Statement_of_Work_-_Simpson_Electrical.pdf

PDF 79 KB Posted

Attached to
Armor OSUT 3 Federal contract opportunity
Solicitation number
W911SF-19-R-0021
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

About this file

SOW Simpson Elec

View the file

Other files for this federal contract opportunity

Other files attached to Armor OSUT 3, newest first.
File Type Posted
W911SF19R00210004.pdf PDF
ARMOR_OSUT_1_-_5_Pre_Award_Addendum_1.pdf PDF
ARMOR_OSUT_1_-_5_General_Questions.pdf PDF
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
44026_Steindam_Oscar_11_Nad_83_Grading_Plan_Model_Amended_12_July_2019.pdf PDF
W911SF19R00210003.pdf PDF
Armor_OSUT_3_Questions.pdf PDF
Blank_Bid_Breakdown_Form.xlsx XLSX spreadsheet
44026_Pulaski_Oscar_9_Nad_83_Site_Plan_Model_(1).pdf PDF
44026_Pulaski_Oscar_9_Nad_83_Grading_Plan_Model_(1).pdf PDF
44026_Steindam_Oscar_11_Nad_83_Site_Plan_Model_(1).pdf PDF
44026_Baum_Oscar_12_Nad_83_Site_Plan_Model_(1).pdf PDF
44026_Steindam_Oscar_11_Nad_83_Grading_Plan_Model_(1).pdf PDF
W911SF-19-R-0021-0001,_ARMOR_OSUT_3,_wdr,_1Jul19.pdf PDF
44026_Fowler_Oscar_7_Nad_83_Grading_Plan_Model_(1).pdf PDF
44026_Fowler_Oscar_7_Nad_83_Site_Plan_Model_(1).pdf PDF
W911SF-19-R-0021-0002,_ARMOR_OSUT_3,_wdr,_5Jul19.pdf PDF
44026_McBrayer_Oscar_6_Nad_83_Site_Plan_Model_(1).pdf PDF
44026_Baum_Oscar_12_Nad_83_Grading_Plan_Model_(1).pdf PDF
0001.zip ZIP file
Statement_of_Work_-_OSCAR_06.pdf PDF
Statement_of_Work_-_Firing_Point_CTA_-_Single.pdf PDF
Malone_07_OSUT.pdf PDF
Statement_of_Work_-_OSCAR_11.pdf PDF
Malone_12_OSUT.pdf PDF
Malone_11_OSUT.pdf PDF
Statement_of_Work_-_Oscar_3_Electrical.pdf PDF
Statement_of_Work_-_Oscar_12_Electricial.pdf PDF
SOW_Cover_Page_-_Oscar_11,_12,_9,_7,_6.pdf PDF
Malone_09_OSUT.pdf PDF
AR_OSUT_3_WD_GA20190118_dtd_12Apr19,_wdr,_26Jun19.pdf PDF
Malone_06_OSUT.pdf PDF
W911SF-19-R-0021,_ARMOR_OSUT_3,_wdr,_27Jun19.pdf PDF
AR_OSUT__3_General_Requirements.pdf PDF
Statement_of_Work_-_OSCAR_09.pdf PDF
Statement_of_Work_-_OSCAR_02.pdf PDF
Statement_of_Work_-_OSCAR_07.pdf PDF
Statement_of_Work_-_OSCAR_03.pdf PDF
Statement_of_Work_-_OSCAR_12.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: AR OPSUT – Add eight receptacles in Simpson Range

26 Electrical

i) Electrical Guidelines (New Work):

The electrical new work shall comply with the design criteria specified in Technical Instructions TI 800- 01 Design Criteria, TI 800-03 Technical Requirements for Design-Build, TI 811-16 Lighting Design;

Technical Manual TM 5-811-1 Electric Power Supply and Distribution, TM 5-811-2 Electrical Design - Interior Electrical System, UFC 3-501-01, UFC 3-550-03FA, NFPA 70, IEEE C2, ANSI/ICEA S-94-649, TIA/EIA 568-B, and National Electrical Codes (NEC) and all referenced documents.

1. Existing electrical power system in the Simpson Range shall remain in place. Contractor must verify and/or determine that the existing power distribution system has sufficient current capacity for the additional loads. Upgrade the existing power distribution system if needed.

Provide and install new panelboard if required by the newly added receptacle loads.

2. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 1-2 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.

3. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 3-4 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.

4. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 5-6 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.

5. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 7-8 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.

6. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 9-10 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.

7. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 11-12 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.

8. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 13-14 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.

9. Provide and install 120V, 20A GFCI receptacle in, NEMA 4X, weatherproof enclosure between firing points 15-16 in the Simpson Range. Run the secondary direct burial power cable from the receptacle back to the panelboard in the ROC Tower. Provide and install receptacle mounting rack if needed.

File details come from the government source that posted it.