W911SD-24-R-0077 SOLICITATION AMEND 0001 D.FINAL Graduation - Audio Visual Lighting.pdf
PDF 388 KB Posted
- Attached to
- SOLICITATION - U. S. Army West Point 2024 USMA Graduation Sound Reinforcement and Lighting Requirement
- Solicitation number
- W911SD-24-R-0077
About this file
This document is Amendment 0001 to Solicitation W911SD-24-R-0077 for the U.S. Army West Point 2024 USMA Graduation Sound Reinforcement and Lighting Requirement. The purpose of this amendment is to incorporate Request for Information (RFI) questions and answers, and provide a photographic representation of the stadium layout. Key details include:
The contractor shall provide personnel for operational testing, graduation rehearsal, and system check by academy personnel by 5:00 a.m. on May 24, 2024. Load-in and set-up can begin as early as 7:30 a.m. on Tuesday, May 21 and can continue until 7:00 p.m. The government will provide risers for the press box and camera positions. The contractor shall incorporate redundant sound reinforcement in case of primary equipment failure, with an acceptable downtime of no more than 6 minutes in the event of a power failure. The solicitation is 100% set aside for small businesses under NAICS code 512290, with a size standard of $22 million per year.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0012079045
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate Request for Information (RFI) questions and answ ers, and photographic representation, no other changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Apr-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SD24R0077
X 9B. DATED (SEE ITEM 11)
11-Mar-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Apr-2024
CODE
MICC - WEST POINT
681 ROGERS PLACE
WEST POINT NY 10996-1514
W911SD 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SD24R0077
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFI QUESTIONS & ANSWERS
IT IS THE OFFEROR'S RESPONSIBILTY TO REVIEW ALL
ATTACHMENTS PERTAINING TO THIS SOLICITAION.
Photographic Representation of Stadium—See Attached (Stadium layout)
1 Performance Work Statement 9. PERFORMANCE TIMELINE (Page 5/77) This section's wording is a bit awkward, what day is the rehearsal for us? Is it May 23, 2024 and only 1 day?
The Rehearsal Will be May 24
2 Performance Work Statement 9. PERFORMANCE TIMELINE (Page 5/77) "The system shall be installed, fully operational and ready for performance review by 1530 on May 23, 2024. This appears to conflict with ""The contractor shall provide personnel for the purpose of operational testing, This Is the time VI Management/COR will check everything and make sure that all requirements in the PWS are met and ready to go.
graduation rehearsal, and system check by academy personnel by 5:00 a.m. on day of rehearsal between May 22 and 24, 2022.
At this Time the G-3 office will come in and want to check the mic, see that lights are on, and make sure that everything is ready for the rehearsal to begin they may also make some admin announcements. Also answered above this will take place on 24 May.
Graduation rehearsal will begin at 0600.""
The March on and full dress rehearsal will start at 0600
Please clarify this statement so we clearly know our requirement/date/time. Please advise what day is the actual rehearsal?
May 24
Please advise what day and time, we can load in and begin set up.
Load in and set up can start as early as 730AM Tuesday May 21 How late can we stay on set up day/s in the stadium? "
Until 7:00 pm
3 Performance Work Statement 11. GOVERNMENT PROVIDED (Page 6/77);
6. DAIS LIGHTING (Page 5/77) We want to confirm that all risers for Press Box, Camera positions are being supplied by government?
Yes risers for press and camera positions are being provided by the government.
4 Performance Work Statement 1. GUEST SEATING; 3. LOUDSPEAKERS; 5.
DAIS Can the Government supply any diagrams of Michie Stadium along with any previous or current seating chart?
Yes Please advise the number of people seated on the turf and the number of people in the stands. On their turf is between 1300-1500 people.
In the stadium plan for the system to cover as if it is to be full in all of the areas that are specified in the P.W.S.
5 Performance Work Statement 7. POWER (Page 5/77) How far is the house/stadium electrical power located from the stage?
We have not measured it but from the center of the stage to the south side wall would be about 60 yards , from there to the connection point would have to be measured.
6 Performance Work Statement Not Mentioned Is there any video screens on stage or off stage for IMAG or any prompters needed from us?
Nothing needed or required from contractor.
7 Performance Work Statement Not Mentioned What specific concerns are there with any line of sights from the audience regarding lighting tower placements for the stage?
Design the lighting system to meet the specs with minimal amount of sight line obstructions.
8 Performance Work Statement REQUIREMENT (page 3/77) The contractor shall incorporate a means of redundant sound reinforcement should a failure of the contractor’s primary equipment components occur. What is the acceptable down time in case of power failure?
Should be no more than 6 minutes.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .