PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Performance Objective (from PWS Section 5)
Performance Standard Acceptable Quality Level Method of Surveillance
PWS Para. 5.3: Accident Prevention Plan/Site Safety and Health Plan
Professional writing, editing, proofreading, and on schedule. Reports and plans meet the standards of the PWS and applicable regulations.
Plan is timely, consistent with OSHA and Army safety standards.
100% Inspection, COR review of reports in terms of contract requirements.
PWS Para. 5.10: Project Management Plan
Professional writing, editing, proofreading, and on schedule. Reports and plans meet the standards of the PWS and applicable regulations.
Plan is timely, describes all aspects of project
100% Inspection, COR review of reports in terms of contract requirements.
PWS Para. 5.11: Work Plans Professional writing, editing, proofreading, and on schedule. Reports and plans meet the standards of the PWS and applicable regulations.
Army approval through the COR and Regulator concurrence (e.g., receipt of documentation confirming approval) of final plan/report
100% Inspection, COR review of reports in terms of contract requirements.
PWS Para. 5.12: Site Closure Plan/Investigation Report
Professional writing, editing, proofreading, and on schedule. Reports and plans meet the standards of the PWS and applicable regulations.
Army approval through the COR and Regulator concurrence (e.g., receipt of documentation confirming approval) of final plan/report
100% Inspection, COR review of reports in terms of contract requirements.
Field Work Completion COR acceptance of field records, status reports, data submittals.
Number of safety deficiencies or incidents.
Field work completed without safety incidents. Work coordinated to minimize disruption of West Point operations.
100% inspection. COR review of reports in terms of contract requirements.