About this file

This is a Request for Quotes (RFQ) solicitation issued by the Department of the Army MICC Fort McCoy for Facility Coordinator and Site Commander Course Training services for the 63rd Readiness Division. The solicitation (W911SA25Q3029) is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 611430 with a size standard of $15 million.

The contract requires providing training courses at six Army Reserve Facilities across Arizona, Arkansas, California, and Texas. The period of performance includes a 12-month base period (February 2025 - January 2026) with four 12-month option periods. The contractor must conduct seven 3-day Facility Coordinator Courses per year in a classroom setting with up to 25 students per course, as well as develop and maintain an online Site Commander Course. Key requirements include modifying existing training materials, providing course instruction and materials, conducting pre/post-tests, issuing certificates of completion, and maintaining a computerized learning management system. Quotes are due by 12:00 PM Central Time on January 10, 2025, and a phase-in period of one month is included. The solicitation includes plug values for travel costs ranging from $13,300 in the base year to $15,559.12 in option year 4.

View the file

Other files for this federal contract opportunity

Other files attached to Facility Coordinator and Site Commander Course Training for the 63rd RD, newest first.
File Type Posted
W911SA25Q3029 - Amendment 1 - Vendor Questions and Answers.pdf PDF
W911SA25Q3029 Attachment 1 - Price Schedule - CUI.xlsx XLSX spreadsheet
W911SA25Q3029 Attachment 2 - ATOPSEC.pdf PDF
W911SA25Q3029 Attachment 3 - Travel Request Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911SA25Q3029 23-Dec-2024

b. TELEPHONE NUMBER

502-898-2527

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 10 Jan 2025

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911SA9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

CHRISTOPHER BROWN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0012152303-0002

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

W6QM MICC FT MCCOY (RC)

KO DIRECTORATE OF CONTRACTIN

BLDG 1108 SOUTH R STREET

FORT MCCOY WI 54656-5142

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

X 8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$15,000,000

NAICS:

611430

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF82

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911SA25Q3029

Section SF 1449 - CONTINUATION SHEET

SUPPLEMENTAL INFORMATION

1. An Award for this requirement will be made pursuant to FAR 13.5, Simplified Procedures for Certain Commercial Items

2. The period of performance is anticipated to be 1 February 2025 to 31 January 2026 (or subsequent date), with four (4) one (1) year options periods.

3. Quotes shall be emailed to Solicitation POC: Christopher Brown; christopher.m.brown67.civ@army.mil.

Quotes are due to the Government on or before the date/time listed on the solicitation in central time. It is the contractor’s responsibility to ensure their quote is received by the due date and time. As an Addendum to FAR 52.212-1, contractor shall submit all items in accordance with the Supplemental Information by the solicitation closing date and time. The contractor SHALL provide all required documents with submission of quotes.

Signed SF 1449 Completed information from the Supplemental Information section of the solicitation Completed Price Schedule Attachment Signed Amendments (if applicable)

If all required documents are not provided with the quote submission, your quote MAY NOT be considered for award.

4. If a quote is based on a teaming/partnering relationship or a joint venture, the contractor shall provide, with the quote, all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.

5. This procurement is Set Aside as 100% Service-Disabled Veteran Owned Small Business (SDVOSB) NAICS Code 611430 with a size standard of $15.0 Million.

6. Period for acceptance of quotes. The contractor agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes

7. Site visit: There will be no site visits held for this requirement.

8. Written questions must be furnished to the Government no later 10:00 AM on January 3, 2025 in order to ensure a timely response is provided by the solicitation closing date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, contractors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions. The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government’s response.

9. SAM Unique Entity ID: ______________________________.

10. TAXPAYER ID #______________________________.

11. CAGE CODE __________________________________.

12. SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.

a. A SAM Unique Entity ID is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.

b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 611430, or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.

c. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 611430, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered contractor.

d. Within the SAM Representations and Certifications, please ensure you company has selected that you wish to bid on, or currently hold Department of Defense (DoD) issued or DoD funded Contracts. The DFARS provisions in SAM must also be completed by solicitation closing date and time.

e. Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the System for Award Management (SAM) database, shall complete and submit FAR 52.212-3 Alternative 1 Offeror Representations and Certifications - Commercial Items and DFARS Representations and Certifications in SAM to be eligible to receive an award for this solicitation.

13. Contract Administrator: TBD at time of award.

If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the Contract Administrator. Be sure to include the contract number in your request for assistance. Requesting contract administration assistance from any other individual could result in a delayed response.

14. Contracting Officer: TBD at time of award.

15. Contracting Officer’s Representative (COR): TBD at the time of Award.

16. The Government intends to evaluate quotes and award a contract without discussions. Therefore, the contractor’s initial offer should contain the contractor’s best terms from a price and technical standpoint.

However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest and waive informalities and minor irregularities in quotes received.

17. Service Contract Reporting (SCR): Contractors will report manpower data relating to the performance of service contracts into the system for Award Management (SAM) (https://sam.gov) consistent with existing service contract reporting requirement under the federal acquisition regulation subpart 4.17- Service Contracts Inventory. SAM will only enable reporting for entities with contract that meet the SCR threshold at FAR 4.1703. As part of its quote, the vendor must include the estimated total cost (if any) incurred to comply with the Service Contract Reporting requirement.

18. Post Award Conference: In the event the Contracting Officer decides to conduct a Post Award Conference in accordance with DFARS 242.5, the awardee will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

19. ABILITYONE DESIGNATED ITEMS: In accordance with 52.208-9, contractors are referred to the web site of the Committee for Purchase from People Who Are Blind or Severely Disabled, the independent federal agency that administers the AbilityOne (formerly Javits-Wagner-O'Day or JWOD) Program for the lists of designated products and services http://abilityone.gov/procurement_list/product_buy.html

20. In accordance with FAR 52.223-2, Affirmative Procurement of Bio-based Products under Services and Construction Contracts, contractors are required to submit annual bio-based reports to the reporting module in the System for Award Management (SAM) at https://www.sam.gov.

21. The “Equal Employment Opportunity Is The Law” notice (poster) referenced in FAR Clause 52.222-

26(b)(3), is located at http://www.dol.gov/ofccp/regs/compliance/posters/pdf/eeopost.pdf .

22. In accordance with FAR Clause 52.222-41(g), the contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract, or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite. The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.

23. In accordance with FAR 52.222-42, In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5 332.

This Statement is for Information Only. It is not a Wage Determination.

Employee Class Monetary Wage -- Fringe Benefits Instructor GS-1701-09

24. Required insurance:

The contractor shall provide, within ten (10) calendar days after contract award. The Contractor shall provide the Certificate of Insurance (COI) via email to the Post Award Contracting Officer and Post Award Contract Specialist. The COI shall be updated and sent to the Post Award Team on an annual basis.

In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.

Workmen’s Compensation As required by state laws

Employer’s Liability Insurance $100,000 per accident General Liability Insurance - Bodily Injury Liability $500,000 per occurrence

Auto Liability Insurance $200,000 per person

Bodily Injury $500,000 per occurrence

Property Damage $20,000 per occurrence Contractor shall require the insurance company to specify contract number in the Description of Operation block of the Certificate of Insurance (COI) and the below statement.

"The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective- (1) For such period as the laws of the State in which this contract is to be performed prescribe; or (2) Until 30 days after the Insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer."

25. Legal compliance: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.

26. Contract performance:

Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor’s actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection. The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.

Contractor Performance Assessment Reports System (CPARS): CPARS shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an “interim” assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or “addendum” report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout. Additionally, addendum reports may be prepared to record contractor’s performance relative to contract closeout and other administrative requirements (e.g.

final indirect cost proposals, technical data, etc.).

Completion Due Date. The government will complete the CPARS within 60 days after the end of the assessment rating period (if applicable).

Evaluators. The Contracting Officer and the Contracting Officer’s Representative will jointly complete the performance assessment.

Contracts Performance Elements. The contractor’s performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.

Contractor Review. The Contracting Officer will furnish a copy of the CPARS to the contractor requesting that the contractor submit comments, rebutting statements, and/or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.

Contract Concurrence. Where a contractor concurs with, or takes no exception to a CPARS, such report shall be considered final and releasable for use in source selection and other deliberative purposes.

Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor’s rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor’s comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor’s rebuttal or comments shall be made part of the CPARS.

Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the CPARS occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the CPARS is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer’s Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final. Copies of the CPARS and the contractor’s response and review comments, if any, shall be retained as part of the evaluation.

Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).

Source Selection Information. Departments and agencies will electronically access the CPARS information to support future award decisions.

27. Alternate disputes resolution: In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subparagraph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.

PWS

PERFORMANCE WORK STATEMENT (PWS)

Facility Coordinator/Site Commander Course November 25, 2024

Part 1 General Information

1. General: This is a non-personal services contract to provide Facility Coordinator and Site Commander training as defined in this Performance Work Statement (PWS) for the 63rd Readiness Division (RD).

1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide Facility Coordinator and Site Commander Training.

1.2 Background: The 63d RD is a geographically aligned and dispersed organization, building readiness by providing seamless, efficient, and continual Base Operations (BASOPS) services primarily to Army Reserve Soldiers, Civilians, Family members and units operating in the 63d RD region. This region, which covers seven states stretching from California to Arkansas, across the western lower tier of the continental United States, includes over 200 individual sites with approximately over 9 million square feet of building area. The 63d RD is headquartered in Mountain View, CA. The United States Army Reserve Command requires that Army and Armed Forces Reserve Centers are operated, managed, and maintained in accordance with applicable regulations and that they support the requirements of the commander to train for and succeed in wartime environments. To accomplish this, the 63d RD requires contractor training support to educate current and new Facility Coordinators throughout its Area of Operations (AO) on adherence to facility management procedures detailed in AR 140-483 and the 63d RD

PAM 420-1.

1.3 Scope: The Contractor shall provide non-personal service(s). The Contractor shall provide Training Support Services for the 63rd RD areas of responsibility (AOR). The Contractor shall have a minimum of five years of experience conducting and facilitating Facility Coordinator/Site Commander Training Courses at an Army Reserve Division/ MSC level. The Contractor shall have the capability to update and maintain the existing training materials furnished by the government and make any Contracting Officer’s Representative (COR) approved modification to the training materials in order to perform the work described herein. The contractor shall comply with applicable federal, state, and local laws, regulations, and guidance; and perform all work in accordance with these requirements and any applicable agreements. All work performed by the contractor under this firm fixed price (FFP) contract will be accomplished in a manner that conforms to this Technical PWS.

1.4 Period of Performance: The period of performance shall be for one Base Period of twelve months (includes 1 month for phase in), four twelve-month option periods and a potential six month option to extend services.

1.5 Phase In Plan: To minimize any decreases in productivity and to prevent possible negative impact on additional services, the Contractor shall have all key personnel on board, during the phase in period. During the phase-in period, the Contractor shall become familiar with performance requirements, in order to commence full performance of services on the start of the base period of performance. The Contractor’s Phase-In Plan shall include comprehensive procedures for attaining full PWS performance within the time allowed herein. The Contractor shall submit the Phase-In Plan, and identify associated costs, as part of their proposal. The Phase-In Plan shall establish procedures by which the Contractor shall prepare and assume full responsibility for all areas outlined in the PWS.

The Contractor shall be ready to start phase-in at the contractual base year period of performance (POP) start date.

The Phase-In Plan shall be submitted with the initial proposal and shall include, at a minimum, procedures to recruit and hire necessary Contractor personnel, accomplish completion of all necessary training requirements of Contractor personnel, develop and submit all required deliverables.

1.4 Objectives: The objective of this contract is for the contractor to provide necessary training in a manner that will educate the Facility Coordinators, Site Commanders, and Site Support Staff to effectively manage their facilities in adherence with the 63d RD and Army Reserve regulations and policies.

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The Contractor shall provide and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall provide and adapt procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within 15 calendar days after date of contract award.

The Government COR will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the contractor. If the Government COR has provided comments, the Contractor shall then have 14 calendar days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than ten calendar days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;

(b) How the Contractor shall monitor work to ensure performance complies with all deliverables (etc.

timelines, deadlines, and goals);

(c) How the Contractor shall monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;

(d) How the Contractor shall monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;

(e) How the Contractor shall inventory and track maintenance of all Government Provided Equipment / Materials;

(f) How the Contractor shall identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and

(g) How the Contractor shall file and save all Quality Control related documents for the life of the contract plus 5 years.

1.5.2 Quality Assurance: The Government COR will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.2.1 Contractual Nonconforming Performance: CARs formerly Nonconformance Reports (NCR) are used for managing contractual nonconformances on ACC administered contracts. Nonconformance occurs when a contractor fails to meet contract requirements or specifications. The COR will verbally notify the contractor and document in Product Data Reporting and Evaluation Program (PDREP) each time nonconforming service or supplies have been identified and request the contractor to correct the defect to conform with contract requirements. Resolution of nonconformance identified at the subcontractor level shall be addressed with the prime contractor. CARs are issued, processed, and closed IAW

ACC Acquisition Instruction (AI) 46-2 and FAR subpart 46.407 (nonconforming supplies or services).

Level I: A Level I CAR describes a deficiency on a product or service and is not a systemic breakdown of a process or system. It includes those nonconformances that are minor in nature and can be promptly corrected by the contractor, present no need for root cause analysis, no determination if other contract requirements are affected, present no need for further preventive action, and do not materially reduce the usability of the supplies, services, construction, or deliverables. While the Government COR must document the nonconformance and the contractor must correct the nonconformance, further actions and Government COR follow-up are not required, and no written response from the contractor is needed. Level I CARs are considered closed immediately upon issuance.

Level II: A Level II CAR describes deficiencies in a contractor’s processes or systems but are not significant deficiencies. Level II CARs shall require the contractor to correct the nonconformance, perform root cause, and develop and provide a Corrective Action Plan (CAP) acceptable to the government COR. Some examples of systems affected may be quality inspection/management systems, and CBS identified in DFARS 242.70, or issues such as:

Multiple deficiencies on products or services indicating a systemic issue throughout the process, or, An escalation of repetitive Level I CARs for the same or similar nonconformance demonstrating the contractor is failing to institute effective corrective action and/or failing to implement effective quality and/or internal control(s).

Level III: A Level III CAR describes deficiencies in a contractor’s system that is affecting a contracts or program’s ability to meet cost, schedule, or performance requirements, or are:

A significant deficiency pursuant to DFARS 252.242-7005(b), “Contractor Business Systems” (CBS), or, A failure to respond to Level II CARs, or to remedy a recurring nonconformance.

The contractor shall be required to provide a CAP that is acceptable to the government COR.

Level IV: A Level IV CAR documents a critical nonconformance of such serious nature that is issued to the contractor’s business segment or corporate management for their attention to both the nonconforming condition and the company’s corrective action, or when a Level III CAR has been ineffective. A Level IV CAR will result in a mandatory review of available contractual remedies, such as cost disallowance, reduction or suspension of payments, revocation of government COR assumption of risk of loss, CBS disapproval, or suspension of all product and service acceptance activities. Contractual remedies will be implemented IAW applicable FAR/DFARS clauses and/or ACC Acquisition Instructions if applicable. Action to suspend product or service acceptance will be accomplished via a Level IV CAR. The contractor shall be required to provide a CAP that is acceptable to the government COR.

Overarching CAR Process Flow. The following outlines the normal process flow for the corrective action process.

Follow the steps provided within PDREP CAR Module User Guide.

NOTE: Steps in subparagraphs (f)-(j) below do not apply to Level I CARs as they are considered closed immediately upon issuance.

a. Identify a contract nonconformance.

b. Create a CAR.

c. Review the CAR.

d. Coordinate and approve the CAR.

e. Issue the CAR to the contractor.

f. Receive and review the contractor’s CAP.

g. Accept/reject the contractor’s CAP.

h. Oversee contractor corrective action using a risk-based approach.

i. Receive notification from the contractor that corrective action is accomplished.

j. Verify corrective action was accomplished satisfactorily.

k. Close the CAR.

1.5.3 Recognized Holicalendar days: The following provides information on recognized holicalendar days for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holicalendar days: Work shall not be performed on U.S. federally recognized holicalendar days occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st

M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May

Juneteenth June 19th

Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October

Veteran’s Day November 11th

Thanksgiving Day 4th Thursday in Nov Christmas Day December 25th

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Operating Hours: The Government facility office hours are 8:00 am to 4:00 pm (0800 to 1600) Monday through Friday, local time, except U.S. Holicalendar days identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.5.4.2 Contractor Support Hours: The Contractor shall provide training during Government Facility operating hours. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.

1.5.6 Place of Performance: The work under this contract will be performed within each region of the 63d Readiness Division AOR in California, Arizona, Nevada, New Mexico, Texas, Oklahoma, and/or Arkansas.

1.6 Security Requirements: The following information is provided on security related matters.

The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each day, government facilities, equipment, and materials shall be secured. The contractor shall comply with all facility-specific security plans and procedures, as applicable.

1.6.1 Installation Access: Follow all current Army Security Regulations concerning strict visitor control and preservation of all Government assets. Immediately report all security concerns to the Contracting Officer, who will notify the Security Office.

The Contractor shall adhere to requirements as directed in Federal Acquisition Regulation – 52.222-54; Employment Eligibility Verification. Contractors shall be enrolled in the Department of Homeland Security E-Verify Program.

Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: http://www.dhs.gov/E-Verify.

The Contractor shall ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.

The Contractor shall return within two calendar days all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a Contractor employee no longer requires access to the installation or facility.

The Contractor shall comply with all personnel identity verification procedures. Employees must be accompanied by an authorized Government employee at all times while providing services in secure areas.

During Force Protection Conditions (FPCON) Charlie and Delta, services are discontinued and services shall resume when the FPCON level is reduced to level Bravo or lower.

1.6.2 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 30 calendar days.

1.6.2.1 Common Access Cards (CAC) and CAC Log: For contractors requiring Common Access Card (CAC).

Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05.

The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoDapproved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government COR), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.6.3 Background Checks: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government COR may require changes in contractor security matters or processes.

1.7 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government COR views the Contractor's performance and the Contractor shall apprise the Government COR of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.7.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government COR to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government COR. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

1.8 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work.

The COR is authorized to perform the following functions: assure that the Contractor. performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.9 Key Personnel: The following personnel are considered key personnel by the Government: Designated POC and an alternate POC. The Contractor shall provide a designated POC who shall be responsible for the competent performance of the work required under the specifications of this contract, and an alternate, who shall act for the contractor when the POC is absent. The alternate POC shall meet or exceed the qualifications of the original designee and this PWS. The Contractor shall have the POC available on the phase-in start date and throughout the term of the contract. The name and contact information of the POC and an alternate POC shall be designated in writing to the COR NLT 5 calendar days after contract award and as changes occur. The POC or alternate POC shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The POC or alternate POC shall be available between 7:30 a.m. to 4:00 p.m. local time Monday thru Friday except Federal holicalendar days or when the government facility is closed for administrative reasons. The POC and alternate POCs shall be able to read, write, speak, and understand English.

1.9.1 Dress Code: Contractor and subcontractor employees shall dress appropriately in business attire of a casual nature when attending meetings and performing services at Government facilities.

1.10 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12 Contractor Travel Requirements: Government COR approved travel will be cost reimbursable. The COR will provide the Contractor notification of travel requirements no later than 30 Government calendar days (GBD) before travel start date. The Contractor shall submit all reimbursable travel requests and supporting documents to include estimates to the COR for approval prior to beginning travel. Supporting documentation includes, but not limited to flight reservations, hotel booking, rental car reservation, Google map print out of mileage and class pricing (if applicable). All travel requests will be processed through email to the COR for approval. In the event the COR is unavailable the Contractor shall contact the Contracting Officer for instructions. The Contractor shall have a system in place allowing Contractor employees to travel efficiently, effectively and free from any delay due to funding of travel, lodging or per diem. The Contractor shall follow the applicable guidance contained in FAR 31.205-46. The Contractor may be authorized travel expenses at rates no higher than the substantive provisions of the Joint Travel Regulation (JTR), IAW FAR Part 31.205-46, and the limitation of funds specified in this contract.

The Contractor shall make every attempt to fully utilize rental vehicles (maximum capacity), hotel accommodations and shall not permit Contractor employees to utilize personally owned vehicles as a mode of transportation unless advantageous to the Government and approved by the COR prior to the start of travel. Upon travel completion the Contractor shall provide receipts for airfare, lodging, rental car, baggage, mileage, fuel and any non-per diem related expense with a copy of the approved travel request to the COR for review and approval prior to invoicing. In addition to the travel voucher, the Contractor will submit an estimated vs. actual statement. The statement will clarify any disparity between authorized and actual expenses claimed. Any questions or clarifications needed reguarding travel shall be addressed to the COR. All travel requires Government COR approval and authorization prior to scheduled travel.

1.13 Data Rights: The Government COR has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government COR shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.14 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

1.15 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/, the

Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.16 Non-Disclosure Statements: The Contractor shall provide signed non-disclosure agreements to the Government COR no later than (30) calendar days prior to commencement of work under the contract. Disclosure of information by Contractor personnel may result in removal of Contractor personnel from performance under this contract.

1.17 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.18 Safety: The Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.

1.19 Required Training: The following provides information on training requirements.

1.19.1 Anti-Terrorism (AT) Level I Training: Contractor shall complete the Anti-Terrorism (AT) Level I Training within 30 calendar days of contract award. If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within five calendar days after completion of the training.

1.19.2 OPSEC Training: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 30 calendar days of employment under this contract.

Verification of the training shall be provided to the COR within five calendar days after completion of the training.

OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months. Verification of the training shall be provided to the COR within five calendar days after completion of the training.

1.19.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the…