W911SA24Q3078 SN KS032 Multi Site Performance Checklist.xlsx

XLSX spreadsheet 2 MB Posted

Attached to
Snow Removal Services at KS032 - Topeka, Kansas
Solicitation number
W911SA-24-Q-3078
Issued by

About this file

This document contains a contractor performance inspection checklist and summary report for snow removal services at multiple Army Reserve facilities locations in Kansas. The inspection checklist evaluates contractor adherence to 30 performance standards across 8 categories of snow removal tasks, including plowing, salting, and cleanup. Performance is rated as satisfactory or unsatisfactory at each location for each standard, with an overall compliance rate of 100% found for all contractors and locations based on a periodic inspection conducted between October-September.

The related federal contract opportunity notice is for snow removal services at one Army Reserve facility location in Topeka, Kansas, with a performance period from March 2024 to October 2024 and four 12-month option periods. Quotes are due by the date and time listed on the solicitation to be issued on February 20, 2024 via SAM.gov. The contractor must provide all required documents including a signed SF1449 and price schedule with their quote submission. Written questions about the solicitation are due by February 23, 2024.

View the file

Other files

File Type Posted
Attachment 1 - Price Schedule.xlsx XLSX spreadsheet
Attachment 2 - Drawing.pdf PDF
Attachment 4 - Sample Service Ticket.docx DOCX document
W911SA24Q3078 SN KS032 Types (8).docx DOCX document
Attachment 3 - AT OPSEC.pdf PDF
W911SA24Q3078 SN KS032 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FACID CHECKLIST

CONTRACTOR PERFORMANCE INSPECTION CHECKLIST & SUMMARY REPORT V 1.5Method of Surveillance: Periodic Surveillance
Service Provided: Snow Removal Services
Contractor Name:
Contract Number: Contractor email:
FAC ID:
Building Number(s):
Contracting Officer Representative:Meeting Contract Requirements
Designated Representative:
Contracting Officer:
Contract Specialist:
Fac ID: XX000Fac ID: XX000Fac ID: XX000Fac ID: XX000Fac ID: XX000Fac ID: XX000Fac ID: XX000Fac ID: XX000
PWS PART 1 General, Yes, No, or n/aYesNoYesNoYesNoYesNoYesNoYesNoYesNoYesNo
1PWS # 1.6.6.1 ID OF EMPLOYEE'S: Are contractor personnel wearing ID badges in a conspicuous place on the front exterior clothing above the waist and are the contractor personnel wearing the ID badges on the employee list provided by the contractor?YesNoYesNoYesNoYesNoYesNoYesNoYesNoYesNo
COMMENTS:
PWS PART 5 Specific Tasks: Snow Removal, 1, 0, n/a, n/oSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSAT
2PWS 5.1 GENERAL: Did snow plowing operations begin within two (2) hours after notification from the COR or Designated Representative or as otherwise coordinated?11111111
COMMENTS:
PWS PART 5 Specific Tasks: Type 1 Snow Removal, 1, 0, n/a, n/oSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSAT
3PWS 5.2 TYPE 1: Was the snow and ice plowed and cleared from roads, sidewalks, parking lots and Military Equipment Park (MEP) lot(s) down to the bare surface as indicated on the drawings?11111111
COMMENTS:
4PWS 5.2 TYPE 1: Were the dumpsters cleared of snow so they may be serviced?11111111
COMMENTS:
5PWS 5.2 TYPE 1: Were all fire hydrants kept free of snow with a minimum 5 foot diameter and a clear pathway free of ice and snow to the hydrant?11111111
COMMENTS:
6PWS 5.2 TYPE 1: Did the Contractor treat plowed and cleaned surfaces skid free by applying a contractor furnished sand, salt or approved chemical?11111111
COMMENTS:
7PWS 5.2 TYPE 1: Did the Contractor keep sidewalks in a slip free condition?11111111
COMMENTS:
PWS PART 5 Specific Tasks: Type 2 Snow Removal, 1, 0, n/a, n/oSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSAT
8PWS 5.3 TYPE 2: Was the snow and ice plowed and cleared from roads, sidewalks, and parking lots down to the bare surface as indicated on the drawings?11111111
COMMENTS:
9PWS 5.3 TYPE 2: Were the dumpsters cleared of snow so they may be serviced?11111111
COMMENTS:
10PWS 5.3 TYPE 2: Were all fire hydrants kept free of snow with a minimum 5 foot diameter and a clear pathway free of ice and snow to the hydrant?11111111
COMMENTS:
11PWS 5.3 TYPE 2: Did the Contractor treat plowed and cleaned surfaces skid free by applying a contractor furnished sand, salt or approved chemical?11111111
COMMENTS:
12PWS 5.3 TYPE 2: Did the Contractor keep sidewalks in a slip free condition?11111111
COMMENTS:
PWS PART 5 Specific Tasks: Type 3 Snow Removal (MEP Lots), 1, 0, n/a, n/oSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSAT
13PWS 5.4 TYPE 3: Was the snow and ice plowed and cleared from roads, sidewalks, and parking lots down to the bare surface as indicated on the drawings?11111111
COMMENTS:
14PWS 5.4 TYPE 3: Were the parked military vehicles cleared of snow so as to be accessable?11111111
COMMENTS:
15PWS 5.4 TYPE 3: Were all fire hydrants kept free of snow with a minimum 5 foot diameter and a clear pathway free of ice and snow to the hydrant?11111111
COMMENTS:
PWS PART 5 Specific Tasks: Type 4 Snow Removal (Sidewalks), 1, 0, n/a, n/oSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSAT
16PWS 5.5 TYPE 4: Was the snow and ice plowed and cleared from sidewalks down to the bare surface as indicated on the drawings?11111111
COMMENTS:
17PWS 5.5 TYPE 4: Were all fire hydrants kept free of snow with a minimum 5 foot diameter and a clear pathway free of ice and snow to the hydrant?11111111
COMMENTS:
18PWS 5.5 TYPE 4: Did the Contractor treat surfaces skid free by applying a contractor furnished sand, salt or approved chemical?11111111
COMMENTS:
19PWS 5.5 TYPE 4: Did the Contractor keep sidewalks in a slip free condition?11111111
COMMENTS:
PWS PART 5 Specific Tasks: Type 5 Salting and Sanding, 1, 0, n/a, n/oSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSAT
20PWS 5.6 TYPE 5: Were all fire hydrants kept free of snow with a minimum 5 foot diameter and a clear pathway free of ice and snow to the hydrant?11111111
COMMENTS:
21PWS 5.6 TYPE 5: Did the Contractor treat plowed and cleaned surfaces skid free by applying a contractor furnished sand, salt or approved chemical?11111111
COMMENTS:
22PWS 5.6 TYPE 5: Did the Contractor keep sidewalks in a slip free condition?11111111
COMMENTS:
PWS PART 5 Specific Tasks: Type 6 Snow Removal (Hauling), 1, 0, n/a, n/oSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSAT
23PWS 5.7 TYPE 6: Was the snow moved from the designated areas to dumping sites as directed by the COR or as shown on the attached drawings?n/an/an/an/an/an/an/an/a
COMMENTS:
PWS PART 5 Specific Tasks: Type 8 Snow Removal (Cleanup), 1, 0, n/a, n/oSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSATSATUNSAT
24PWS 5.9 TYPE 8: Did the Contractor provide adequate End of Season Cleanup that was ordered within 15 business days of being notified?n/an/an/an/an/an/an/an/a
COMMENTS:
PWS PART 7 Deliverables, Yes, No, or n/aYesNoYesNoYesNoYesNoYesNoYesNoYesNoYesNo
25PWS 1.6.14. Key Personnel: Did the contractor provide contact information of the designated and alternate POC 5 days after contract award and update this contact information as changes occur?YesNoYesNoYesNoYesNoYesNoYesNoYesNoYesNo
COMMENTS:
26PWS 1.7.1. AT Level 1 Training: Did Contractor provide the COR certificates verifying all employees completed AT Level 1 Training within 30 days of the contract start date or new hire start date?YesNoYesNoYesNoYesNoYesNoYesNoYesNoYesNo
COMMENTS:
27PWS 1.7.5. iWATCH Training: Was this training to be completed within 30 calendar days of Notice to Proceed and within 30 calendar days of new employees commencing performance with the results reported to the Contracting Officer no later than 60 calendar days after Notice to Proceed?YesNoYesNoYesNoYesNoYesNoYesNoYesNoYesNo
COMMENTS:
28PWS 5.10. Did the Contractor submit a service ticket NLT at end of the month after the service occurred?YesNoYesNoYesNoYesNoYesNoYesNoYesNoYesNo
COMMENTS:
29PWS 5.11. Did the contractor invoice in the appropriate invoicing system?YesNoYesNoYesNoYesNoYesNoYesNoYesNoYesNo
COMMENTS:
30PWS 5.12. Did the Contractor provide required annual CMRA data NLT 31 October?YesNoYesNoYesNoYesNoYesNoYesNoYesNoYesNo
COMMENTS:
Total:210210210210210210210210
100.00% Found Acceptable100.00%100.00%100.00%100.00%100.00%100.00%100.00%100.00%
0.0% - 99.99% Found Unacceptable
All tasks have been inspected in accordance with this checklist per method of surveillanceCumulative percentage:100.00%
Summary Report (Required):
Designated Representative name and date of inspection:
NAME: DATE:
COR Name and date of reviewed and accepted inspection results:
NAME: DATE:

W911SAXXXXXXX LOG

W911SAXXXXXXX Performance FYXX
#MonthContract NumberContractor NameContracting OfficeCustomerContract ValueType ContractKO NameCOR Supervisor NameCOR NameTotal PRS FactorsCompliant PRS FactorsNoncompliant PRS FactorsCompliant Rate
1OctoberMcCoy0ERROR:#DIV/0!
2NovemberMcCoy0ERROR:#DIV/0!
3DecemberMcCoy0ERROR:#DIV/0!
4JanuaryMcCoy0ERROR:#DIV/0!
5FebruaryMcCoy0ERROR:#DIV/0!
6MarchMcCoy0ERROR:#DIV/0!
7AprilMcCoy0ERROR:#DIV/0!
8MayMcCoy0ERROR:#DIV/0!
9JuneMcCoy0ERROR:#DIV/0!
10JulyMcCoy0ERROR:#DIV/0!
11AugustMcCoy0ERROR:#DIV/0!
12SeptemberMcCoy0ERROR:#DIV/0!
Totals000ERROR:#DIV/0!

W911SAXXXXXXX Performance FYXX W911SAXXXXXXX Performance FYXX October November December January February March April May June July August September 0 0 0 0 0 0 0 0 0 0 0 0

W911SAXXXXXXX Performance

Contractor Performance Inspection ChecklistFYXXTOTALS
OctNovDecJanFebMarAprMayJunJulAugSep
PERFORMANCE STANDARDPFPFPFPFPFPFPFPFPFPFPFPFSATUSAT
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
TOTALS00000000000000000000000000

USAT Factors

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

W911SAXXXXXXX Compliance Rates

File details come from the government source that posted it. Updated .