W911SD-20-R-0004_PWS_B_753_Maint_Controls.pdf
PDF 52 KB Posted
- Attached to
- Instruments-Controls Building 753 Federal contract opportunity
- Solicitation number
- W911SD-20-R-0004
About this file
PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SD-20-R-0004_Sources_Rev._LH_Sought_B_753_Maint_Controls.pdf | ||
| W911SD-20-R-0004_PRS_B_753_Maint_Controls.pdf | ||
| W911SD-20-R-0004_Solicitation_SITE_VISIT_Text_Bldg_753_Maint_Controls.pdf | ||
| W911SD-20-R-0004_PWS_B_753_Maint_Controls.pdf | ||
| W911SD-20-R-0004_Solicitation_SITE_VISIT_Text_Bldg_753_Maint_Controls.pdf | ||
| W911SD-20-R-0004_Sources_LH_Sought_B_753_Maint_Controls.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW- Service/Repair Phoenix Controls Located On Supreme Air LV Chemical Lab Hoods.
POP Date- 8/10/20-8/9/25
The Contractor shall provide all personnel, management, and any other items and services not government furnished, necessary to service/inspect Phoenix Controls on 75 Supreme Air LV chemical lab hoods with located throughout BLDG#, on the United States Army Garrison (USAGWP), West Point, New York.
Services to include: Update Phoenix controls, download & back-up database, communication verification.
Controller Maintenance to include: power supply verification, communication, analog input- 4ma & 20ma, binary input check- open & closed, analog output check, alarm sequence verification.
Fume Hoods: face velocity verification. Room Temperature Controls: Temperature transmitter calibration, reheat valve operation, set point verification.
Fume Hood Controls: power supply verification, communication verification, sensor connections verification, hood valve positioning verification, set point verification, zero point verification, parameters verification, and display operation verification.
Airflow measuring equipment: Airflow measurement and calibration, velocity pressure and flow rate verification, output and power level verification.
Airflow and Pressure Control Valve: Review set point deviation, review and adjust tuning parameters, review control range. Make necessary repairs as needed.
File details come from the government source that posted it.