AR_OSUT__3_General_Requirements.pdf

PDF 201 KB Posted

Attached to
Armor OSUT 3 Federal contract opportunity
Solicitation number
W911SF-19-R-0021
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

About this file

Armor OSUT 3 Gen Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Armor OSUT 3, newest first.
File Type Posted
W911SF19R00210004.pdf PDF
ARMOR_OSUT_1_-_5_Pre_Award_Addendum_1.pdf PDF
44026_Steindam_Oscar_11_Nad_83_Grading_Plan_Model_Amended_12_July_2019.pdf PDF
W911SF19R00210003.pdf PDF
Armor_OSUT_3_Questions.pdf PDF
Blank_Bid_Breakdown_Form.xlsx XLSX spreadsheet
ARMOR_OSUT_1_-_5_General_Questions.pdf PDF
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
W911SF-19-R-0021-0002,_ARMOR_OSUT_3,_wdr,_5Jul19.pdf PDF
44026_McBrayer_Oscar_6_Nad_83_Site_Plan_Model_(1).pdf PDF
44026_Baum_Oscar_12_Nad_83_Grading_Plan_Model_(1).pdf PDF
0001.zip ZIP file
44026_Pulaski_Oscar_9_Nad_83_Site_Plan_Model_(1).pdf PDF
44026_Pulaski_Oscar_9_Nad_83_Grading_Plan_Model_(1).pdf PDF
44026_Steindam_Oscar_11_Nad_83_Site_Plan_Model_(1).pdf PDF
44026_Baum_Oscar_12_Nad_83_Site_Plan_Model_(1).pdf PDF
44026_Steindam_Oscar_11_Nad_83_Grading_Plan_Model_(1).pdf PDF
W911SF-19-R-0021-0001,_ARMOR_OSUT_3,_wdr,_1Jul19.pdf PDF
44026_Fowler_Oscar_7_Nad_83_Grading_Plan_Model_(1).pdf PDF
44026_Fowler_Oscar_7_Nad_83_Site_Plan_Model_(1).pdf PDF
Statement_of_Work_-_Oscar_12_Electricial.pdf PDF
SOW_Cover_Page_-_Oscar_11,_12,_9,_7,_6.pdf PDF
Malone_09_OSUT.pdf PDF
AR_OSUT_3_WD_GA20190118_dtd_12Apr19,_wdr,_26Jun19.pdf PDF
Malone_06_OSUT.pdf PDF
W911SF-19-R-0021,_ARMOR_OSUT_3,_wdr,_27Jun19.pdf PDF
Statement_of_Work_-_OSCAR_09.pdf PDF
Statement_of_Work_-_OSCAR_02.pdf PDF
Statement_of_Work_-_OSCAR_07.pdf PDF
Statement_of_Work_-_OSCAR_03.pdf PDF
Statement_of_Work_-_OSCAR_12.pdf PDF
Statement_of_Work_-_OSCAR_06.pdf PDF
Statement_of_Work_-_Simpson_Electrical.pdf PDF
Statement_of_Work_-_Firing_Point_CTA_-_Single.pdf PDF
Malone_07_OSUT.pdf PDF
Statement_of_Work_-_OSCAR_11.pdf PDF
Malone_12_OSUT.pdf PDF
Malone_11_OSUT.pdf PDF
Statement_of_Work_-_Oscar_3_Electrical.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION

FORT BENNING, GEORGIA Project #: 44041

General Requirements – AR OSUT #3 25 April 2019

Armor OSUT: Oscar 11, 12, 9, 7, 6, 3, 2 and Simpson Fort Benning, Georgia

PROJECT INCLUDES:

Oscar 11, 12, 9, 7, 6, 3, 2

1. Construct 16 ea. Firing Point CTA (Single) / per range

2. Construct 16 ea. Firing Positions 10x10 concrete pads / per range

Oscar 12, 3 & Simpson

3. Install 20 AMP power service for 8 lanes / per range

SCHEDULE:

The Contractor will only be allowed to work on three Machine Gun Record Fire Ranges (MRFs) at a time except during the months of June, July and August only 2 MRFs can be shut down at a time. This includes OSCARs, 12, 11, 9, 7, 6, 3, 2, and Simpson Range. As the Contractor completes one there will be a ten day transition period that the Contractor will have to include in their schedule before receiving control of the next MRF. The total contract time for completing all work on the MRFs shall not exceed 365 days. Below is an example schedule of a possible grouping of the ranges primarily based on earthwork.

1. REQUIRED BID DOCUMENTS

a. Proposed Schedule

b. Cost Proposal

LIQUIDATED DAMAGES:

In the event the contractor exceeds the completion date established per the Request for Task Order Proposal (RTOP), liquidated damages will be imposed on the contractor. The amount to be paid daily, will be $1,495.68 per day.

File details come from the government source that posted it.