Responses to Request for Information #2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SolicitationAmendment_1.pdf | ||
| Masonry_PWS_SOW_FY19.docx | DOCX document | |
| Solicitation1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011154790-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This solicitation amendment is for responses to Request for Information #2. See attachment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SD19R0147
X 9B. DATED (SEE ITEM 11)
24-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2019
CODE
MICC - WEST POINT
681 HARDEE PLACE
WEST POINT NY 10996-1514
W911SD 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SD19R0147
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been added by full text:
RFI RESPONSES #2
July 17, 2019
Request for Information #2
1. Is the intent of this solicitation to set unit prices for future work, task orders, or to determine reasonableness of pricing for making an award?
Answer: Set unit prices for future task orders.
2. How are costs for access to be handled? The individual unit prices do not indicate the height of work to be performed, which could greatly impact productivity and costs. Without knowing a specific locations constraints, how can we incorporate the proper and competitive costs inclusive of access.
Answer: See Attached excel spread sheet – CLIN descriptions the information per CLIN is for all contract years (base year and option years).
3. Can additional unit price items be provided for access, such as hard scaffolding, swing scaffolding, lifts, etc?
Answer: See Attached excel spread sheet – CLIN descriptions the information per CLIN is for all contract years (base year and option years).
CLINS ClIn Description Clin Description
1 DEMO JOINTS and
CONCRETE CAP
Labor and equipment to remove joints and concrete cap "see section C5.5"
2 REMOVAL OF CAP
STONE
Labor and equipemnt to remove Bluestone/Slate cap "see section C5.5"
3 REMOVAL OF CTE PRE-
CAST & LIMESTONE CAP
Labor and equipemnt to remove pre-cast and Limestone caps "see section C5.5"
4 CLEAN DEBRIS AWAY
FROM JOINTS
Labor and equipment to clean joints "see section C5.6"
5 REPOINT JOINTS, FLAT
JOINTS
Labor, equipment and materials to install mortar joints flat "see section C5.7"
6 REPOINT JOINTS,
TOOLED
Labor, equipment and materials to install mortar joints tooled "see section C5.7"
7 REPLACE COPING STONE
(SLATE)(BLUE STONE)
Labor to Install coping stone with Gov't furnished stone "see section C5.8"
8 REPLACE COPING STONE
(SLATE)(BLUE STONE)
Labor and material to Install coping stone with Contractor furnished stone "see section C5.8"
9 REPLACE CONCRETE
PRECAST & LIMESTONE
COP
Labor and material to install concrete pre-cast / limestone cap"see section C5.11"
10 CLEAN AFTER
REPOINTING
Material and equiment to clean stone after repointing "see section C5.9"
11 STONE MASONRY
REPLACEMENT AS
NEEDED
Material and labor to replace missing stone. Match as close as possible
12 RESETTING OF LOOSE
STONES
Labor, material and equipment to remove and rest stone as required
13 CAP STONE PINNING material and labor to install SS pins in capstone "see section C5.8"
14 DEMO CONCRETE CAP Labor and equipemnt to remove concrete cap
15 REMOVE VENEER STONE see section C.5.12 16 REMOVE VENEER STONE See section C.5.12
17 REMOVE PARAPET
WALL CAPSTONE UP TO
5' long see section C.5.12.3
18 REPOINT STRUCT WALLS
STONE UP TO 8' HIGH
see section C.5.12.3
19 REPOINT STRUCTURE
WALLS STONE 8' - 16'
see section C.5.12.3
20 REPOINT STRUCTURE
WALLS STONE 16' to 24' see section C.5.12.3
21 REPOINT STRUCTURE
WALLS STONE 24' and
ABOVE
see section C.5.12.3
22 REPOINT PARAPET
WALLS STONE ROOF
SIDE
see section C.5.12.3
23 REPOINT PENTHOUSE
WALLS STONE UP TO 10'
see section C.5.12.3
24 REPOINT PENTHOUSE
WALLS STONE 10' and
ABOVE
see section C.5.12.3
25 REPOINT STRUCTURE
WALLS BRICK UP TO 8'
see section C.5.12.3
26 REPOINT STRUCT WALLS
BRICK FROM 8' to 16' see section C.5.12.3
27 REPOINT STRUCT WALLS
BRICK 16' to 24' see section C.5.12.3
28 REPOINT STRUCTURE
WALLS BRICK 24' and
ABOVE
see section C.5.12.3
29 REPOINT PARAPET
WALLS BRICK ROOF SIDE
see section C.5.12.3
30 REPOINT PENTHOUSE
WALLS BRICK UP TO 10'
see section C.5.12.3
31 REPOINT PENTHOUSE
WALLS BRICK 10' and
ABOVE
see section C.5.12.3
32 RESETTING VENEER
STONE UP to 8' HIGH see section C.5.8.12
33 RESETTING VENEER
STONE 8' to 16' HIGH see section C.5.8.12
34 RESETTING VENEER
STONE 16' to 24' HIGH see section C.5.8.12
35 RESETTING VENEER
STONE 24' AND ABOVE
see section C.5.8.12
36 RESETTING VENEER
STONE WALLS ROOF
SIDE
see section C.5.8.12
37 RESETTING VENEER
STONE PENT WALLS -
10' see section C.5.8.12
38 RESETTING VENEER
STONE PENT WALLS 10'
AND ABOVE
see section C.5.8.12
39 REPLACE THROUGH
WALL FLASHING
see section C.5.13
40 REPLACE PARAPET WALL
FLASHING
see section C.5.13
41 REPLACE VENEER WALL
TIES/ANCHORS
See section C. 5.13
42 CAULKING CAPSTONE All Labor and material See section C.5.11.6
43 CLEANING OF
STRUCTURE 0 - 16' HIGH
See section 5.9 Cleaning of façade.
Cleaning is with Medium/high Pressure water to include the use of light brushingand/or mild detergent.
Pressure not to exceed 1000PSI
44 CLEANING OF
STRUCTURE 16' 24'
HIGH
See section 5.9 Cleaning of façade.
Cleaning is with Medium/high Pressure water to include the use of light brushingand/or mild detergent.
Pressure not to exceed 1000PSI
45 CLEANING OF
STRUCTURE ABOVE 24'
HIGH
See section 5.9 Cleaning of façade.
Cleaning is with Medium/high Pressure water to include the use of light brushingand/or mild detergent.
Pressure not to exceed 1000PSI
46 JOS CLEANING OF
STRUCTURE UP TO 8'
HIGH
See section 5.9 Cleaning of façade.
Cleaning is with Low Pressuremicro abrasive cleaning technology for sensitive restoration of Facades and monuments. Similare to the JOS & TORC cleaning system
47 JOS CLEANING OF
STRUCTURE 8' TO 16'
HIGH
See section 5.9 Cleaning of façade.
Cleaning is with Low Pressuremicro abrasive cleaning technology for sensitive restoration of Facades and monuments. Similare to the JOS & TORC cleaning system
48 JOS CLEANING OF
STRUCTURE 16' TO 24'
HIGH
See section 5.9 Cleaning of façade.
Cleaning is with Low Pressuremicro abrasive cleaning technology for sensitive restoration of Facades and monuments. Similare to the JOS & TORC cleaning system
49 JOS CLEANING OF
STRUCTURE ABOVE 24'
HIGH
See section 5.9 Cleaning of façade.
Cleaning is with Low Pressuremicro abrasive cleaning technology for sensitive restoration of Facades and monuments. Similare to the JOS & TORC cleaning system
50 LIMESTONE/Granite
REPAIR, 1-300 SF
Repair Limestone and Granite using Dutchmam
51 LIMESTONE/Granite
REPAIR, OVER 300 SF
Repair Limestone and Granite using Dutchmam
52 EXTRUDED LEAD TEES
1.5" WIDE
See section C. 5.13
53 EXTRUDED LEAD TEES
7/8" WIDE
See section C.5.13
54 STANDARD BRICK
MASONRY SINGLE
WYTHE
Furnish and Install single wythe brick
55 STANDARD BRICK
MASONRY DOUBLE
WYTHE
Furnish and Insatll double wythe brick
56 REPAIR ORNATE
LIMESTONE SURFACE
TO 12'
Using JAHN mortar to repair limestone
57 Repair ORNATE
LIMESTONE SURFACE
TO above 12'
Using JAHN mortar to repair limestone
58 LIMESTONE VENEEER 0"
to 6" THICK
Furnish and Install Limestone veneer
59 LIMESTONE VENEER 6'
to 12" THICK
Furnish and Install Limestone veneer
60 ORNATE LIMESTONE
VENEER 0" - 6" THICK
Furnish and Install ornate limestone
61 ORNATE LIMESTONE
VENEER 6" - 12" THICK
Furnish and Install ornate limestone
62 CAST IN PLACE
CONCRETE STAIR TREAD
0" - 3" THICK
Labor Materials and equipment to form, place and finish concrete stairs.
63 CAST IN PLACE
CONCRETE STAIR TREAD
3" - 10" THICK
Labor Materials and equipment to form, place and finish concrete stairs.
64 CAST IRON ABRASIVE
STAIR NOSE 3" WIDE
See section C5.15.1
65 BRICK 100 SF AREA Labor, materials and equipment demo, Furnish and Install
66 STUCCO FINISH OVER
MASONRY 3 COATS
SEE SECTION C.5.11.11
67 STUCCO FINISH OVER
WIRE MESH 3 COATS
see section C.5.11.11
68 MASONRY SEAL COAT, CLEAR
69 MASONRY WEATHER
SEAL COAT (COLOR)
sees ection C.5.14
70 CAST IN PLACE CTE CAP
(UNFORMED)
See Section C.5.11.3.1
71 CAST IN PLACE
CONCRETE WALKWAY
UP TO 5" THICK
see section C.7
72 DEMO EXISTING
CONCRETE WALKWAY
UP TO 6" THICK
See section C.7
73 Remove wall mounted handrails/Reinstall
Labor, materials & equipment to remove handrails and Labor, materials & equipment to reinstall and paint as required steel wall mounted handrails
74 remove/reinstall handrails with posts
Labor, materials & equipment to remove & salvage steel handrails with posts from stone or concrete./Labor, materials & equipment to reinstall and paint as required steel handrails with Posts
75 Install stamped concrete walkway up to 5
Labor, materials and equipment to install stamped concrete pattern/color into concrete (in conjunction with CLIN 71). Three stamped patterns include brick, cobblestone, bluestone.
76 Concrete placement by pump truck
Labor, materials and equipment to place concrete via concrete pump truck when direct-chute off the truck concrete placement is not possible
77 Rebar placement &
tying - #4
Labor, materials & equipment to install #4 rebar for concrete reinforcement.
78 Rebar placement &
tying - #6, #5
Labor, materials & equipment to install #6 rebar for concrete reinforcement
79 Install crushed stone base
Labor, materials & equipment to install and compact crushed stone base
80 Install #57 drainage gravel fill
Labor, materials & equipment to install and compact 12” wide gravel fill with drainage fabric along foundation or retaining wall.
81 Retaining wall random rubble
Labor, materials & equipment to dismantle, salvage and reconstruct large area of retaining/landscape wall with existing random rubble stone 0- 10’ from ground
82 Retaining Wall coursed rubble stone
Labor, materials & equipment to dismantle, salvage and reconstruct large area of retaining/landscape wall with existing coursed rubble stone 0- 10’ from ground.
83 Retaining Wall coursed ashlar stone
Labor, materials & equipment to dismantle, salvage and reconstruct large area of retaining/landscape wall with existing coursed ashlar stone 0-10’ from ground
84 retianing wall block 0- 16"
Labor, materials & equipment to supply and install manufactured concrete block stone wall 0-16’ tall
85 Bluestone step treads forklift assist
Labor, materials & equipment to remove existing bluestone stair treads and relay with assistance of forklift
86 Bluestone step treads crane assist
Labor, materials & equipment to remove existing bluestone stair treads and relay with assistance of a crane when a forklift cannot be used.
87 NEW Bluestone step tread forklift assist
Labor, materials & equipment to remove existing bluestone stair treads and replace with new matching bluestone with assistance of forklift.
88 NEW Bluestone Step tread crane assisted
Labor, materials & equipment to remove existing bluestone stair treads and replace with new matching bluestone with assistance of a crane when a forklift cannot be used
89 Remove sealant various surfaces
Labor, materials & equipment to remove sealant and prepare joint for new sealant in stone to stone, brick to stone and brick to brick joints.
90 Remove sealant various joints
Labor, materials & equipment to remove sealant and prepare joint for new sealant in masonry to wood or masonry to metal joints.
91 Apply sealant various surfaces
Labor, materials & equipment to apply sealant to prepared joint in masonry or masonry to metal or wood. Sealant shall be single component polyurethane
92 Turf restoration and seeding
Labor, materials & equipment to grade turf to remove ruts, add topsoil and seed disturbed turf to restore turf after work activities.
93 PVC Schedule 40 2" conduit
Labor, materials & equipment to install up to 2” diameter conduit for future installation of wire or fixtures by others
94 Fab & Install 2" round handrail
Labor, materials & equipment to fabricate and install 2" dia. Schedule 40 railing. Galvanize finish assumed
95 Core drill up to 2 1/2" wide by 8" deep
Labor, materials & equipment to core drill concrete pavement to receive railing posts.
96 Remove and reinstall downspout
Labor, materials & equipment to remove existing downspout at exterior of buildings in order to faciliatat repairs at building, and reinstall downspout once repairs on building are complete
97 Supply and install bluestone pavers
Labor, materials & equipment to furnish and install 1 1/2" thick bluestone pavers.
98 Remove and reinstall lightning protectio
Labor, materials & equipment to remove existing lightning protection at exterior of buildings in order to faciliatat repairs at building, and reinstall lightning protection once repairs on building are complete.
99 Demo Concrete Block up to 8'
Labor and equipment to remove and dispose of concrete block
100 Demo Concrete Block 8'- 16'
Labor and equipment to remove and dispose of concrete block
101 Install 8" concrete block up to 8'
Labor and material to install concrete block
102 Install concrete block 8'- 16'
Labor and material to install concrete block
103 Install horizontal reinforcemnt in concrete block wall
Labor and material to install reinforcement.
104 install curbing Labor, equipment and material to install 18" x 6" curbing
105 asphalt patching Labor, equipment and material to install type 6F pavement
106 excvation for footing/wall
Labor, Material and equipment to excavate for footings and walls. 48" max
107 Asphalt Pavement Removal
Labor and equipment to remove asphalt as needed
108 Form and pour 6" concrete wall up to 10'
Labor, equipment and materials to form amd place 6" concrete wall section
109 Form and Pour footing up to 24" wide
Labor, equipment and materials to form and place 24" concrete footing
110 Backfill footings and walls with soil
Labor, material and equipment to backfill footing and wall after forms removed
111 remove steel lintel Laborto remove existing steel lintel as required.
112 Install steel lintel Labor and material to install steel lintel 113 Install masonry weeps Material and labor to install weeps in brick, stone and block
(End of Summary of Changes)