CODE
(Hour)
PAGE(S)
until 02:00 PM local time 28 Feb 2017
X
A X B X C
D
EX
X G F 88 - 101
102 - 114 X H 115 - 121
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 121
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W911SF 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
BLDG 6 Suite 250 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 46
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
47 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
48 - 50 51 - 57
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 58 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 59 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
60 - 84
PART II - CONTRACT CLAUSES
MISSION & INSTALLATION CONTRACTING CMD
MICC - FORT BENNING
6600 MELOY DRIVE
BUILDING 6, SUITE 250
FT BENNING GA 31905
706-545-5172
706-545-6529FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
85 - 87
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
19 Jan 2017
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W911SF-16-R-0012
Section A - Solicitation/Contract Form
SUMMARY OF REQUIREMENT
Solicitation #: W911SF-16-R-0012 A.1. Objective: It is the intention of the Government to award a Cost Plus Fixed Fee (CPFF) "C" type contract for Base Operations Support Services at Fort Benning, GA and other surrounding locations
A.2. Description of Requirement: The Mission and Installation Contracting Command (MICC) – Fort Benning has a requirement to contract Base Operations Support Services (BASOP) for the Directorate of Public Works (DPW) who supports the mission of the U.S. Army Maneuver Center for Excellence (MCoE) located at Fort Benning, GA. The DPW area of responsibility includes the Fort Benning installation, which is primarily located in the State of Georgia, adjacent to the City of Columbus, Georgia, but also extends into the State of Alabama.
Additionally, the DPW area of responsibility includes Camp Merrill (near Dahlonega, GA). The Fort Benning DPW is responsible for the operation, repair, and maintenance of the installation’s real property facilities; minor and major construction, range operations, and cemetery maintenance; additionally, management of energy, environmental, historical cultural, and natural resources programs. These services support more than 30,000 personnel on a permanent basis, a transient population of more than 25,000 students each year and more than 21,000 family members and 29,000 retirees, plus family members living in the area for a total average daily population of 103,000. The combined Benning and Merrill real estate consists of approximately 185,000 acres, and 21,000,000 square feet of buildings and structures space.
A.3. NAICS Code: 561210, Facilities Support Services
A.4. Size Standard: $38.5 Million
A.5. Set-Aside: Small Business
A.6. Additional Information: The requirement will include a number of new or newly renovated buildings and facilities that DPW is uncertain of how much support will be needed. There is no data available to determine the level of maintenance facility support. As such, several of the functional areas will have an increase in their level of support needed and man-hours.
A.7. Competition will be sought to the fullest extent possible with receipt of competitive proposals. The Government will evaluate proposed prices for reasonableness using proposal price analysis techniques,incluiding cost realism analysis. Proposed prices evaluated as unreasonable may be grounds for eliminating a proposal from competition.
A.8. This will be is a Best Value Source Selection, The Government will use a tradeoff between Past Performance and Price/Cost. This tradeoff process will permit tradeoff between price and the past performance of an offeror in reaching an award decision.
A.9. Offerors are requested to extend their offers for a minimum of 180 calendar days from date of receipt.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 30 Days
PHASE-IN PERIOD
FFP
The phase-in period is part of the base year of the Contract and starts immediately on the contract start date. During the phase-in period, the Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this Contract. The Contractor shall take all actions necessary for a smooth transition of the contracted operations. This period will be 30 calendar days in duration. The Government will make all facilities and equipment accessible to the Contractor for a maximum of 30 calendar days prior to the Contract start date. During this period the Contractor's management personnel will be permitted to observe any Facilities engineering operations at Fort Benning, as approved by the Contracting Officer (KO). During the phase-in period, the Contractor shall at a minimum:
•Establish the Project Management Office.
•Recruit and hire necessary personnel.
•Obtain all required certifications and clearances, including personnel security clearances.
•Participate in joint inventories and sign for Government-furnished Property (GFP) or real property.
•Develop and submit any required deliverables.
•Attend postaward meetings as required.
•Receive natural resources briefings.
•Accomplish any necessary training of its personnel to support the functions, (specifically including, but not limited to Section C-5).
FOB: Destination
NET AMT
0002 Hours
FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, C-3, C-4, C-5.1 thru 5.1.3.2, C-5.9) specifications and Technical Exhibits (TEs).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0003 Job
FACILITIES ENGINEERING SUPPORT
COST
MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement.
0004 Hours
RECYCLING OPERATIONS AND WASTE DISPOSAL
CPFF
LABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.
All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru 5.6.4.7, C-5.8), specifications and Technical Exhibits (TEs).
0005 Job
RECYCLING OPERATIONS AND WASTE DISPOSAL
COST
MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS)
0006 Hours
GROUNDS MAINTENANCE
CPFF
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C- 5.10.3.4, C-5.10.4.4, C-5.11.4.2), specifications and Technical Exhibits (TEs).
0007 Job
GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS)
0008 Hours
FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C- 5.11.4.3),specifications and Technical Exhibits (TEs).
0009 Job
FACILITY MAINTENANCE -VERTICAL
COST
MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
0010 Hours
FACILITY MAINTENANCE - HORIZONTAL
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs).
0011 Job
FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as
0012 Hours
HEATING AND COOLING SYSTEMS
CPFF
LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), specifications and Technical Exhibits (TEs).
0013 Job
HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS).
0014 Hours
WATER TREATMENT SERVICES
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C- 5.10.3.6.5)
0015 Job
WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
0016 Hours
WASTE WATER SERVICES
CPFF
LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru 5.10.3.6.4, C-5.10.4.6), specifications and Technical Exhibits (TEs).
0017 Job
WASTE WATER SERVICES
COST
MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
0018 Hours
ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and Technical Exhibits (TEs).
0019 Job
ARMY CEMETERIES
COST
MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as
0020 Job
TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government prior to the expenditure.
0021 Job
LEASED EQUIPMENT AND VEHICLES
COST
Includes all costs for the lease of vehicle and rental of equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-3.4.2.1).
0022 Job
LEASED EQUIPMENT AND VEHICLES
COST
DAMAGES: Charges for damages to vehicles and equipment.
0023 Job
LEASED EQUIPMENT AND VEHICLES
COST
FEES: Environmental, delivery and pickup fees for vehicles.
0024 1 Each
CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through September 30.
1001 Hours
OPTION FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor, supplies, equipment. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, C-3, C-4, C-5.1 thru 5.1.3.2, C-5.9) specifications and Technical Exhibits (TEs).
1002 Job
OPTION FACILITIES ENGINEERING SUPPORT
COST
MATERIALS: Recycling Operations and Waste Disposals. Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, (Sections C- 5.6.3.1, C-5.6.4.6 thru 5.6.4.7, C-5.8), specifications and Technical Exhibits
1003 Hours
OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL
CPFF
LABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.
All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru
1004 Job
OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL
CPFF
MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as
1005 Hours
OPTION GROUNDS MAINTENANCE
CPFF
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C-
1006 Job
OPTION GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
1007 Hours
OPTION FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C-
1008 Lot
OPTION FACILITY MAINTENANCE -VERTICAL
COST
IMATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
1009 Hours
OPTION FACILITY MAINTENANCE - HORIZONTAL
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits
1010 Job
OPTION FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as
1011 Hours
OPTION HEATING AND COOLING SYSTEMS
CPFF
LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), 1012 Job
OPTION HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
1013 Hours
OPTION WATER TREATMENT SERVICES
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C- 5.10.3.6.5)
1014 Job
OPTION WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
1015 Hours
OPTION WASTE WATER SERVICES
CPFF
LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru
1016 Job
OPTION WASTE WATER SERVICES
COST
MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
1017 Hours
OPTION ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and
1018 Job
OPTION ARMY CEMETERIES
FFP
MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as
1019 Job
OPTION TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government
1020 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
EQUIPMENT: Includes all costs for the lease of vehicle and rental of equipment.
All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-3.4.2.1).
1021 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
DAMAGES: Charges for damages to vehicles and equipment
1022 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
1023 1 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through
2001 Hours
OPTION FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, 2002 Job
OPTION FACILITIES ENGINEERING SUPPORT
COST
MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform
2003 Hours
OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL
CPFF
LABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.
All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru
2004 Job
OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL
COST
MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as
2005 Hours
OPTION GROUNDS MAINTENANCE
CPFF
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C-
2006 Jar
OPTION GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
2007 Hours
OPTION FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C-
2008 Job
OPTION FACILITY MAINTENANCE -VERTICAL
COST
MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
2009 Hours
OPTION FACILITY MAINTENANCE - HORIZONTAL
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs
2010 Job
OPTION FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as
2011 Hours
OPTION HEATING AND COOLING SYSTEMS
FFP
LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), 2012 Job
OPTION HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
2013 Hours
OPTION WATER TREATMENT SERVICES
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-
2014 Job
OPTION WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
2015 Hours
OPTION WASTE WATER SERVICES
CPFF
LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru
2016 Job
OPTION WASTE WATER SERVICES
COST
MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
2017 Hours
OPTION ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and Technical Exhibits (TEs)
2018 Job
OPTION ARMY CEMETERIES
COST
MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as
2019 Job
OPTION TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government prior to the expenditure
2020 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
EQUIPMENT: Includes all costs for the lease of vehicle and rental of equipment.
All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), 2021 Job
OPTION LEASED EQUIPMENT AND VEHICLES
FFP
DAMAGES: Charges for damages to vehicles and equipment
2022 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
2023 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through
3001 Hours
OPTION FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, 3002 Job
OPTION FACILITIES ENGINEERING SUPPORT
COST
MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform
3003 Hours
OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL
CPFF
LABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.
All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru
3004 Job
OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL
COST
MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as
3005 Hours
OPTION GROUNDS MAINTENANCE
CPFF
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C-
3006 Job
OPTION GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
3007 Hours
OPTION FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C-
3008 Job
OPTION FACILITY MAINTENANCE -VERTICAL
COST
MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
3009 Hours
OPTION FACILITY MAINTENANCE - HORIZONTAL
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs)
3010 Job
OPTION FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as
3011 Hours
OPTION HEATING AND COOLING SYSTEMS
CPFF
LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), 3012 Job
OPTION HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
3013 Hours
OPTION WATER TREATMENT SERVICES
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-
3014 Job
OPTION WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
3015 Hours
OPTION WASTE WATER SERVICES
CPFF
LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru
3016 Job
OPTION WASTE WATER SERVICES
COST
MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
3017 Hours
OPTION ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and
3018 Job
OPTION ARMY CEMETERIES
COST
MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS).j
3019 Job
OPTION TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government
3020 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
EQUIPMENT: Includes all costs for the lease of vehicle and rental of equipment.
All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), 3021 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
DAMAGES: Charges for damages to vehicles and equipment.
3022 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
3023 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through September 30
4001 Hours
OPTION FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, 4002 Job
OPTION FACILITIES ENGINEERING SUPPORT
CPFF
MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform
4003 Hours
OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL
CPFF
ABOR: Recycling Operations and Waste Disposal. Includes all costs for labor.
All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.1, C-5.6.4.6 thru
4004 Job
OPTION RECYCLING OPERATIONS AND WASTE DISPOSAL
COST
MATERIALS: Recycling Operations and Waste Disposal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS).
4005 Hours
OPTION GROUNDS MAINTENANCE
FFP
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru 5.6.4.5, C-5.6.4.8 thru 5.6.4.16, C- 5.10.3.4, C- 5.10.4.4, C-5.11.4.2), specifications and Technical Exhibits (TEs).
4006 Job
OPTION GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
4007 Hours
OPTION FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru 5.5.4.7, C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C-
4008 Job
OPTION FACILITY MAINTENANCE -VERTICAL
COST
MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
4009 Hours
OPTION FACILITY MAINTENANCE - HORIZONTAL
FFP
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits
4010 Job
OPTION FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS).
4011 Hours
OPTION HEATING AND COOLING SYSTEMS
CPFF
LABOR: Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru 5.5.3.3, C-5.13), 4012 Job
OPTION HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
4013 Hours
OPTION WATER TREATMENT SERVICES
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C- 5.10.3.6.5).
4014 Job
OPTION WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
4015 Hours
OPTION WATER TREATMENT SERVICES
CPFF
LABOR: Water Treatment Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru
4016 Job
OPTION WASTE WATER SERVICES
COST
MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the
4017 Hours
OPTION ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and
4018 Job
OPTION ARMY CEMETERIES
COST
MATERIALS:Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as
4019 Job
OPTION TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government
4020 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
Includes all costs for labor, supplies for lease vehicle and equipment rentals. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-3.4..2.1).
4021 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
DAMAGES : Charges for damages to vehicles and equipment.
4022 Job
OPTION LEASED EQUIPMENT AND VEHICLES
COST
FEES : Environmental, delivery and pickup fees for vehicles.
4023 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT:
See Performance Work Statement (PWS) Attachments List in, Section: J PWS Sections C-1 - C-4 PWS Sections C-5.1 -C-5.13
Technical Exhibits attachment list of related sections of PWS:
TE 3-001 through TE 5.15-003
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 1018 Destination Government Destination Government 1019 Destination Government Destination Government 1020 Destination Government Destination Government
1021 Destination Government Destination Government 1022 Destination Government Destination Government 1023 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government 2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 2017 Destination Government Destination Government 2018 Destination Government Destination Government 2019 Destination Government Destination Government 2020 Destination Government Destination Government 2021 Destination Government Destination Government 2022 Destination Government Destination Government 2023 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 3011 Destination Government Destination Government 3012 Destination Government Destination Government 3013 Destination Government Destination Government 3014 Destination Government Destination Government 3015 Destination Government Destination Government 3016 Destination Government Destination Government 3017 Destination Government Destination Government 3018 Destination Government Destination Government 3019 Destination Government Destination Government 3020 Destination Government Destination Government 3021 Destination Government Destination Government 3022 Destination Government Destination Government 3023 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007 Destination Government Destination Government
4008 Destination Government Destination Government 4009 Destination Government Destination Government 4010 Destination Government Destination Government 4011 Destination Government Destination Government 4012 Destination Government Destination Government 4013 Destination Government Destination Government 4014 Destination Government Destination Government 4015 Destination Government Destination Government 4016 Destination Government Destination Government 4017 Destination Government Destination Government 4018 Destination Government Destination Government 4019 Destination Government Destination Government 4020 Destination Government Destination Government 4021 Destination Government Destination Government 4022 Destination Government Destination Government 4023 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-3 Inspection Of Supplies Cost-Reimbursement MAY 2001 52.246-5 Inspection Of Services Cost-Reimbursement APR 1984 52.246-12 Inspection of Construction AUG 1996 52.246-13 Inspection--Dismantling, Demolition, or Removal of
Improvements
AUG 1996
252.246-7000 Material Inspection And Receiving Report MAR 2008
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 26-MAY-2017 TO
25-JUN-2017
N/A DPW FACILITIES DIVISION
KIRK TICKNOR
BLDG 6, ROOM 321
FORT BENNING GA 31905
706-545-7928
W909H3
0002 POP 26-JUN-2017 TO
25-MAY-2018
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0011 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0012 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0013 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0014 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0015 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0016 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0017 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0018 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0019 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0020 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0021 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0022 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0023 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0024 POP 26-JUN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 26-MAY-2018 TO
25-MAY-2019
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1011 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1012 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1013 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1014 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1015 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1016 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1017 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1018 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1019 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1020 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1021 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1022 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1023 POP 26-MAY-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 26-MAY-2019 TO
25-MAY-2020
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2009 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2010 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2011 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2012 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2013 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2014 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2015 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2016 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2017 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2018 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2019 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2020 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2021 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2022 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2023 POP 26-MAY-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 26-MAY-2020 TO
25-MAY-2021
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 26-MAY-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 26-MAY-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3004 POP 26-MAY-2020 TO
N/A (SAME AS…
This is the start of the file's text. The full file is on GovTribe.