
Answer: Replacement of the switchboard, switchgear and feeder conductors is no longer in the scope of this project. The drawing provided in Sheet 21 of the previous version of the project Drawings has been removed. See updated Drawings.
22. Keyed note 4 & 5 in room switchgear 134 have 2 different switchgear with the same designation (SWB-1). What will be the label for the new switchgear with keyed note 5? It is SG-2 and is actually in key note 4. Will you provide a Panel Schedule for the new switchgear with Keyed note 5?
Answer: Replacement of the switchboard, switchgear and feeder conductors is no longer in the scope of this project. The drawing provided in Sheet 21 of the previous version of the project Drawings has been removed. See updated Drawings.
23. Keyed note 6 existing doors. Will you issue a door hardware specification for this item?
Answer: The removal, painting and installation of panic bars with hardware to the existing doors in Room 134 is no longer in the scope of this project. The drawing provided in Sheet 21 of the previous version of the project Drawings has been removed. See updated Drawings.
Drawing number WS-25900-2019-EP-23 (23 of 26) Building 25900 GENERAL NOTES
24. The statement says the existing conductors shall not be removed but transferred to the new panel……(This directly contradicts statement 4 on drawing 24 that says to “install new wire”). Which statement of work is correct?
Answer: Replacement of conductors is no longer in the scope of this project. The existing conductors, including feeders, shall be transferred to the new panels. See updated Drawings.
Drawing number WS-25900-2019-EP-24 (24 of 26) Building 25900 GENERAL NOTES
25. Note 4 states the contractor shall install new wire ……..Which statement of work is correct? Drawing 23 or drawing 24?
Answer: See answer to Question 24.
STATEMENT OF WORK
SCOPE OF WORK
ARL047479P AND REPLACE ELECTRICAL PANELS for Building 25900
White Sands Missile Range, NM August 28, 2019
Information contained in this document regarding commercial products or firms may not be used for advertising or promotional purposes and is not an endorsement of any product or firm by the Directorate of Public Works, White Sands Missile Range or the U.S. Army.
Part 1- Project Description and Location
1.1 General Description of Work.
All work shall comply with State, local and Federal laws and regulations, industry and construction codes and standards, manufacturer’s specifications and recommendations, and all contract special provisions, terms and conditions. The Contractor shall be responsible for obtaining all required licenses and permits to perform construction work on a Federal installation, and be properly bonded and insured in accordance with Federal Acquisition Regulation (FAR) requirements. The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. The Contractor shall furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
Evaluate and correct according to NEC 2017 Code, discovered electrical distribution panels within the electrical interior of B-25900 known as AMRAD (Air Munitions Requirements & Development Committee). The distribution panels have exceeded their life expectancy and are not safe to operate and protect the tenants and existing equipment at building 25900 from Arc Flash and electrocution.
1.1.1 RODENT DROPPINGS:
1.1.1.1 The terminal compartment of the existing 1500 kVA pad, mechanical room, ceiling tiles, and other areas throughout 25900 is contaminated with rodent droppings. Rodents on White Sands Missile Range may carry the Hantavirus. Hantavirus Survey No. 18-RF-666-97, conducted by U.S. Army Center for Health Promotion and Preventive Medicine on White Sands Missile Range 4-8 April 1997, identified the rodent species, Peromyscus Boylii (common name: Brush Mouse) as a carrier of the Hantavirus.
The Hantavirus may be transmitted to humans when exposed to infected rodents. Exposures may include: breathing in the virus. This may happen when rodent urine and droppings containing Hantavirus are stirred up into the air. Touching eyes, nose or mouth after touching rodent droppings, urine, or nesting materials that contain the virus. A bite from an infected rodent.
Persons infected with the Hantavirus may develop Hantavirus Pulmonary Syndrome (HPS). HPS is a severe, sometimes fatal, respiratory disease. Anyone who comes into contact with rodents or rodent contaminated materials that carry Hantavirus, without proper protection, are at risk of developing HPS.
HPS is not spread from person to person.
Based on the rodent droppings remediation specification (provided as a separate attachment), provide rodent dropping remediation work including the handling and control of rodent contaminated materials and the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with rodent dropping products. The work also includes the disposal of any rodent droppings and contaminated materials generated by the work.
The rodent dropping removal work includes the disinfection or sanitizing of surfaces contaminated by rodent droppings and contaminated materials. Provide containment and engineering control techniques as outlined in the rodent droppings specification. All rodent dropping and contaminated materials removal work shall be supervised by a biohazard remediation supervisor as specified in the specification.
1.1.1.2 See the rodent droppings remediation specification for all requirements. Specification to be provided as a separate attachment.
1.1.1.3 Contractor shall ensure that the Government provides the rodent droppings specification before submitting a cost proposal.
1.2 Project Location.
Work is located at 25900 at AMRAD, White Sands Missile Range (WSMR), and New Mexico in Otero.
1.3 Contract Discrepancies.
The Contractor shall become thoroughly familiar with the existing conditions, analyze the components of the project, take the necessary equipment, and make any necessary calculations to achieve the project requested. The Contractor shall notify the Contracting Officer Representative (COR) immediately of any errors, omissions, and other discrepancies in contract documents for all work covered in this Scope of Work (SOW).
1.4 Period of Performance (POP).
All work shall be completed according to the awarded contract period of performance of no later than 120 calendar days after the notice to proceed is issued by the Contracting Officer (KO). The POP includes time required to process any coordination with any Government office or the COR, for example traffic control plans, dig permit coordination, utility outage requests, submittals in accordance with (IAW) Section 8.3, etc.
1.5 Pre-Construction Meeting.
The Contractor shall attend a pre-construction meeting held by the government prior to construction. Construction shall NOT begin until this meeting is held. This meeting serves to answer any questions from the Contractor and to discuss building issues such as storage, security, access, working hours, etc. The Contractor shall take minutes of the meetings and submit the minutes to the COR via the Contract Daily Report (see Section 5.2) within five (5) days.
1.6 Progress Meetings.
The Contractor’s project manager and superintendent shall attend any progress meetings held by the government on a scheduled or unscheduled basis (with 48 hour notice), or on dates determined by the government. This meeting is for the Contractor to discuss their current progress, to discuss schedule, and to discuss and resolve any other project related issues. The Contractor shall take minutes of the meetings and submit the minutes to the COR via the Contract Daily Report (see Section 5.2) within five
(5) days.
1.7 Temporary Utilities.
1.7.1 Water Service. The Contractor may use water from the Government's existing water system. When connecting to the Government’s water system, including attaching water hoses to spigots, the Contractor must install a back flow prevention device that is approved by WSMR Water Plant manager, 575-678-1917.
1.7.2 Electric Power Service. The Contractor may use electric power from the Government’s existing electrical system.
1.8 Project sign.
The Contractor shall install a 4’ x 8’ project sign at the work site. The sign will contain information such as project name, contractor information, etc. A template will be provided by the COR. The sign shall be placed where it can safely be viewed by the general public. The sign shall remain in place for the duration of the construction until project acceptance.
Part 2 – Installation Access and Security
2.1 Installation Access.
The Contractor’s and all associated sub-contractor’s employees shall provide all information required (to the COR or as required by the WSMR Visitor Control Program) for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce shall comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. Contractors shall comply with the requirements of WSMR Visitor Control Program (May 2017).. The Government is not responsible for work delays or additional costs associated with and / or Contractor’s failure to obtain clearances for their employees.
NOTE: Employee Training as outlined in Section 7.1 MUST BE COMPLETED PRIOR TO REQUESTING RANGE ACCESS. Proof of training must be completed for both Contractor and subcontractor workers.
2.2 Contractor’s Responsibilities.
The Contractor shall ensure that all employees carry their Installation access authorization with them during working hours and show them upon request. The Government will periodically verify passes from the contractor employees with their personal identification. The Contractor shall also ensure that all passes are current, and are originals and not copies. If an employee is terminated the Contractor shall ensure that Installation access passes, badges, or other access credentials are turned in to the COR within 1 (one) working day.
2.3 Removal of Personnel.
The Government has the right to remove any contractor employee at any time during the duration of the contract if that employee fails to meet the Installation Security Requirements. In such case, the Contractor shall ensure that Installation access passes, badges, or other access credentials are turned in to the COR immediately. The Contractor shall submit the name of a replacement within 5 (five) working days of the removal to the COR.
2.4 Photography.
Under no circumstances shall the Contractor or any of their subcontractors take photographs of any type while on the installation. Failure to comply with this requirement will result in employee being barred from entering the installation. The Contractor can request, at least 48 hours in advance, that photographs be taken by the COR. These photographs will be provided to the Contractor upon security review and approval for release, which may take up to two weeks.
2.5 Working Hours.
White Sands Missile Range operates on a compressed work schedule with an off day every other Friday (RDO) and observes Federal Holidays. Normal working hours for the installation are from 07:00 am to 4:30 pm. The KO may authorize the Contractor to perform work outside of normal working hours and/or working days. If the Contractor desires to work during periods other than the days and hours listed above, a written request must be made to the KO within 4 (four) calendar days of their intention.
2.6 Entry Restrictions and Roadblocks.
The Contractor’s and all associated sub-contractor’s employees may be required to work in areas subject to entry restrictions, evacuations, and roadblocks. Roadblocks on public highways are normally set for a duration of at least one (1) hour. Internal roadblocks (on non-public WSMR roads) are normally set for a duration of at least two (2) Hours. However, on occasion the duration may be as long as all day. The Contractor is responsible for scheduling operations to avoid unnecessary delays and missed services.
Range and roadblock status may be obtained by calling 575-678-1178 or 575-678-2222. Roadblocks time and duration are subject to change without prior notification.
Part 3 – Safety
3.1 Safety Compliance.
Army construction contracts fall within the purview of the US Army Corps of Engineers Safety and Health Requirements Manual, Engineer Manual (EM) 385-1-1, and Occupational Safety and Health Administration (OSHA) Title 29 Part 1910 and 1926. The version in effect at time of contract award will be used. OSHA 29 CFR 1910 Safety and Health Regulations as well as 29 CFR 1926 Safety and Health Regulations for Construction are available online at:
3.1.1 http://www.osha.gov/
3.1.2 EM-385-1-1 is available online at:
http://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/
3.2 Coordination with Sub-Contractors.
The Contractor is the “controlling employer" and is responsible for all work site safety and health conditions including those of the subcontractors. The Contractor shall be responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one task from interfering with or creating hazardous working conditions for other tasks, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
3.3 Site Specific Safety Plan.
Construction contracts shall include a site and project specific safety plan. See Section 8.3 for submittal requirements. EM 385-1-1 refers to a safety plan as an Accident Prevention Plan (APP). The safety plan will be tailored to the project, based on the size and complexity of the construction to be accomplished and shall include a fall protection and prevention program. A typical safety plan will address such issues as, but will not be limited to, the following:
3.3.1 The company’s safety and health policy.
3.3.2 Company safety inspections of the job site.
3.3.3 Use of personnel protective equipment (PPE).
3.3.4 Safety rules and penalties associated with not following the rules.
3.3.5 Safety training and frequency (identifying hazards, explaining precautions and proper use of equipment/machinery, and the PPE required for the job including how to use and maintain PPE).
3.3.6 The steps to be followed to report unsafe working conditions and practices.
3.3.7 Special hazards.
3.3.8 Hazardous materials.
3.3.9 Confined spaces, i.e. entry procedures and ventilation requirements, etc.
3.3.10 Lockout tag procedures.
3.3.11 Instruction concerning safe operations and appropriate emergency action in the event of accidental exposure.
3.3.12 Emergency procedures.
3.3.13 Identifying personnel on site who have had first aid training.
3.3.14 Identify where communication devices (such as phones, radios or other approved communication devices) are located with appropriate phone numbers posted.
3.3.15 Post how to exit the work area in an expeditious and safe manner.
3.3.16 The plan will identify the person with lead responsibility for safety, where protective equipment may be obtained and the procedures for reporting a safety hazard.
The person identified as the lead responsible for Safety may also perform Contractor Quality Control (CQC) upon approval by the KO (see Section 5.1).
Approval of the Safety Plan does not relieve the Contractor of complying will all applicable safety requirements.
3.4 Internal Job Site Safety Inspections.
Frequent and regular contractor internal job site inspections shall focus on identifying and removing hazards. The Contractor’s Safety Plan shall explain the disciplinary process that will be followed when the contractor job inspections find violations to the safety rules. The disciplinary process shall be included in the employee’s training and reviewed during regular safety briefings. The Government will review the Contractor’s Safety Plan for adequacy, completeness and compliance with OSHA and EM 385-1-1 requirements. The Contractor shall review and amend the safety plan, as necessary, throughout the life of the contract. Amended safety plans shall be submitted to the COR for approval. The Contractor shall incorporate unusual or high- hazard activities not identified in the original safety plan as they are discovered.
3.5 Hazard Analysis.
Before beginning each work activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform the work, the contractor(s) performing that work activity shall prepare an Activity Hazard Analysis (AHA) (sometimes called a job hazard analysis). See section 8.3 for deliverable requirements. Approval of the Activity Hazard Analysis does not relieve the contractor of complying will all applicable safety
3.6 Accident Reporting Requirements.
The Contractor shall immediately report all accidents or injuries to the COR or his/her designee. If COR or Project Representative is not available, report accidents or injuries to the Garrison Safety manager (575-678-3221). Forward a written report through the COR using contractor’s format or similar IAW DAPAM 385-40 to the Installation Safety Office (ISO) within seven (7) calendar days of occurrence.
Damage to Army property. This includes Government furnished material, property, or equipment provided to a contractor. Contractor must complete DA Form 285 or 285-AB-R (available at http://armypubs.army.mil/), when damage to Army property is equal to or greater than $5,000.00. If Contractor has an issued Common Access Card (CAC), Contractor is required to complete the report through REPORT IT, the Army's online accident reporting system (https://safety.army.mil/). If contractor has not been issued a CAC, the forms identified in DA PAM 385-40 must be utilized and provided to the ISO Director or designated representative within seven (7) calendar days of occurrence.
The COR shall immediately notify the ISO of a contractor accident or injury and ensure a written accident report is sent to the ISO within seven (7) calendar days of occurrence.
Contractors shall report to the local OSHA office accidents and injuries in accordance with OSHA reporting requirements (https://www.osha.gov/oshdir/nm.html).
3.7 Safety Meetings.
The Contractor shall conduct and document meetings as required by EM 385-1-1. Attach minutes showing contract title, signatures of attendees and a list of topics discussed to the contractor's daily report (see Section 5.2).
3.8 Display of Safety Information.
The contractor shall erect a safety and occupational health (SOH) bulletin board at the job site at least one calendar day prior to commencement of work. Include and maintain information on safety bulletin board as required by EM 385-1-1, section 01.A.07 ”SOH Bulletin Board”.
Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the COR, that is accessible and includes all mandatory information for employee and visitor review, shall be deemed as meeting the requirement for a bulletin board.
3.9 Work in Confined Spaces.
The Contractor shall comply with the requirements in Section 34 of USACE EM 385-1-1, OSHA 29 CFR 1910.146, and OSHA 29 CFR 1926.21(b)(6). Any potential for a hazard in the confined space requires a permit system to be used. WSMR Fire Department issues permits for confined space entry. Please call 575-678-0470 or 678-4187 to obtain a permit. Permits shall be requested no later than two (2) working days in advance of the work to be performed. The Contractor shall coordinate with the COR to submit the permit request.
3.10 Safety Data Sheets for Hazardous Materials.
The Contractor shall submit a List of Hazardous Materials (LHM) and Safety Data Sheets (SDS) IAW requirements of FAR 52.223-3, Hazardous Material Identification and Material Safety Data. See Section8.3 for submittal requirements.
3.11 Radiation Permits and…