W911SA23Q3063 Attachment 4 - HQDA EXORD 031-19 (FRAGO 2) Ensuring Safe Healthy Workplaces Exposure to Heavy Metals.pdf
PDF 59 KB Posted
- Solicitation number
- W911SA-23-Q-3063
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911SA23Q3063 Attachment 1 - Price Schedule 4.10.23- CUI.xlsx | XLSX spreadsheet | |
| W911SA23Q3063 Amendment 0003 (f).pdf | ||
| W911SA23Q3063 Amendment 0002 (f).pdf | ||
| W911SA23Q3063 Amendment 0001 3.24.23.pdf | ||
| W911SA23Q3063 Attachment 1 - Price Schedule 3.24.23- CUI.xlsx | XLSX spreadsheet | |
| W911SA23Q3063 Solicitation (f) 3.20.23.pdf | ||
| W911SA23Q3063 Attachment 6 - Wage Determination Log.xlsx | XLSX spreadsheet | |
| W911SA23Q3063 Attachment 3 - Shop Locations.xlsx | XLSX spreadsheet | |
| W911SA23Q3063 Attachment 2 - AT OPSEC Cover Sheet.pdf | ||
| W911SA23Q3063 Attachment 5 - Service Ticket.docx | DOCX document | |
| W911SA23Q3063 Attachment 1 - Price Schedule.xlsx | XLSX spreadsheet | |
| W911SA23Q3063 Attachment 7 - PRS.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FRAGO 2 TO HQDA EXORD 031-19 ENSURING SAFE AND HEALTHY
Originator: DA WASHINGTON DC//AOC//
TOR: 02/26/2021 23:29:10
DTG: 262320Z Feb 21 Prec: Priori ty DAC: General
To:
ARLINGTON NATIONAL CEMETERY ARLINGTON VA, ARNG NGB COMOPS ARLINGTON VA, ARNG NGB J3 JOC WASHINGTON DC, ARNGRC ARLINGTON VA, ARNGRC WATCH ARLINGTON VA, CDR 5 ARMY NORTH AOC FT SAM HOUSTON TX, CDR ARMY FUTURES COMMAND AUSTIN TX, CDR ATEC ABERDEEN PROVING GROUND MD, CDR FORSCOM DCS G3 CENTRAL TASKING DIV FT BRAGG NC, CDR FORSCOM DCS G3 CURRENT OPS FT BRAGG NC, CDR FORSCOM DCS G3 CURRENT OPS FT BRAGG NC, CDR FORSCOM DCS G3 WATCH OFFICER FT BRAGG NC, CDR FORSCOM DCS G3 WATCH OFFICER FT BRAGG NC, CDR MDW J3 FT MCNAIR DC, CDR MDW JFHQ-NCR FT MCNAIR DC, CDR NETCOM 9THSC FT HUACHUCA AZ, CDR TRADOC CG FT EUSTIS VA, CDR TRADOC DCS G-3-5-7 OPNS CTR FT EUSTIS VA, CDR USAR NORTH FT SAM HOUSTON TX, CDR USARCENT SHAW AFB SC, CDR USASOC COMMAND CENTER FT BRAGG NC, CDR USASOC FT BRAGG NC, CDR USASOC MESSAGE CENTER FT BRAGG NC, CDR3RD ARMY USARCENT WATCH OFFICER SHAW AFB SC, CDRAMC REDSTONE ARSENAL AL, CDRFORSCOM FT BRAGG NC, CDRHRC G3 DCSOPS FT KNOX KY, CDRINSCOM FT BELVOIR VA, CDRINSCOMIOC FT BELVOIR VA, CDRMDW WASHINGTON DC, CDRUSACE WASHINGTON DC, CDRUSACIDC FT BELVOIR VA, CDRUSACYBER FT BELVOIR VA, CDRUSACYBER G3 FT BELVOIR VA, CDRUSACYBER G33 FT BELVOIR VA, CDRUSAEIGHT G3 CUROPS SEOUL KOR, CDRUSAEIGHT SEOUL KOR, CDRUSAMEDCOM FT SAM HOUSTON TX, CDRUSARC G33 READ FT BRAGG NC, CDRUSARCYBER WATCH OFFICER FT BELVOIR VA, CDRUSARPAC CG FT SHAFTER HI, CDRUSARPAC FT SHAFTER HI, COMDT USAWC CARLISLE BARRACKS PA, HQ IMCOM FT SAM HOUSTON TX, HQ INSCOM IOC FT BELVOIR VA, HQ SDDC CMD GROUP SCOTT AFB IL, HQ SDDC OPS MSG CNTR SCOTT AFB IL, HQ USARSO FT SAM HOUSTON TX, HQ USARSO G3 FT SAM HOUSTON TX, HQDA ARMY STAFF WASHINGTON DC, HQDA CSA WASHINGTON DC, HQDA EXEC OFFICE WASHINGTON DC, HQDA IMCOM OPS DIV WASHINGTON DC, HQDA SEC ARMY WASHINGTON DC, HQDA SECRETARIAT WASHINGTON DC, HQDA SURG GEN WASHINGTON DC, MEDCOM HQ EOC FT SAM HOUSTON TX, NETCOM G3 CURRENT OPS FT HUACHUCA AZ, NGB WASHINGTON DC, SMDC ARSTRAT CG ARLINGTON VA, SMDC ARSTRAT G3 ARLINGTON VA, SUPERINTENDENT USMA WEST POINT NY, SURGEON GEN FALLS CHURCH VA, USAR AROC FT BRAGG NC, USAR CMD GRP FT BRAGG NC, USAR DCS G33 OPERATIONS FT BRAGG NC, USARCENT G3 FWD, USARPAC COMMAND CENTER FT SHAFTER HI, CDR USAREUR-AF WIESBADEN GE, CDR SETAF-AF VICENZA IT
CC: HQDA AOC DAMO ODO OPS AND CONT PLANS WASHINGTON DC, HQDA AOC G3 DAMO CAT OPSWATCH WASHINGTON DC, HQDA
AOC G3 DAMO OD DIR OPS READ AND MOB WASHINGTON DC
Attachments: HQDA EXORD 031-19 (FRAGO 2) Tab C (Contract Lab Sample Analys is_Reporting Cri teria) to App 3 to Annex F.docx, HQDA EXORD 031-19 (FRAGO 2) Tab D (Periodic Monitoring Frequency Requirements) to App 3 to Annex F.docx
PAAUZATZ RUEADWD0472 0572329-UUUU--RUIAAAA RUEADWD.
ZNR UUUUU
P 262320Z FEB 21
FM DA WASHINGTON DC//AOC//
TO RUIAAAA/ARLINGTON NATIONAL CEMETERY ARLINGTON VA
RUIAAAA/ARNG NGB COMOPS ARLINGTON VA
RUIAAAA/ARNG NGB J3 JOC WASHINGTON DC
RUIAAAA/ARNGRC ARLINGTON VA
RUIAAAA/ARNGRC WATCH ARLINGTON VA
RUIAAAA/CDR 5 ARMY NORTH AOC FT SAM HOUSTON TX
RUIAAAA/CDR ARMY FUTURES COMMAND AUSTIN TX
RUIAAAA/CDR ATEC ABERDEEN PROVING GROUND MD
RUJAAAA/CDR FORSCOM DCS G3 CENTRAL TASKING DIV FT BRAGG NC
RUJAAAA/CDR FORSCOM DCS G3 CURRENT OPS FT BRAGG NC
RUIAAAA/CDR FORSCOM DCS G3 CURRENT OPS FT BRAGG NC
RUJAAAA/CDR FORSCOM DCS G3 WATCH OFFICER FT BRAGG NC
RUIAAAA/CDR FORSCOM DCS G3 WATCH OFFICER FT BRAGG NC
RUIAAAA/CDR MDW J3 FT MCNAIR DC
RUIAAAA/CDR MDW JFHQ-NCR FT MCNAIR DC
RUIAAAA/CDR NETCOM 9THSC FT HUACHUCA AZ
RUIAAAA/CDR TRADOC CG FT EUSTIS VA
RUIAAAA/CDR TRADOC DCS G-3-5-7 OPNS CTR FT EUSTIS VA
RUIAAAA/CDR USAR NORTH FT SAM HOUSTON TX
RUIAAAA/CDR USARCENT SHAW AFB SC
RUIAAAA/CDR USASOC COMMAND CENTER FT BRAGG NC
UNCLAS CUI
UNCLAS CUI
RUIAAAA/CDR USASOC FT BRAGG NC
RUIAAAA/CDR USASOC MESSAGE CENTER FT BRAGG NC
RUIAAAA/CDR3RD ARMY USARCENT WATCH OFFICER SHAW AFB SC
RUIAAAA/CDRAMC REDSTONE ARSENAL AL
RUIAAAA/CDRFORSCOM FT BRAGG NC
RUIAAAA/CDRHRC G3 DCSOPS FT KNOX KY
RUIAAAA/CDRINSCOM FT BELVOIR VA
RUIAAAA/CDRINSCOMIOC FT BELVOIR VA
RUIAAAA/CDRMDW WASHINGTON DC
RUIAAAA/CDRUSACE WASHINGTON DC
RUIAAAA/CDRUSACIDC FT BELVOIR VA
RUIAAAA/CDRUSACYBER FT BELVOIR VA
RUIAAAA/CDRUSACYBER G3 FT BELVOIR VA
RUIAAAA/CDRUSACYBER G33 FT BELVOIR VA
RUIAAAA/CDRUSAEIGHT G3 CUROPS SEOUL KOR
RUIAAAA/CDRUSAEIGHT SEOUL KOR
RUIAAAA/CDRUSAMEDCOM FT SAM HOUSTON TX
RUIAAAA/CDRUSARC G33 READ FT BRAGG NC
RUIAAAA/CDRUSARCYBER WATCH OFFICER FT BELVOIR VA
RUIAAAA/CDRUSARPAC CG FT SHAFTER HI
RUIAAAA/CDRUSARPAC FT SHAFTER HI
RUIAAAA/COMDT USAWC CARLISLE BARRACKS PA
RUIAAAA/HQ IMCOM FT SAM HOUSTON TX
RUIAAAA/HQ INSCOM IOC FT BELVOIR VA
RUIAAAA/HQ SDDC CMD GROUP SCOTT AFB IL
RUIAAAA/HQ SDDC OPS MSG CNTR SCOTT AFB IL
RUIAAAA/HQ USARSO FT SAM HOUSTON TX
RUIAAAA/HQ USARSO G3 FT SAM HOUSTON TX
RUEADWD/HQDA ARMY STAFF WASHINGTON DC
RUEADWD/HQDA CSA WASHINGTON DC
RUEADWD/HQDA EXEC OFFICE WASHINGTON DC
RUEADWD/HQDA IMCOM OPS DIV WASHINGTON DC
RUEADWD/HQDA SEC ARMY WASHINGTON DC
RUEADWD/HQDA SECRETARIAT WASHINGTON DC
RUEADWD/HQDA SURG GEN WASHINGTON DC
RUIAAAA/MEDCOM HQ EOC FT SAM HOUSTON TX
RUIAAAA/NETCOM G3 CURRENT OPS FT HUACHUCA AZ
RUIAAAA/NGB WASHINGTON DC
RUIAAAA/SMDC ARSTRAT CG ARLINGTON VA
RUIAAAA/SMDC ARSTRAT G3 ARLINGTON VA
RUIAAAA/SUPERINTENDENT USMA WEST POINT NY
RUIAAAA/SURGEON GEN FALLS CHURCH VA
RUIAAAA/USAR AROC FT BRAGG NC
RUIAAAA/USAR CMD GRP FT BRAGG NC
RUIAAAA/USAR DCS G33 OPERATIONS FT BRAGG NC
RUIAAAA/USARCENT G3 FWD
RUIAAAA/USARPAC COMMAND CENTER FT SHAFTER HI
RUIAAAA/CDR USAREUR-AF WIESBADEN GE
RUIPAAA/CDR SETAF-AF VICENZA IT
INFO RUIAAAA/HQDA AOC DAMO ODO OPS AND CONT PLANS WASHINGTON DC
RUIAAAA/HQDA AOC G3 DAMO CAT OPSWATCH WASHINGTON DC
RUIAAAA/HQDA AOC G3 DAMO OD DIR OPS READ AND MOB WASHINGTON DC
BT
UNCLAS CUI
SUBJ/FRAGO 2 TO HQDA EXORD 031-19 ENSURING SAFE AND HEALTHY
WORKPLACES THAT GENERATE OR HAVE POTENTIAL FOR EXPOSURE TO HEAVY
METALS
CUI//
CONTROLLED BY: HQDA
CONTROLLED BY: ODASAF
CUI CATEGORY: OPSEC
LIMITED DISSEMINATION CONTROL: FEDCON
UNCLAS CUI
POC: COL JENNESS STEELE 703-697-1104
SUBJECT: FRAGO 2 TO HQDA EXORD 031-19 ENSURING SAFE AND HEALTHY
WORKPLACES THAT GENERATE OR HAVE POTENTIAL FOR EXPOSURE TO HEAVY
METALS//
(U) REFERENCES:
REF//A/ THROUGH REF//U/ NO CHANGE.
REF//V/ (U) [ADD] **CORRECTED COPY** FRAGO 1 TO HQDA EXORD 031-19
ENSURING SAFE AND HEALTHY WORKPLACES THAT GENERATE OR HAVE POTENTIAL
FOR EXPOSURE TO HEAVY METALS, DTG: 241504Z AUG 20//
1. (U) SITUATION. NO CHANGE.
2. (U) MISSION. NO CHANGE.
3. (U) EXECUTION.
3.A. (U) COMMANDER'S INTENT. NO CHANGE.
3.A.1. (U) KEY TASKS. NO CHANGE.
3.A.2. (U) END STATE. NO CHANGE.
3.B. (U) CONCEPT OF OPERATION. THIS OPERATION WILL BE CONDUCTED IN
FOUR (4) PHASES:
3.B.1. (U) [CHANGE TO READ] PHASE 1 - NOTIFICATION AND
IDENTIFICATION. THIS PHASE BEGINS WITH RECEIPT OF HQDA EXORD 031-19
ENSURING SAFE AND HEALTHY ARMY WORKPLACES THAT GENERATE OR HAVE
POTENTIAL FOR EXPOSURE TO HEAVY METALS. THIS PHASE IS COMPLETE ONCE
ALL ARMY WORKSITES WITH POTENTIAL HEAVY METAL GENERATING PROCESSES
AND
POTENTIAL EXPOSURES ARE CAPTURED IN THE DOD ENVIRONMENTAL, SAFETY AND
OCCUPATIONAL HEALTH NETWORK AND INFORMATION EXCHANGE (DENIX) ARMY
HEAVY METAL WORKPLACE DATA MANAGEMENT SITE NLT 60 DAYS FROM ISSUANCE
OF THIS FRAGO. ANY EXTENSIONS TO THE TIMELINE MUST BE REQUESTED ON A
CASE-BY-CASE BASIS.
3.B.2. (U) [CHANGE TO READ] PHASE 2 - EXECUTION OF INDUSTRIAL
HYGIENE
(IH) EXPOSURE ASSESSMENTS AND REPORTING. THIS PHASE BEGINS AT EACH
WORKPLACE AFTER THE COMPLETION OF PHASE 1. THE PHASE WILL END UPON
COMPLETION OF IH EXPOSURE ASSESSMENTS OF ALL IDENTIFIED WORKSITES AND
REPORTING EXPOSURE DATA TO RELEVANT PERSONNEL. THIS PHASE IS ONGOING
AND THE TIMELINE MAY REQUIRE ADDITIONAL ADJUSTMENTS DUE TO
CORONAVIRUS
DISEASE 2019 (COVID-19) IMPACTS.
3.B.3. (U) [CHANGE TO READ] PHASE 3 - RECORD IH EXPOSURE ASSESSMENT
DATA, DEFINE CONTROLS, AND IDENTIFY IMPACTS. THIS PHASE BEGINS AFTER
COMPLETION OF PHASE 2. RECORD REQUIRED ASSESSMENT AND RECOMMENDED
CONTROLS DATA, TO INCLUDE COSTS, IN THE DENIX ARMY HEAVY METAL
WORKPLACE DATA MANAGEMENT SITE AND DEFENSE OCCUPATIONAL AND
ENVIRONMENTAL HEALTH READINESS SYSTEM-INDUSTRIAL HYGIENE (DOEHRS-IH),
UNCLAS CUI
AS APPLICABLE. DEFINE AND CAPTURE APPROPRIATE CONTROLS, AND
ASSOCIATED COSTS, IN ACCORDANCE WITH (IAW) THE HIERARCHY OF CONTROLS
AND THE DENIX ARMY HEAVY METAL WORKPLACE DATA MANAGEMENT SITE, USER
SITE INSTRUCTIONS, AS APPLICABLE, WITHIN THREE (3) MONTHS OF
RECEPTION
OF AN IH EXPOSURE ASSESSMENT REPORT. CONSOLIDATE DATA FOR ARMY LEVEL
ANALYSIS AND GUIDANCE FROM SENIOR LEADERSHIP. THIS PHASE IS ONGOING
AND WILL END WHEN ALL REQUIRED DATA ARE CAPTURED IN THE DENIX ARMY
HEAVY METAL WORKPLACE DATA MANAGEMENT SITE AND DOEHRS-IH (NLT JANUARY
2022).
3.B.4. (U) PHASE 4 - CONTROL AND CORRECT. NO CHANGE.
3.C. (U) TASKS TO SUBORDINATE UNITS.
3.C.1. (U) COMMANDERS, ARMY COMMANDS (ACOM), ARMY SERVICE COMPONENT
COMMANDS (ASCC), AND DIRECT REPORTING UNITS (DRU).
3.C.1.A. THROUGH 3.C.1.D. NO CHANGE.
3.C.1.E. (U) [CHANGE TO READ] CROSS-CHECK ALL IDENTIFIED ARMY OWNED,
LEASED, OR SUPPORTED WORKSITES WHERE POTENTIAL EXPOSURES TO CHROMIUM
(CR)/CR COMPOUNDS EXIST WITH THE WORKSITE LISTS PROVIDED ON THE DENIX
ARMY HEAVY METAL WORKPLACE DATA MANAGEMENT SITE,
HTTPS://AUTHORING.DENIX.OSD.MIL/ARMY-HEAVY-METAL-WORKPLACE/HOME/.
BASED ON PHASE I LOCATION UPDATES, WORKSITE LISTS ARE UPDATED BI-
MONTHLY (NLT THE 1ST AND 15TH OF EACH MONTH) UNTIL PHASE I IS
COMPLETE. SUBMIT THE FOLLOWING INFORMATION TO THE DENIX ARMY HEAVY
METAL WORKPLACE DATA MANAGEMENT PROJECT MANAGER POINT OF CONTACT
(POC)
LISTED IN COMMAND AND SIGNAL, PARAGRAPH 5 TO COORDINATE ACCESS TO THE
DENIX ARMY HEAVY METAL WORKPLACE DATA MANAGEMENT SITE NLT 14 BUSINESS
DAYS FROM THIS FRAGO PUBLISHING: (1) NAME; (2) GOVERNMENT EMAIL
ADDRESS; AND (3) INSTALLATION NAME(S) FOR WHICH THE USER WILL NEED
DENIX ACCESS.
3.C.1.E.1. (U) [ADD] FOR WORKSITES THAT ARE IDENTIFIED AS
APHC/SOLDIER OCCUPATIONAL HEALTH ASSESSMENT (SOHA) PROGRAM-LED SITES,
ACOM, ASCC, DRU, AND ORGANIZATIONS WILL CONTACT THE APHC HEAVY METAL
SAMPLING COORDINATOR POC LISTED IN COMMAND AND SIGNAL, PARAGRAPH 5 TO
COORDINATE EXECUTION OF THE REQUIRED FOLLOW-ON IH EXPOSURE
ASSESSMENTS. APHC/SOHA PROGRAM-LED INHALABLE SAMPLING FOR CR/CR
COMPOUNDS WILL NOT BE CONTRACTED AND APHC IH STAFF WILL ENTER THIS
INITIAL APHC-LED IH EXPOSURE ASSESSMENT INFORMATION INTO THE
DOEHRS-IH
PER APHC DOEHRS-IH TRAINING GUIDANCE. APHC IH PERSONNEL WILL
COMPLETE
THE APHC LABORATORY INFORMATION DOCUMENT SYSTEM (LIDS) 9 SUBMISSION
FORM FOR APHC CONDUCTED LABORATORY ANALYSIS.
3.C.1.E.2. (U) [ADD] FOR IDENTIFIED ARMY OWNED, LEASED, OR SUPPORTED
WORKSITES WHERE POTENTIAL EXPOSURES TO CR/CR COMPOUNDS EXIST, AND
WHERE WORKSITES ARE IDENTIFIED AS IH PROGRAM OFFICE (OR EQUIVALENT)-
UNCLAS CUI
LED SITES, ACOM, ASCC, DRU, AND ORGANIZATIONS WILL CONTACT THEIR
RESPECTIVE IH PROGRAM MANAGER (OR EQUIVALENT) TO COORDINATE EXECUTION
OF THE REQUIRED IH PROGRAM MANAGER-LED FOLLOW-ON IH EXPOSURE
ASSESSMENT OR TO NOTIFY THE RESPECTIVE IH PROGRAM MANAGER (OR
EQUIVALENT) OF THE INTENT TO USE CONTRACT IH SUPPORT. IF APHC
LABORATORY SERVICE SUPPORT IS REQUESTED (TO INCLUDE USE OF SAMPLING
MEDIA AND/OR ANALYSIS), IH PROGRAM MANAGERS (OR EQUIVALENT) OR
CONTRACTORS WILL CONTACT THE APHC HEAVY METAL SAMPLING COORDINATOR
POC
LISTED IN COMMAND AND SIGNAL, PARAGRAPH 5, A MINIMUM OF 30 DAYS PRIOR
TO SAMPLING TO COORDINATE LABORATORY SERVICE SUPPORT. UNUSED APHC-
PROVIDED SAMPLING MEDIA WILL BE RETURNED TO THE APHC LABORATORY NO
LATER THAN TWO (2) WEEKS FROM COORDINATED SAMPLING DATES. FOR ALL
APHC LABORATORY SERVICE SUPPORT, IH PROGRAM MANAGERS (OR EQUIVALENT)
OR CONTRACTORS WILL COMPLETE THE APHC LIDS 9 SUBMISSION FORM. IF
CONTRACT LABORATORY SERVICES ARE USED, SEE TAB C (CONTRACT LABORATORY
SAMPLE ANALYSIS/REPORTING CRITERIA) TO APPENDIX 3 ANNEX F FOR
REQUIREMENTS. IH PROGRAM MANGERS (OR EQUIVALENT) OR CONTRACTORS WILL
ENTER IH EXPOSURE ASSESSMENT INFORMATION INTO THE DOEHRS-IH PER APHC
DOEHRS-IH TRAINING GUIDANCE.
3.C.1.F. [DELETED].
3.C.1.G. THROUGH 3.C.1.L. NO CHANGE.
3.C.1.M. (U) [CHANGE TO READ] REVIEW THE DENIX ARMY HEAVY METAL
WORKPLACE DATA MANAGEMENT HOME, INSTALLATION-SPECIFIC, WORKPLACE/SHOP
INFORMATION, HTTPS://AUTHORING.DENIX.OSD.MIL/ARMY-HEAVY-METAL-
WORKPLACE/HOME/, TO ENSURE ALL ARMY WORKSITES WITH POTENTIAL HEAVY
METAL GENERATING PROCESSES AND POTENTIAL EXPOSURES ARE CAPTURED NLT
DAYS FROM ISSUANCE OF THIS FRAGO. FOR WORKSITES THAT ARE NOT
CAPTURED, INSTALLATION SAFETY MANAGERS (OR EQUIVALENT) WILL
COORDINATE
WITH THE APPROPRIATE IH EXPOSURE ASSESSMENT TEAM (I.E., APHC/SOHA-
PROGRAM POC, IH PROGRAM MANAGER (OR EQUIVALENT) OR IH CONTRACTOR) TO
COMPLETE THE LOCATION PROCESS HAZARD CONTROL DATA INFORMATION
TEMPLATE, ACCESSIBLE VIA THE AFOREMENTIONED LINK, FOR EACH
WORKPLACE/SHOP. INSTALLATION SAFETY MANAGERS (OR EQUIVALENT) WILL
UPLOAD TEMPLATES WITHIN THE CORRESPONDING INSTALLATION SITE NLT 60
DAYS FROM ISSUANCE OF THIS FRAGO. FOR EACH INSTALLATION, COMPLETE
THE
WORKPLACE/SHOP COST INFORMATION WITHIN THREE (3) MONTHS OF RECEPTION
OF THE IH EXPOSURE ASSESSMENT REPORT. GUIDANCE FOR COMPLETING THE
DENIX ARMY HEAVY METAL WORKPLACE DATA MANAGEMENT HOME, LOCATION
PROCESS HAZARD CONTROL DATA INFORMATION TEMPLATE AND INSTALLATION-
SPECIFIC, WORKPLACE/SHOP INFORMATION IS ACCESSIBLE VIA THE
AFOREMENTIONED HYPERLINK, USER SITE INSTRUCTIONS, EMBEDDED WITHIN THE
MENU TAB. FOR ADDITIONAL GUIDANCE, CONTACT THE APHC DENIX ARMY HEAVY
METAL WORKPLACE DATA MANAGEMENT PROJECT MANAGER IN COMMAND AND
SIGNAL,
PARAGRAPH 5.
3.C.1.N. (U) [ADD] PERSONNEL MAY INADVERTENTLY CARRY HEAVY METAL
DUST/DEBRIS FROM THE WORKPLACE TO THEIR HOME OR CAR VIA VARIOUS
UNCLAS CUI
ROUTES
(E.G., HAIR, SKIN, CLOTHES). THESE EVENTS MAY RESULT IN HEAVY METAL
EXPOSURES TO FAMILY MEMBERS, REFERRED TO AS TAKE-HOME EXPOSURES.
THESE
TAKE-HOME EXPOSURES MAY SUBSEQUENTLY PRESENT A POTENTIAL HEALTH
HAZARD. THE FOLLOWING SITE INCLUDES INFORMATION AND GUIDANCE FOR
MITIGATING INADVERTENT HEAVY METAL EXPOSURES TO FAMILY MEMBERS
RESULTING FROM TAKE-HOME EXPOSURES:
HTTPS://PHC.AMEDD.ARMY.MIL/TOPICS/WORKPLACEHEALTH/IH/PAGES/CR6.ASPX.
3.C.2. (U) COMMANDER, U.S. ARMY COMBAT READINESS CENTER (USACRC).
NO
CHANGE.
3.C.3. (U) DIRECTOR, U.S. ARMY PUBLIC HEALTH CENTER (APHC).
3.C.3.A. (U) [CHANGE TO READ] ON A BI-MONTHLY BASIS (NLT THE 14TH
AND
30TH OF EACH MONTH) UNTIL PHASE I IS COMPLETE, USING DENIX ARMY HEAVY
METAL WORKPLACE DATA MANAGEMENT HOME, LOCATION PROCESS HAZARD CONTROL
DATA INFORMATION TEMPLATE DATA, OBTAINED DURING PHASE 1, UPDATE THE
APHC/SOHA PROGRAM-LED AND IH PROGRAM OFFICE (OR EQUIVALENT)-LED IH
EXPOSURE ASSESSMENT WORKSITE LISTS AND UPLOAD TO
HTTPS://AUTHORING.DENIX.OSD.MIL/ARMY-HEAVY-METAL-WORKPLACE/HOME/.
3.C.3.B. [DELETED].
3.C.3.C. (U) [CHANGE TO READ] DEVELOP AND DISTRIBUTE IH-SPECIFIC
GUIDANCE/REQUIREMENTS FOR THE EXECUTION OF SAMPLING.
3.C.4. (U) COMMANDERS, ACOM, ASCC, DRU AND REQUEST DIRECTOR, ARMY
NATIONAL GUARD (ARNG).
3.C.4.A. (U) [CHANGE TO READ] CONDUCT, RECORD AND REPORT IH EXPOSURE
ASSESSMENTS IAW ARMY POLICY AND THIS FRAGO. FOLLOWING A BASELINE IH
EXPOSURE ASSESSMENT, ALIGN PERIODIC MONITORING FREQUENCIES WITH THE
GUIDANCE PROVIDED IN TAB D (PERIODIC MONITORING FREQUENCY
REQUIREMENTS) TO APPENDIX 3, ANNEX F.
3.C.4.B. (U) [CHANGE TO READ] ENSURE IH EXPOSURE ASSESSMENT DATA ARE
REPORTED TO RELEVANT PERSONNEL (E.G. COMMANDERS/SUPERVISORS,
OCCUPATIONAL HEALTH MANAGERS, SAFETY OFFICE, ENVIRONMENTAL
COORDINATOR, ETC.) TO SUPPORT MEDICAL SURVEILLANCE AND HAZARDOUS
EXPOSURE CONTROL EFFORTS.
3.C.4.C. NO CHANGE.
3.C.4.D. NO CHANGE.
3.C.4.E. (U) [CHANGE TO READ] ENSURE COMPLIANCE WITH IH-SPECIFIC
GUIDANCE/REQUIREMENTS FOR THE EXECUTION OF SAMPLING.
3.C.4.F. THROUGH 3.C.4.H. NO CHANGE.
3.C.4.I. (U) [CHANGE TO READ] ESTABLISH AND MAINTAIN REGULATED AREAS
AND WORK AREAS PER OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
(OSHA) REGULATORY REQUIREMENTS. A REGULATED AREA IS A DEMARCATED
UNCLAS CUI
AREA, WHERE AN EXPOSURE TO AIRBORNE CONCENTRATIONS OF A SPECIFIED
HEAVY METAL EXCEEDS, OR CAN REASONABLY BE EXPECTED TO EXCEED, THE
OSHA
PERMISSIBLE EXPOSURE LIMIT (PEL) OR OSHA SHORT TERM EXPOSURE LIMIT
(STEL), AS APPLICABLE. REGULATED AREA REQUIREMENTS APPLY TO
BERYLLIUM,
CADMIUM AND HEXAVALENT CHROMIUM (CR(VI))EXPOSURES. WORK AREA
REQUIREMENTS APPLY TO LEAD AND BERYLLIUM EXPOSURES. A LEAD WORK AREA
IS AN AREA WHERE AN EXPOSURE TO LEAD IS ABOVE THE OSHA PEL. A
BERYLLIUM WORK AREA IS AN AREA WHERE AN EXPOSURE TO BERYLLIUM IS (1)
WHERE PERSONNEL ARE, OR CAN REASONABLY BE EXPECTED TO BE, EXPOSED TO
AIRBORNE BERYLLIUM AT OR ABOVE THE ACTION LEVEL; OR (2) DURING ANY OF
THE OPERATIONS LISTED IN APPENDIX A OF THE OCCUPATIONAL SAFETY AND
HEALTH BERYLLIUM STANDARD.
3.C.4.J. (U) [ADD] ESTABLISH AND MAINTAIN AWARENESS ZONES WHERE
PERSONNEL ARE, OR CAN REASONABLY BE EXPECTED TO BE, EXPOSED TO
AIRBORNE HEAVY METAL LEVELS ABOVE THE AMERICAN CONFERENCE OF
GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH) THRESHOLD LIMIT VALUES
(TLV) AND/OR ABOVE THE ACGIH STEL BUT BELOW THE OSHA PEL OR OSHA
STEL,
AS APPLICABLE. ZONE REQUIREMENTS APPLY TO INHALABLE BERYLLIUM,
RESPIRABLE CADMIUM AND INHALABLE CR(VI). ACCESS TO AWARENESS ZONES
IS
LIMITED TO PERSONNEL: (1) AUTHORIZED BY THE SUPERVISOR, OR
EQUIVALENT,
AND REQUIRED BY WORK DUTIES TO BE PRESENT IN THE AWARENESS ZONE; (2)
ENTERING AS A DESIGNATED REPRESENTATIVE FOR THE PURPOSE OF EXPOSURE
DETERMINATION. ENSURE AWARENESS ZONES ARE DEMARCATED FROM THE REST OF
THE WORKPLACE IN A MANNER THAT ADEQUATELY ESTABLISHES AND ALERTS
PERSONNEL OF THE BOUNDARIES OF THE AWARENESS ZONE. SIGNS DEMARCATING
INHALABLE BERYLLIUM, RESPIRABLE CADMIUM AND INHALABLE CR(VI)
AWARENESS
ZONES MUST INCLUDE THE FOLLOWING VERBIAGE: (1) DANGER; (2) AWARENESS
ZONE; (3) AN ANNOTATION OF THE METAL OF CONCERN; (4) MAY CAUSE
CANCER;
(5) CAUSES DAMAGE TO THE LUNG (RESPIRABLE CADMIUM AWARENESS ZONES
MUST
ALSO INCLUDE VERBIAGE NOTING POTENTIAL DAMAGE TO THE KIDNEYS); (6)
AUTHORIZED PERSONNEL ONLY; (7) WEAR RESPIRATORY PROTECTION IN THIS
AREA (INHALABLE BERYLLIUM AND INHALABLE CR(VI) AWARENESS ZONES MUST
ALSO INCLUDE VERBIAGE NOTING THE REQUIREMENT TO WEAR PERSONAL
PROTECTIVE CLOTHING AND EQUIPMENT IN THIS AREA). USE OF PERSONAL
PROTECTIVE CLOTHING AND EQUIPMENT MUST ALIGN WITH OSHA REQUIREMENTS
FOR PEL OR AL EXPOSURE EXCEEDANCES, AS APPLICABLE, AND GUIDANCE
PROVIDED BY AN INDUSTRIAL HYGIENIST.
3.D. (U) COORDINATING INSTRUCTIONS. NO CHANGE.
4. (U) SUSTAINMENT. NOT USED.
5. (U) COMMAND AND SIGNAL.
5.A. (U) COMMAND. NOT USED.
5.B. (U) SIGNAL.
5.B.1. (U) [CHANGE TO READ] USACRC POC: MR. PHIL SANTEE, COMM: 703-
697-1312, EMAIL: PHILLIP.S.SANTEE.CIV@MAIL.MIL.
UNCLAS CUI
5.B.2. (U) [CHANGE TO READ] OFFICE OF THE SURGEON GENERAL
(OTSG)/MEDCOM, DCS-PH, PUBLIC HEALTH DIRECTORATE, INDUSTRIAL HYGIENE
POC: LTC PATRICIA PASSMAN, COMM: 703-681-8382, EMAIL:
PATRICIA.H.PASSMAN.MIL@MAIL.MIL.
5.B.3. (U) [CHANGE TO READ] APHC INDUSTRIAL HYGIENE POC: MS. LINDSEY
KNETEN, COMM: 410-436-5485, EMAIL: LINDSEY.B.KNETEN.CIV@MAIL.MIL.
5.B.4. (U) [CHANGE TO READ] APHC RISK COMMUNICATION PROJECT MANAGER
POC: MS. BETHNEY DAVIDSON, COMM: 410-436-4851, EMAIL:
BETHNEY.A.DAVIDSON.CIV@MAIL.MIL.
5.B.5. (U) [RESTATED] USACRC HAZARD COMMUNICATION PROJECT MANAGER
POC: MR. WESLEY HEDMAN, COMM: 334-255-0235, EMAIL:
WESLEY.E.HEDMAN.CIV@MAIL.MIL.
5.B.6. (U) [RESTATED] ASA (IE&E) DIRECTOR FOR SAFETY AND
OCCUPATIONAL
HEALTH POC: MS. MARJORIE MCDONALD, COMM: 703-697-3123, EMAIL:
MARJORIE.J.MCDONALD.CIV@MAIL.MIL.
5.B.7. (U) [ADD] APHC INDUSTRIAL HYGIENE, HEAVY METAL SAMPLING
COORDINATOR POC: MRS. LINDSEY B. KNETEN, COMM: 410- 436-5485, EMAIL:
LINDSEY.B.KNETEN.CIV@MAIL.MIL
5.B.8. (U) [ADD] THE APHC DENIX ARMY HEAVY METAL WORKPLACE DATA
MANAGEMENT PROJECT MANAGER POC: MR. GLENN MITCHELL, COM:
210-367-6479, EMAIL: GLENN.E.MITCHELL.CIV@MAIL.MIL
6. (U) THE EXPIRATION DATE OF THIS FRAGO COINCIDES WITH THE
EXPIRATION DATE OF HQDA EXORD 031-19 (W/FRAGO 1) ON 31 DECEMBER 2022,
UNLESS FORMALLY RESCINDED OR SUPERSEDED.
ATTACHMENTS:
- ANNEX E (PROTECTION). NO CHANGE.
- APPENDIX 7 (SAFETY) TO ANNEX E (PROTECTION). NO CHANGE.
- TAB A (KNOWN DOEHRS IH HEAVY METAL WORKPLACES) TO APPENDIX 7 TO
ANNEX E. NO CHANGE.
- TAB B (KNOWN DOEHRS-IH BERYLLIUM WORKPLACES) TO APPENDIX 7 TO ANNEX
E. NO CHANGE.
- TAB C (WORKSHEET - ARMY WORKSITES WITH HEAVY METAL EXPOSURES) TO
APPENDIX 7 TO ANNEX E. NO CHANGE.
- TAB D (EXAMPLE HOUSEKEEPING PLAN BEST PRACTICES TEMPLATE) TO
APPENDIX 7 TO ANNEX E. NO CHANGE.
- ANNEX F (SUSTAINMENT). NO CHANGE.
- APPENDIX 3 (ARMY HEALTH SYSTEM SUPPORT) TO ANNEX F (SUSTAINMENT).
NO CHANGE.
[DELETED] TAB A (INDUSTRIAL HYGIENE INHALABLE SAMPLING PLAN SCHEDULE
FOR CR/CR COMPOUNDS, APHC-LED) TO APPENDIX 3 TO ANNEX F.
[DELETED] TAB B (INDUSTRIAL HYGIENE INHALABLE SAMPLING PLAN SCHEDULE
FOR CR/CR COMPOUNDS, INSTALLATION IH PROGRAM-LED) TO APPENDIX 3 TO
ANNEX F.
[ADD] - TAB C (CONTRACT LABORATORY SAMPLE ANALYSIS/REPORTING
CRITERIA)
TO APPENDIX 3 ANNEX F.
[ADD] - TAB D.(PERIODIC MONITORING FREQUENCY REQUIREMENTS) TO
UNCLAS CUI
APPENDIX
3 ANNEX F.
BT
#0472
NNNN
Received from AUTODIN 262329Z Feb 21
UNCLAS CUI
File details come from the government source that posted it. Updated .