ARMOR OSUT 4 Specific Questions

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Armor OSUT 4 Questions

1. 10.e on the Solicitation references a spreadsheet with a separate cost breakdown to be submitted. Do you have a template for this breakdown we should use? If not, please provide direction on the cost breakdown you are seeking.

Answer: Proposal breakdown Worksheet provided with this amendment.

2. Can one QC handle multiple roles?

Answer: Answer: One person can fulfill the duties of the QC/Superintendent/SSHO for one range at a time.

3. Can we have only one SSO?

Answer: One person can fulfill the duties of the QC/Superintendent/SSHO for one range at a time.

4. Please allow an additional week for RFI’s.

Answer: This is a time sensitive requirement so an additional week will not be granted.

5. Please extend the bid due date to 8/13/2019.

Answer: This is a time sensitive requirement so no extensions are being considered.

6. Could I get the attendees list - for your site visit on 07/10/19?

Site visit attendee list provided with this amendment.

7. Oscar 2 and 3 are listed under OSUT #4 but are also listed under OSUT #3. Please clarify which is correct.

Answer: Oscar 2 and 3 are to be under OSUT #3.

8. For Oscar 13, 10, 8, 4, 1 – will we be furnished with civil plans for grading elevations, limits of disturbance, soil erosion and construction details? None were provided with the solicitation.

Answer: Contractor required to provide design for grading elevations, limits of disturbance, soil erosion and construction details.

9. Which Oscars pertain to firing point/CTA 260’ and hydro-seed, dirt, blocks, metal targets, PVC sleeves and timbers?

Answer: Oscar 13, 10, 8, 4, 1 have the firing point/CTA 260’ and hydro-seed, dirt, blocks, metal targets, PVC sleeves and timbers

10. Will we be furnished with details on pad (materials, location and elevations) for Firing Point ½ CTA – single?

Answer: No. The pad, location and elevation points shall be designed by PE.

11. Is the timber fastened to concrete blocks in any way? If so, with what material?

Answer: No, the timber is sacrificial and is replaced every so often. There is no hardware that fastens it down to the block.

12. The scopes of work seem to be redundant of another OSUT project. Please clarify what projects are specific to OSUT #4.

Answer: The Armor OSUT #4 project consists of Oscar ranges 1, 4, 8, 10 & 13. Each of these ranges will have a Firing Point CTA 260ft in length. Each of these ranges will include dirt and grading work from firing line to target, concrete blocks, target brackets, timbers, hydro-seed and PVC sleeves at the 10M zero target line.

13. OSUT 4 Has multiple 260 foot firing point CTA’s. Are the CTA’s going to be centered on the ranges or off to one side?

Answer: The new CTA’s will cover the existing firing point locations.

14. OSUT 4 Are 10’ x10’ concrete pads required under the 260’ CTA?

Answer: See drawings for the 260’ CTA. The 10’x10’ pads are for the single CTA’s on Armor OSUT#3.

15. OSUT 4 Can the target brackets be individual brackets or are they to be a continuous run bracket?

Answer: Yes, however you will find that the strap of metal between each bracket will provide an ease for those installing. The strap provides a rigidness and ability to install quickly and most importantly…level.