DRAFT_SOLICITATION_16-R-0012_DPW_Benning_BASOPS__19_Jan_17.pdf

PDF 487 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations
Solicitation number
W911SF-16-R-0012
Issued by

About this file

Draft Solicitation

View the file

Other files

File Type Posted
Special_Notice___Sources_Sought___Benning_BASOPS_20_Mar_18.docx DOCX document
SOURCES_SOUGHT_15_Nov_17.pdf PDF
Amendment__0002_W911SF-16-R-0012_Benning_BASOPS_13_Oct_17.pdf PDF
Amendment__0001_W911SF-16-R-0012_Benning_BASOPS_8_Sep_17.pdf PDF
TE_5.2-026_Mas_Fire_Alarm_Schedule_as_of_01April2013.xlsx XLSX spreadsheet
TE_5.2-027_Traffic_Light_Control_List.xlsx XLSX spreadsheet
TE_1-010-_Environmental_Reports.xls XLS spreadsheet
TE_5.2-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_1-012-_Invoice_Register.docx DOCX document
TE_5.1-003-_Labor_Hours_for_IJO's_by_Craft.xls XLS spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_1-005-_Examples_of_Training_Courses.doc DOC document
TE_5.2-002-_List_of_Memorials.doc DOC document
TE_5.2-023_Fire_Sprinkler_system.xlsx XLSX spreadsheet
TE_5.3-002-_Dining_Facility_Equip.,_PMCS,_and_Repair_rev_by_amendment.doc DOC document
TE_5.5-004-_List_of_Buildings_Requiring_Monthly_Filter_Chang.xls XLS spreadsheet
TE_5.2-005-_Bldgs._Designated_for_Roof_Truss_Inspection.xls XLS spreadsheet
Technical_Exhibit_5.13-002a_Chiller_Data.docx DOCX document
Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.docx DOCX document
TE_5.4-005-_Operating_Checklist_for_Peak_Shaving_Plant_(old).doc DOC document
TE_5_12-001-Workload_Data.xls XLS spreadsheet
TE_5.4-004a-_Propane_Storage_Tanks-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.12-002_Cemeteries_Locations.xls XLS spreadsheet
TE_1-006-_TNG_Density.xls XLS spreadsheet
Technical_Exhibit_5.13-008_Chiller_Annual_Maintenance_Checklist.docx DOCX document
TE_5.6-002_List_of_Memorials.xlsx XLSX spreadsheet
TE_5.7-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE5.12-006b_Columbarium_Numbering.docx DOCX document
TE_1-002-_Facility_and_Land_Summary-_Ft._Benning.xls XLS spreadsheet
TE_5.10-003-_Bidgs._Requireing__Heater_Inspections_).docx DOCX document
TE_5.4-004-_List_of_Propane_Tanks-_Ft._Benning.xls XLS spreadsheet
TE_1-015-_DPW_Mail_Courier.doc DOC document
TE_5.11-002-_Maintenance_Allocation_Chart.doc DOC document
TE_5.5-005-_Building__Heating_Plants_and_Systems.xls XLS spreadsheet
TE_5.2-011-_Welcome_Home_Ceremony_Sign_Route,_Map_1.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.2-012-_Welcome_Home_Ceremony_Sign_Route,_Map_2.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_5.5-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_3-002_GFE_Gov't_Furnish_Equipment.xlsx XLSX spreadsheet
TE_5.11-003_Range_Roads_Grading.xls XLS spreadsheet
TE_5.10-001-_Required_Scheduled_Tasks.xlsx XLSX spreadsheet
TE_5.5-003_Changeover_Heat_to_Air.xls XLS spreadsheet
TE_5.4-002a_Monthly_emergency_Hour-meter_Reading_Report.docx DOCX document
Show 40 more

Latest 50 of 229 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 28 Feb 2017

X

A X B X C

D

EX

X G F 88 - 101

102 - 114 X H 115 - 121

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 121

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W911SF 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

BLDG 6 Suite 250 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 46

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

47 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

48 - 50 51 - 57

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 58 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 59 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

60 - 84

PART II - CONTRACT CLAUSES

MISSION & INSTALLATION CONTRACTING CMD

MICC - FORT BENNING

6600 MELOY DRIVE

BUILDING 6, SUITE 250

FT BENNING GA 31905

706-545-5172

706-545-6529FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

85 - 87

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

19 Jan 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W911SF-16-R-0012

Section A - Solicitation/Contract Form

SUMMARY OF REQUIREMENT

Solicitation #: W911SF-16-R-0012 A.1. Objective: It is the intention of the Government to award a Cost Plus Fixed Fee (CPFF) "C" type contract for Base Operations Support Services at Fort Benning, GA and other surrounding locations

A.2. Description of Requirement: The Mission and Installation Contracting Command (MICC) – Fort Benning has a requirement to contract Base Operations Support Services (BASOP) for the Directorate of Public Works (DPW) who supports the mission of the U.S. Army Maneuver Center for Excellence (MCoE) located at Fort Benning, GA. The DPW area of responsibility includes the Fort Benning installation, which is primarily located in the State of Georgia, adjacent to the City of Columbus, Georgia, but also extends into the State of Alabama.

Additionally, the DPW area of responsibility includes Camp Merrill (near Dahlonega, GA). The Fort Benning DPW is responsible for the operation, repair, and maintenance of the installation’s real property facilities; minor and major construction, range operations, and cemetery maintenance; additionally, management of energy, environmental, historical cultural, and natural resources programs. These services support more than 30,000 personnel on a permanent basis, a transient population of more than 25,000 students each year and more than 21,000 family members and 29,000 retirees, plus family members living in the area for a total average daily population of 103,000. The combined Benning and Merrill real estate consists of approximately 185,000 acres, and 21,000,000 square feet of buildings and structures space.

A.3. NAICS Code: 561210, Facilities Support Services

A.4. Size Standard: $38.5 Million

A.5. Set-Aside: Small Business

A.6. Additional Information: The requirement will include a number of new or newly renovated buildings and facilities that DPW is uncertain of how much support will be needed. There is no data available to determine the level of maintenance facility support. As such, several of the functional areas will have an increase in their level of support needed and man-hours.

A.7. Competition will be sought to the fullest extent possible with receipt of competitive proposals. The Government will evaluate proposed prices for reasonableness using proposal price analysis techniques,incluiding cost realism analysis. Proposed prices evaluated as unreasonable may be grounds for eliminating a proposal from competition.

A.8. This will be is a Best Value Source Selection, The Government will use a tradeoff between Past Performance and Price/Cost. This tradeoff process will permit tradeoff between price and the past performance of an offeror in reaching an award decision.

A.9. Offerors are requested to extend their offers for a minimum of 180 calendar days from date of receipt.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 30 Days

PHASE-IN PERIOD

FFP

The phase-in period is part of the base year of the Contract and starts immediately on the contract start date. During the phase-in period, the Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this Contract. The Contractor shall take all actions necessary for a smooth transition of the contracted operations. This period will be 30 calendar days in duration. The Government will make all facilities and equipment accessible to the Contractor for a maximum of 30 calendar days prior to the Contract start date. During this period the Contractor's management personnel will be permitted to observe any Facilities engineering operations at Fort Benning, as approved by the Contracting Officer (KO). During the phase-in period, the Contractor shall at a minimum:

•Establish the Project Management Office.

•Recruit and hire necessary personnel.

•Obtain all required certifications and clearances, including personnel security clearances.

•Participate in joint inventories and sign for Government-furnished Property (GFP) or real property.

•Develop and submit any required deliverables.

•Attend postaward meetings as required.

•Receive natural resources briefings.

•Accomplish any necessary training of its personnel to support the functions, (specifically including, but not limited to Section C-5).

FOB: Destination

NET AMT

0002 Hours

FACILITIES ENGINEERING SUPPORT

CPFF

LABOR: Facilities Engineering and Administrative Support/Management.

Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, C-3, C-4, C-5.1 thru 5.1.3.2, C-5.9) specifications and Technical Exhibits (TEs).

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0003 Job

FACILITIES ENGINEERING SUPPORT

COST

MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement.

0004 Hours

RECYCLING OPERATIONS AND WASTE DISPOSAL

CPFF

LABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.

All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru 5.6.4.7, C-5.8), specifications and Technical Exhibits (TEs).

0005 Job

RECYCLING OPERATIONS AND WASTE DISPOSAL

COST

MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS)

0006 Hours

GROUNDS MAINTENANCE

CPFF

LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C- 5.10.3.4, C-5.10.4.4, C-5.11.4.2), specifications and Technical Exhibits (TEs).

0007 Job

GROUNDS MAINTENANCE

COST

MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS)

0008 Hours

FACILITY MAINTENANCE -VERTICAL

CPFF

LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C- 5.11.4.3),specifications and Technical Exhibits (TEs).

0009 Job

FACILITY MAINTENANCE -VERTICAL

COST

MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

0010 Hours

FACILITY MAINTENANCE - HORIZONTAL

CPFF

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs).

0011 Job

FACILITY MAINTENANCE - HORIZONTAL

COST

MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as

0012 Hours

HEATING AND COOLING SYSTEMS

CPFF

LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), specifications and Technical Exhibits (TEs).

0013 Job

HEATING AND COOLING SYSTEMS

COST

MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS).

0014 Hours

WATER TREATMENT SERVICES

CPFF

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C- 5.10.3.6.5)

0015 Job

WATER TREATMENT SERVICES

COST

MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

0016 Hours

WASTE WATER SERVICES

CPFF

LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru 5.10.3.6.4, C-5.10.4.6), specifications and Technical Exhibits (TEs).

0017 Job

WASTE WATER SERVICES

COST

MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

0018 Hours

ARMY CEMETERIES

CPFF

LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and Technical Exhibits (TEs).

0019 Job

ARMY CEMETERIES

COST

MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as

0020 Job

TRAVEL

COST

Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government prior to the expenditure.

0021 Job

LEASED EQUIPMENT AND VEHICLES

COST

Includes all costs for the lease of vehicle and rental of equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-3.4.2.1).

0022 Job

LEASED EQUIPMENT AND VEHICLES

COST

DAMAGES: Charges for damages to vehicles and equipment.

0023 Job

LEASED EQUIPMENT AND VEHICLES

COST

FEES: Environmental, delivery and pickup fees for vehicles.

0024 1 Each

CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through September 30.

1001 Hours

OPTION FACILITIES ENGINEERING SUPPORT

CPFF

LABOR: Facilities Engineering and Administrative Support/Management.

Includes all costs for labor, supplies, equipment. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, C-3, C-4, C-5.1 thru 5.1.3.2, C-5.9) specifications and Technical Exhibits (TEs).

1002 Job

OPTION FACILITIES ENGINEERING SUPPORT

COST

MATERIALS: Recycling Operations and Waste Disposals. Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, (Sections C- 5.6.3.1, C-5.6.4.6 thru 5.6.4.7, C-5.8), specifications and Technical Exhibits

1003 Hours

OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL

CPFF

LABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.

All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru

1004 Job

OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL

CPFF

MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as

1005 Hours

OPTION GROUNDS MAINTENANCE

CPFF

LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C-

1006 Job

OPTION GROUNDS MAINTENANCE

COST

MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

1007 Hours

OPTION FACILITY MAINTENANCE -VERTICAL

CPFF

LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C-

1008 Lot

OPTION FACILITY MAINTENANCE -VERTICAL

COST

IMATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

1009 Hours

OPTION FACILITY MAINTENANCE - HORIZONTAL

CPFF

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits

1010 Job

OPTION FACILITY MAINTENANCE - HORIZONTAL

COST

MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as

1011 Hours

OPTION HEATING AND COOLING SYSTEMS

CPFF

LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), 1012 Job

OPTION HEATING AND COOLING SYSTEMS

COST

MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

1013 Hours

OPTION WATER TREATMENT SERVICES

CPFF

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C- 5.10.3.6.5)

1014 Job

OPTION WATER TREATMENT SERVICES

COST

MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

1015 Hours

OPTION WASTE WATER SERVICES

CPFF

LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru

1016 Job

OPTION WASTE WATER SERVICES

COST

MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

1017 Hours

OPTION ARMY CEMETERIES

CPFF

LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and

1018 Job

OPTION ARMY CEMETERIES

FFP

MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as

1019 Job

OPTION TRAVEL

COST

Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government

1020 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

EQUIPMENT: Includes all costs for the lease of vehicle and rental of equipment.

All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-3.4.2.1).

1021 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

DAMAGES: Charges for damages to vehicles and equipment

1022 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

1023 1 Each

OPTION CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through

2001 Hours

OPTION FACILITIES ENGINEERING SUPPORT

CPFF

LABOR: Facilities Engineering and Administrative Support/Management.

Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, 2002 Job

OPTION FACILITIES ENGINEERING SUPPORT

COST

MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform

2003 Hours

OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL

CPFF

LABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.

All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru

2004 Job

OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL

COST

MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as

2005 Hours

OPTION GROUNDS MAINTENANCE

CPFF

LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C-

2006 Jar

OPTION GROUNDS MAINTENANCE

COST

MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

2007 Hours

OPTION FACILITY MAINTENANCE -VERTICAL

CPFF

LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C-

2008 Job

OPTION FACILITY MAINTENANCE -VERTICAL

COST

MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

2009 Hours

OPTION FACILITY MAINTENANCE - HORIZONTAL

CPFF

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs

2010 Job

OPTION FACILITY MAINTENANCE - HORIZONTAL

COST

MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as

2011 Hours

OPTION HEATING AND COOLING SYSTEMS

FFP

LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), 2012 Job

OPTION HEATING AND COOLING SYSTEMS

COST

MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

2013 Hours

OPTION WATER TREATMENT SERVICES

CPFF

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-

2014 Job

OPTION WATER TREATMENT SERVICES

COST

MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

2015 Hours

OPTION WASTE WATER SERVICES

CPFF

LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru

2016 Job

OPTION WASTE WATER SERVICES

COST

MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

2017 Hours

OPTION ARMY CEMETERIES

CPFF

LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and Technical Exhibits (TEs)

2018 Job

OPTION ARMY CEMETERIES

COST

MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as

2019 Job

OPTION TRAVEL

COST

Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government prior to the expenditure

2020 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

EQUIPMENT: Includes all costs for the lease of vehicle and rental of equipment.

All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), 2021 Job

OPTION LEASED EQUIPMENT AND VEHICLES

FFP

DAMAGES: Charges for damages to vehicles and equipment

2022 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

2023 Each

OPTION CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through

3001 Hours

OPTION FACILITIES ENGINEERING SUPPORT

CPFF

LABOR: Facilities Engineering and Administrative Support/Management.

Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, 3002 Job

OPTION FACILITIES ENGINEERING SUPPORT

COST

MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform

3003 Hours

OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL

CPFF

LABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.

All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru

3004 Job

OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL

COST

MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as

3005 Hours

OPTION GROUNDS MAINTENANCE

CPFF

LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C-

3006 Job

OPTION GROUNDS MAINTENANCE

COST

MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

3007 Hours

OPTION FACILITY MAINTENANCE -VERTICAL

CPFF

LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C-

3008 Job

OPTION FACILITY MAINTENANCE -VERTICAL

COST

MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

3009 Hours

OPTION FACILITY MAINTENANCE - HORIZONTAL

CPFF

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs)

3010 Job

OPTION FACILITY MAINTENANCE - HORIZONTAL

COST

MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as

3011 Hours

OPTION HEATING AND COOLING SYSTEMS

CPFF

LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), 3012 Job

OPTION HEATING AND COOLING SYSTEMS

COST

MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

3013 Hours

OPTION WATER TREATMENT SERVICES

CPFF

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-

3014 Job

OPTION WATER TREATMENT SERVICES

COST

MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

3015 Hours

OPTION WASTE WATER SERVICES

CPFF

LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru

3016 Job

OPTION WASTE WATER SERVICES

COST

MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

3017 Hours

OPTION ARMY CEMETERIES

CPFF

LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and

3018 Job

OPTION ARMY CEMETERIES

COST

MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS).j

3019 Job

OPTION TRAVEL

COST

Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government

3020 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

EQUIPMENT: Includes all costs for the lease of vehicle and rental of equipment.

All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), 3021 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

DAMAGES: Charges for damages to vehicles and equipment.

3022 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

3023 Each

OPTION CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through September 30

4001 Hours

OPTION FACILITIES ENGINEERING SUPPORT

CPFF

LABOR: Facilities Engineering and Administrative Support/Management.

Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, 4002 Job

OPTION FACILITIES ENGINEERING SUPPORT

CPFF

MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform

4003 Hours

OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL

CPFF

ABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.

All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru

4004 Job

OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL

COST

MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS).

4005 Hours

OPTION GROUNDS MAINTENANCE

FFP

LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C- 5.10.3.4, C- 5.10.4.4, C-5.11.4.2), specifications and Technical Exhibits (TEs).

4006 Job

OPTION GROUNDS MAINTENANCE

COST

MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

4007 Hours

OPTION FACILITY MAINTENANCE -VERTICAL

CPFF

LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C-

4008 Job

OPTION FACILITY MAINTENANCE -VERTICAL

COST

MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

4009 Hours

OPTION FACILITY MAINTENANCE - HORIZONTAL

FFP

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits

4010 Job

OPTION FACILITY MAINTENANCE - HORIZONTAL

COST

MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS).

4011 Hours

OPTION HEATING AND COOLING SYSTEMS

CPFF

LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), 4012 Job

OPTION HEATING AND COOLING SYSTEMS

COST

MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

4013 Hours

OPTION WATER TREATMENT SERVICES

CPFF

LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C- 5.10.3.6.5).

4014 Job

OPTION WATER TREATMENT SERVICES

COST

MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

4015 Hours

OPTION WATER TREATMENT SERVICES

CPFF

LABOR: Water Treatment Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru

4016 Job

OPTION WASTE WATER SERVICES

COST

MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the

4017 Hours

OPTION ARMY CEMETERIES

CPFF

LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and

4018 Job

OPTION ARMY CEMETERIES

COST

MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as

4019 Job

OPTION TRAVEL

COST

Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government

4020 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

Includes all costs for labor, supplies for lease vehicle and equipment rentals. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-3.4..2.1).

4021 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

DAMAGES : Charges for damages to vehicles and equipment.

4022 Job

OPTION LEASED EQUIPMENT AND VEHICLES

COST

FEES : Environmental, delivery and pickup fees for vehicles.

4023 Each

OPTION CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT:

See Performance Work Statement (PWS) Attachments List in, Section: J PWS Sections C-1 - C-4 PWS Sections C-5.1 -C-5.13

Technical Exhibits attachment list of related sections of PWS:

TE 3-001 through TE 5.15-003

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 1018 Destination Government Destination Government 1019 Destination Government Destination Government 1020 Destination Government Destination Government

1021 Destination Government Destination Government 1022 Destination Government Destination Government 1023 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government 2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 2017 Destination Government Destination Government 2018 Destination Government Destination Government 2019 Destination Government Destination Government 2020 Destination Government Destination Government 2021 Destination Government Destination Government 2022 Destination Government Destination Government 2023 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 3011 Destination Government Destination Government 3012 Destination Government Destination Government 3013 Destination Government Destination Government 3014 Destination Government Destination Government 3015 Destination Government Destination Government 3016 Destination Government Destination Government 3017 Destination Government Destination Government 3018 Destination Government Destination Government 3019 Destination Government Destination Government 3020 Destination Government Destination Government 3021 Destination Government Destination Government 3022 Destination Government Destination Government 3023 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007 Destination Government Destination Government

4008 Destination Government Destination Government 4009 Destination Government Destination Government 4010 Destination Government Destination Government 4011 Destination Government Destination Government 4012 Destination Government Destination Government 4013 Destination Government Destination Government 4014 Destination Government Destination Government 4015 Destination Government Destination Government 4016 Destination Government Destination Government 4017 Destination Government Destination Government 4018 Destination Government Destination Government 4019 Destination Government Destination Government 4020 Destination Government Destination Government 4021 Destination Government Destination Government 4022 Destination Government Destination Government 4023 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-3 Inspection Of Supplies Cost-Reimbursement MAY 2001 52.246-5 Inspection Of Services Cost-Reimbursement APR 1984 52.246-12 Inspection of Construction AUG 1996 52.246-13 Inspection--Dismantling, Demolition, or Removal of

Improvements

AUG 1996

252.246-7000 Material Inspection And Receiving Report MAR 2008

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC

0001 POP 26-MAY-2017 TO

25-JUN-2017

N/A DPW FACILITIES DIVISION

KIRK TICKNOR

BLDG 6, ROOM 321

FORT BENNING GA 31905

706-545-7928

W909H3

0002 POP 26-JUN-2017 TO

25-MAY-2018

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0016 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0017 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0018 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0019 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0020 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0021 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0022 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0023 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0024 POP 26-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 26-MAY-2018 TO

25-MAY-2019

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1010 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1011 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1012 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1013 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1014 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1015 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1016 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1017 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1018 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1019 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1020 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1021 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1022 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1023 POP 26-MAY-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 26-MAY-2019 TO

25-MAY-2020

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2007 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2008 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2009 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2010 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2011 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2012 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2013 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2014 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2015 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2016 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2017 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2018 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2019 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2020 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2021 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2022 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2023 POP 26-MAY-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 26-MAY-2020 TO

25-MAY-2021

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 26-MAY-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 26-MAY-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 26-MAY-2020 TO

N/A (SAME AS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .