Solicitation1.pdf
PDF 3 MB Posted
- Attached to
- Masonry Repairs/Restoration Federal contract opportunity
- Solicitation number
- W911SD19R0147
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_2.pdf | ||
| SolicitationAmendment_1.pdf | ||
| Masonry_PWS_SOW_FY19.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011154790-0001
A. Masonry Restoration at the United States Military Academy, West Point NY for the follow ing period of performance.
Base Year : September 30, 2019 - September 29, 2020 Option year 1: September 30, 2020 - September 29, 2021 Option year 2: September 30, 2021 - September 29, 2022 Option year 3: September 30, 2022 - September 29, 2023 Option year 4: September 30, 2023 - September 29, 2024 B. This is a total small business set-aside, low est price technically acceptable source selection process in accordance w ith (IAW) FAR 15.101-2.
C. The North American Industry Classif ication System (NAICS) code for this project is 238140. The applicable small business size standard is $15.0M.
D. IAW FAR 36.204 the price magnitude for this requirement is betw een $10,000,000 and $15,000,000.
E. This is a single ID/IQ aw ard.
F. The minimum guaranteed contract amount is $3,000.00 G. The maximum contract amount is $15,000,000.
ROBERT L. PIZZANO 845-938-8182
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
26-Jun-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 Jul 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC - WEST POINT
681 HARDEE PLACE
WEST POINT NY 10996-1514
W911SD
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
12:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W911SD19R0147 480
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 75,000 Linear
Foot
DEMO JOINTS & CONCRETE CAP
FFP
DEMO JOINTS & CONCRETE CAP - SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
0002 870 Linear
REMOVAL OF CAP STONE
REMOVAL OF CAP STONE - SEE ATTACHED STATEMENT OF WORK. -
All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0003 420 Linear
Foot
RMVL OF CTE PRE-CST/LIMESTONE CAP
FFP
RMVL OF CTE PRE-CST/LIMESTONE CAP - SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1,200 Square
Foot
CLEAN DEBIRS AWAY FROM JOINTS
FFP
CLEAN DEBIRS AWAY FROM JOINTS - SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0005 2,500 Linear
REPOINT JOINTS, FLAT JOINTS
REPOINT JOINTS, FLAT JOINTS- SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0006 2,500 Linear
REPOINT JOINTS, TOOLED
REPOINT JOINTS, TOOLED- SEE ATTACHED STATEMENT OF WORK. -
All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0007 150 Linear
RPLC COPING STN(SLATE BLU STN) G.F.
RPLC COPING STN(SLATE BLU STN) G.F.- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0008 150 Linear
RPLC COPING STN(SLATE BLU STN) C.F.
RPLC COPING STN(SLATE BLU STN) C.F.- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0009 150 Linear
RPLC CNCRT PRECST/LIMESTN CAP
RPLC CNCRT PRECST/LIMESTN CAP- SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0010 1,200 Square
CLEAN AFTER REPOINTING
CLEAN AFTER REPOINTING- SEE ATTACHED STATEMENT OF WORK. -
All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0011 100 Job
STN MASNRY RPLCMNT AS NEEDED
FFP
STN MASNRY RPLCMNT AS NEEDED- SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0012 1,000 Cubic Feet
RESTTING OS LOOSE STONES
FFP
RESTTING OS LOOSE STONES- SEE ATTACHED STATEMENT OF WORK.
- All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0013 1,000 Each
CAPSTONE PINNING
FFP
CAPSTONE PINNING- SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0014 900 Linear
DEMO CONCRETE CAP
DEMO CONCRETE CAP- SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0015 10 Each
REMOVE VENEER STONE
FFP
REMOVE VENEER STONE- SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0016 10 Each
REMOVE VENEER STONE
FFP
REMOVE VENEER STONE- SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0017 20 Each
RMV PARPET WALLS CATSTN UPTO 5' LNG
FFP
RMV PARPET WALLS CATSTN UPTO 5' LNG- SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0018 500 Linear
Foot
REPNT STRCT WALLS STN UPTO 8' HIGH
FFP
REPNT STRCT WALLS STN UPTO 8' HIGH- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0019 500 Linear
REPNT STRCT WALL STN 8'-16' HIGH
REPNT STRCT WALL STN 8'-16' HIGH- SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0020 500 Linear
REPNT STRCT WALLS STN 16'-24' HIGH
REPNT STRCT WALLS STN 16'-24' HIGH- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0021 500 Linear
Foot
REPNT STRCT WALL STN 24' & ABOVE
FFP
REPNT STRCT WALL STN 24' & ABOVE- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0022 500 Linear
Foot
REPNT PARAPET WALL STN ROOF SIDE
FFP
REPNT PARAPET WALL STN ROOF SIDE- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0023 500 Linear
REPNT PENTHOUSE WALLS STN UP TO 10'
REPNT PENTHOUSE WALLS STN UP TO 10'- SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0024 500 Linear
REPNT PNTHSE WALL STN UP TO 10' & ABV
REPNT PNTHSE WALL STN UP TO 10' & ABV- SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0025 500 Square
REPNT STRCT WALLS BRICK UPTO 8' HIGH
REPNT STRCT WALLS BRICK UPTO 8' HIGH- SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0026 500 Square
REPNT STRCT WALLS BRK FROM 8'-16'
REPNT STRCT WALLS BRK FROM 8'-16'- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0027 500 Square
Foot
REPNT STRCT WALLS BRK 16'-24' HIGH
FFP
- SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0028 500 Square
Foot
REPNT STRCT WALLS BRK 24' & ABOVE
FFP
REPNT STRCT WALLS BRK 24' & ABOVE- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0029 500 Square
Foot
REPNT PARAPET WALLS BRK ROOF SIDE
FFP
REPNT PARAPET WALLS BRK ROOF SIDE- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0030 500 Square
Foot
REPNT PNTHS WALLS BRK UP TO 10'
FFP
REPNT PNTHS WALLS BRK UP TO 10'- SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0031 500 Square
REPNT PNTHS WALLS BRK 10' & ABOVE
REPNT PNTHS WALLS BRK 10' & ABOVE- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0032 500 Square
RESET VENEER STONE UPTO 8' HIGH
RESET VENEER STONE UPTO 8' HIGH- SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0033 500 Square
RESET VENEER STONE UPTO 8'-16' HIGH
RESET VENEER STONE UPTO 8'-16' HIGH- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0034 500 Square
RESET VENEER STONE UPTO 16'-24' HIGH
RESET VENEER STONE UPTO 16'-24' HIGH- SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0035 500 Square
RESET VENEER STONE 24' & ABOVE
RESET VENEER STONE 24' & ABOVE- SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0036 500 Square
RESET VENEER STONE WALS ROOF SIDE
RESET VENEER STONE WALS ROOF SIDE- SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020.
FOB: Destination
0037 500 Square
RESET VENEER STN PNTHSE WALLS 10' H
RESET VENEER STN PNTHSE WALLS 10' H -SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29, 2020 FOB: Destination
0038 500 Square
RESET VENEER STN PNTHS WALS 10' & UP
RESET VENEER STN PNTHS WALLS 10' & UP-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0039 500 Square
RPLC THROUGH WALL FLASHING
RPLC THROUGH WALL FLASHING-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0040 500 Square
RPLC PARAPET WALL FLASHING
RPLC PARAPET WALL FLASHING-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0041 500 Each
RPLC VENEER WALL TILES/ANCHORS
FFP
RPLC VENEER WALL TILES/ANCHORS-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0042 500 Linear
CAULKING CAPSTONE
CAULKING CAPSTONE-SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0043 6,000 Square
CLEAN STRCTURE 0-16' HIGH
CLEAN STRCTURE 0-16' HIGH-SEE ATTACHED STATEMENT OF WORK.
- All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0044 3,000 Square
CLEAN STRCTURE 16' 1" - 24' HIGH
CLEAN STRCTURE 16' 1" - 24' HIGH-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0045 4,000 Square
Foot
CLEAN STRCTURE ABOVE 24' HIGH
FFP
CLEAN STRCTURE ABOVE 24' HIGH-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0046 3,000 Square
Foot
JOS CLEAN STRCT UP TO 8' HIGH
FFP
JOS CLEAN STRCT UP TO 8' HIGH-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0047 3,000 Square
JOS CLEAN STRCTURE UPTO 8' 1"-16' H
JOS CLEAN STRCTURE UPTO 8' 1"-16' H-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0048 3,000 Square
JOS CLEAN STRCTURE UP TO16'1"-24' H
JOS CLEAN STRCTURE UP TO16'1"-24' H-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0049 4,000 Square
JOS CLEAN STRCTURE ABOVE 24'
JOS CLEAN STRCTURE ABOVE 24'-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0050 500 Square
LIMSTN/CONCRT RPR 1-300 SF
LIMSTN/CONCRT RPR 1-300 SF-SEE ATTACHED STATEMENT OF WORK.
- All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0051 500 Square
LIMSTN/CONCRT RPR OVER 300 SF
LIMSTN/CONCRT RPR OVER 300 SF-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0052 500 Linear
EXTRUDED LEAD TEES 1.5" WIDE
EXTRUDED LEAD TEES 1.5" WIDE-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0053 500 Linear
EXTRUDED LEAD TEES 7/8" WIDE
EXTRUDED LEAD TEES 7/8" WIDE-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0054 500 Square
STNRD BRK MASMRY SINGLE WYTHE
STNRD BRK MASMRY SINGLE WYTHE-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0055 500 Square
Foot
STNRD BRK MASMRY DOUBLE WYTHE
FFP
STNRD BRK MASMRY DOUBLE WYTHE-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0056 200 Square
Foot
RPR ORNATE LIMSTN SURFACE TO 12'
FFP
RPR ORNATE LIMSTN SURFACE TO 12'-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0057 200 Square
Foot
RPR ORNATE LIMSTN SURFACE ABV 12'
FFP
RPR ORNATE LIMSTN SURFACE ABV 12'-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0058 500 Square
Foot
LIMESTONE VENEER 0"-6" THICK
FFP
LIMESTONE VENEER 0"-6" THICK-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0059 500 Square
LIMESTONE VENEER 6"-12" THICK
LIMESTONE VENEER 6"-12" THICK-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0060 200 Square
ORNATE LIMSTN VENEER 0"-6" THICK
ORNATE LIMSTN VENEER 0"-6" THICK-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0061 200 Square
ORNATE LIMSTN VENEER 6"-12" THICK
ORNATE LIMSTN VENEER 6"-12" THICK-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0062 200 Square
CAST IN PLC CNCRT STR TRD 0"-3" THK
CAST IN PLC CNCRT STR TRD 0"-3" THK-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0063 200 Square
CAST IN PLC CNCRT STR TRD 3"-10" THK
CAST IN PLC CNCRT STR TRD 3"-10" THK-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0064 1,100 Linear
CAST IRON ABRSV STAIR NOSE 3" WIDE
CAST IRON ABRSV STAIR NOSE 3" WIDE-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0065 1,000 Square
BRICK 100SF AREA
BRICK 100SF AREA-SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0066 1,000 Square
STUCCO FNSH OVER MASONRY 3 COATS
STUCCO FNSH OVER MASONRY 3 COATS-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0067 1,000 Square
STUCCO FNSH OVER WIRE MESH 3 COATS
STUCCO FNSH OVER WIRE MESH 3 COATS-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0068 10,000 Square
MASONRY SEAL COAT, CLEAR
MASONRY SEAL COAT, CLEAR-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0069 3,000 Square
MASONRY WEATHER SEAL COAT(COLOR)
MASONRY WEATHER SEAL COAT(COLOR)-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0070 2,250 Linear
CAST INPLC CONCRT CAP (UNFORMED)
CAST INPLC CONCRT CAP (UNFORMED)-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0071 3,000 Square
CAST IN PLC CNCRT WALKWY UPTO 5" THK
CAST IN PLC CNCRT WALKWY UPTO 5" THK-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0072 10,000 Square
DEMO EXST CNCRT WALKWY UPTO 6" THK
DEMO EXST CNCRT WALKWY UPTO 6" THK-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0073 500 Linear
RMV WALL MNT HANDRAILS W/POSTS
RMV WALL MNT HANDRAILS W/POSTS-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0074 500 Linear
RMV REINST HANDRAILS W/POSTS
RMV REINST HANDRAILS W/POSTS-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0075 500 Square
INSTL STAMPED CNCRT WALKWY UPTO 5"
INSTL STAMPED CNCRT WALKWY UPTO 5"-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0076 4 Each
CNCRT PLCMNT BY PUMP TRUCK
FFP
CNCRT PLCMNT BY PUMP TRUCK-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0077 5,000 Linear
Foot
REBAR PLACMNT & TYING # 4
FFP
REBAR PLACMNT & TYING # 4-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0078 5,000 Linear
Foot
REBAR PLCMNT & TYING # 6 & # 5
FFP
REBAR PLCMNT & TYING # 6 & # 5-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0079 100 Cubic
Yard
INSTL CRUSHED STONE BASE
INSTL CRUSHED STONE BASE-SEE ATTACHED STATEMENT OF WORK.
- All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0080 100 Cubic
INST # 57 DRAINAGE GRAVEL FILL
INST # 57 DRAINAGE GRAVEL FILL-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0081 230 Cubic Feet
RETAINING WALL RANDOM RUBBLE
FFP
RETAINING WALL RANDOM RUBBLE-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0082 250 Cubic Feet
RETAINING WALL COURSED RUBBLE STN
FFP
RETAINING WALL COURSED RUBBLE STN-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0083 250 Cubic Feet
RETAINING WALL COURSED ASHLAR STN
FFP
RETAINING WALL COURSED ASHLAR STN-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0084 250 Cubic Feet
RETAINING WALL BLOCK 0-16" TALL
FFP
RETAINING WALL BLOCK 0-16" TALL-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0085 100 Cubic Feet
BLU STN STEP TREADS FORKLIFT ASSIST
FFP
BLU STN STEP TREADS FORKLIFT ASSIST-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0086 100 Cubic Feet
BLU STN STEP TREADS CRANE ASSIST
FFP
BLU STN STEP TREADS CRANE ASSIST-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0087 100 Cubic Feet
NEW BLU STN STEP TREAD FRKLFT ASSIST
FFP
NEW BLU STN STEP TREAD FRKLFT ASSIST-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0088 130 Cubic Feet
NEW BLU STN STEP TREAD CRANE ASST
FFP
NEW BLU STN STEP TREAD CRANE ASST-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0089 1,000 Linear
RMV SEALANT VARIOUS SURFACES
RMV SEALANT VARIOUS SURFACES-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0090 1,000 Linear
RMV SEALANT VARIOUS JOINTS
RMV SEALANT VARIOUS JOINTS-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0091 800 Linear
APPLY SEALANT VARIOUS SURFACES
APPLY SEALANT VARIOUS SURFACES-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0092 4,000 Square
TURF RESTORATION & SEEDING
TURF RESTORATION & SEEDING-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0093 1,000 Linear
PVC SCHEDULE 40, 2"
PVC SCHEDULE 40, 2"-SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0094 200 Linear
FAB & INSTL ROUND HANDRAILS
FAB & INSTL ROUND HANDRAILS-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0095 100 Each
CORE DRILL UP TO 2 1/2" WDE BY 8" DEEP
FFP
CORE DRILL UP TO 2 1/2" WDE BY 8" DEEP-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0096 1,000 Linear
RMV & REINST DOWNSPOUTS
RMV & REINST DOWNSPOUTS-SEE ATTACHED STATEMENT OF WORK.
- All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0097 600 Square
SUPLY/INST BLU STN PAVERS
SUPLY/INST BLU STN PAVERS-SEE ATTACHED STATEMENT OF WORK.
- All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0098 400 Each
RMV & REINST LIGHTING PROTECTION
FFP
RMV & REINST LIGHTING PROTECTION-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0099 750 Square
LABOR/EQUIP RMV/DISPSE CNCRT BLOCK
LABOR/EQUIP RMV/DISPSE CNCRT BLOCK UP TO 8'.SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0100 750 Square
LABOR/EQUIP RMV/DISPSE CNCRT BLOCK
LABOR/EQUIP RMV/DISPSE CNCRT BLOCK - 8' - 16' - SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0101 500 Square
LABOR/MATERIAL INSTL CNCRT BLOCK
LABOR/MATERIAL INSTL CNCRT BLOCK - 8" BLOCK UP TO 8'. - SEE
ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0102 500 Square
LABOR/MATERIAL INSTL CNCRT BLOCK
LABOR/MATERIAL INSTL CNCRT BLOCK - 8' - 16' - SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0103 300 Linear
Foot
LABOR/MATERIAL INSTL REINFORCEMNT
FFP
LABOR/MATERIAL INSTL REINFORCEMNT - HORIZONTAL
REINFORCEMENT IN CONCRETE BLOCK WALL - SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
PSC CD: Z1AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0104 100 Linear
Foot
LABOR/EQUIP/MATRL INSTL CURBING
FFP
LABOR/EQUIP/MATRL INSTL 18"X6" CURBING - SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
PURCHASE REQUEST NUMBER: 0011154790-0001
0105 50 Net Ton
(2,000
LB).
LABOR/EQUIP/MTRL INSTL TYP 6F PAVEMENT
LABOR/EQUIP/MTRL INSTL TYP 6F PAVEMENT - SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0106 200 Cubic
LABR/MATRL/EUP/ EXCAV FOOTINGS/WALLS
0106 LABR/MATRL/EUP/ EXCAVATE FOOTINGS/WALLS - 48" MAX - SEE
ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0107 50 Cubic
LABR/EQUPM/RMV ASPHALT AS NEEDED
LABR/EQUPM/RMV ASPHALT AS NEEDED - SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0108 30 Cubic
LBR/EQPM/MTRL FORM/ WALL
LABOR/EQPM/MTRL TO FORMAND POUR 6" CRT WALL UPTO 10' - SEE
ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0109 25 Cubic
LBR/EWPM/MTRL/FORM FOOTING
LABOR/EWPM/MTRL/FORM FOOTING UP TO 24" CRT WALL - SEE
ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0110 200 Cubic
BACKFILL FOOTINGS
LABOR/MATTRL/EQUP/BACKFILL FOOTINGS WITH SOIL - SEE
ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0111 25 Each
REMOVE EXIST STEEL LINTEL AS REQ
FFP
LABOR TO REMOVE EXIST STEEL LINTEL AS REQ SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0112 25 Each
INSTALL STEEL LINTEL
FFP
LABOR/MATRL INSTALL STEEL LINTEL - SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
0113 100 Each
INSTALL MASONRY WEEPS
FFP
MATRL/LBR INSTL WEEPS/BRK/STN/BLK - SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Base Year - September 30, 2019 - September 29,2020 FOB: Destination
1001 75,000 Linear
OPTION RMV JOINTS & CAP
RMV JOINTS & CAP-SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1002 870 Linear
OPTION RMV BLUESTN/SLATE CAP
RMV BLUESTN/SLATE CAPSEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020
- September 29, 2021.
FOB: Destination
1003 420 Linear
OPTION RMV PRECAST/LIMESTN CAP
RMV PRECAST/LIMESTN CAP-SEE ATTACHED STATEMENT OF WORK. -
All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1004 1,200 Square
OPTION CLEAN JOINTS
CLEAN JOINTS-SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1005 2,500 Linear
OPTION INSTALL MORTAR JOINTS FLAT
INSTALL MORTAR JOINTS FLAT-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1006 2,500 Linear
OPTION INSTALL MORTAR JOINTS TOOLED
INSTALL MORTAR JOINTS TOOLED-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1007 150 Linear
OPTION INSTALL COPING STNGOVT/FRNSH STN
INSTALL COPING STNGOVT/FRNSH STN-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1008 150 Linear
OPTION INSTL COPING STN CONTRCTR FRNSH STN
INSTL COPING STN CONTRCTR FRNSH STN-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1009 150 Linear
OPTION INSTL CONCRETE PRECAST/LIMESTN
INSTL CONCRETE PRECAST/LIMESTN-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1010 1,200 Square
OPTION CLEAN STONE AFTER REPOINTING
CLEAN STONE AFTER REPOINTING-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1011 100 Job
OPTION REPLC MISSINT STN TO MATCH AS CLOSE
FFP
REPLC MISSINT STN TO MATCH AS CLOSE-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1012 1,000 Cubic
OPTION REMOVE & REST STONE
REMOVE & REST STONE-SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020
- September 29, 2021.
FOB: Destination
1013 1,000 Each
OPTION INSTALL SS PINS IN CAPSTONE
FFP
INSTALL SS PINS IN CAPSTONE-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1014 900 Linear
OPTION REMOVE CONCRETE CAP
REMOVE CONCRETE CAP-SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020
- September 29, 2021.
FOB: Destination
1015 10 Each
OPTION REMOVE VENEER STONE
FFP
REMOVE VENEER STONE-SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020
- September 29, 2021.
FOB: Destination
1016 10 Each
OPTION REMOVE VENEER STONE
FFP
REMOVE VENEER STONE-SEE ATTACHED STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020
- September 29, 2021.
FOB: Destination
1017 20 Each
OPTION RMV PARPET WALLS CATSTN UP TO 5' LNG
FFP
RMV PARPET WALLS CATSTN UP TO 5' LNG-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1018 500 Linear
OPTION REPNT STRCT WALLS STN UP TO 8' HIGH
REPNT STRCT WALLS STN UP TO 8' HIGH-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1019 500 Linear
OPTION REPNT STRCT WALLS STN UP TO 8'-16' H
REPNT STRCT WALLS STN UP TO 8'-16' H-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1020 500 Linear
OPTION REPNT STRCT WALLS STN UP TO 16'-24'H
REPNT STRCT WALLS STN UP TO 16'-24'H-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1021 500 Linear
OPTION REPNT STRCT WALLS STN UP TO 24' &ABV
REPNT STRCT WALLS STN UP TO 24' &ABV-SEE ATTACHED
STATEMENT OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1022 500 Linear
OPTION REPNT PARPET WALLS STN ROOF SIDE
REPNT PARPET WALLS STN ROOF SIDE-SEE ATTACHED STATEMENT
OF WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1023 500 Linear
OPTION REPNT PENTHS WALLS STN UP TO 10'
REPNT PENTHS WALLS STN UP TO 10'-SEE ATTACHED STATEMENT OF
WORK. - All work will be fully funded and ordered via seperate tasks orders in accordance with the terms and conditions of the contract. - Option Year One - September 30, 2020 - September 29, 2021.
FOB: Destination
1024 500 Linear
Foot
OPTION REPNT PENTHS WALLS STN…