Project: AR OPSUT – Add eight receptacles in Simpson Range
26 Electrical
i) Electrical Guidelines (New Work):
The electrical new work shall comply with the design criteria specified in Technical Instructions TI 800- 01 Design Criteria, TI 800-03 Technical Requirements for Design-Build, TI 811-16 Lighting Design;
Technical Manual TM 5-811-1 Electric Power Supply and Distribution, TM 5-811-2 Electrical Design - Interior Electrical System, UFC 3-501-01, UFC 3-550-03FA, NFPA 70, IEEE C2, ANSI/ICEA S-94-649, TIA/EIA 568-B, and National Electrical Codes (NEC) and all referenced documents.
1. Existing electrical power system in the Simpson Range shall remain in place. Contractor must verify and/or determine that the existing power distribution system has sufficient current capacity for the additional loads. Upgrade the existing power distribution system if needed.
Provide and install new panelboard if required by the newly added receptacle loads.
2. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 1-2 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.
3. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 3-4 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.
4. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 5-6 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.
5. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 7-8 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.
6. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 9-10 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.
7. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 11-12 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.
8. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 13-14 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.
9. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 15-16 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.