W911SA22Q2000 Attachment 3 Specifications 3-2-22.pdf

PDF 771 KB Posted

Attached to
Repair HVAC B103, Fort McCoy, WI
Solicitation number
W911SA22Q2000
Issued by

About this file

This document outlines a federal solicitation for repair work on an HVAC system at Building 103 at Fort McCoy in Wisconsin. The solicitation will be issued as a request for quotes under FAR Part 13 for repair of the HVAC system at Building 103 to include replacement of equipment, installation of new ductwork and controls, and repair of existing systems. The period of performance is 365 days from notice to proceed with work to be completed within that timeframe. The requirement is set aside for small businesses with a magnitude between $100,000 to $250,000. A site visit will be held with attendance encouraged but not mandatory. The Department of the Army Mission and Installation Contracting Command at Fort McCoy is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 2022 Building 103 HVAC System Repairs

SPECIFICATIONS

FOR

BUILDING 103

HVAC SYSTEM REPAIRS

PROJECT NAME: BUILDING 103 HVAC SYSTEM

REPAIRS, FORT MCCOY, WI

PROJECT NUMBER: 47-018-1734

February 2022 Building 103 HVAC System Repairs

THIS PAGE LEFT BLANK INTENTIONALLY

00 01 10 - 1

DOCUMENT 00 01 10

TABLE OF CONTENTS

Number Document

00 01 10 Table of Contents

DIVISION 1 - GENERAL REQUIREMENTS

01 10 10 General Requirements 01 12 10 Contract Considerations 01 33 00 Submittals 01 35 26 Special Safety Requirements 01 42 13 Industry Standard Abbreviations and Codes 01 57 19 Environmental Controls

DIVISION 2 - EXISTING CONDITIONS

02 41 19 Selective Building Demolition

DIVISION 3 – CONCRETE (NOT USED)

DIVISION 4 – MASONRY (NOT USED)

DIVISION 5 – METALS (NOT USED)

DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES

06 11 00 Wood Framing 06 16 00 Sheathing

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

07 21 19 Foamed-in-Place Insulation 07 25 00 Weather Barriers

DIVISION 8 – OPENINGS (NOT USED)

DIVISION 9 - FINISHES

09 51 10 Suspended Acoustical Ceiling 09 91 00 Painting 09 91 13 Exterior Repainting

00 01 10 - 2

DIVISION 10 – SPECIALTIES (NOT USED)

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)

DIVISION 21 - FIRE SUPPRESSION (NOT USED)

DIVISION 22 – PLUMBING (NOT USED)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 10 Mechanical General Provisions 23 05 40 Supports and Anchors 23 05 93 Testing, Adjusting and Balancing 23 07 00 Mechanical Insulation 23 09 13 HVAC Instrumentation 23 09 93 Automatic Control Sequences 23 31 13 Ductwork 23 33 00 Duct Accessories 23 34 23 Power Ventilators 23 34 24 Energy Recovery Ventilator 23 37 13 Diffusers, Registers and Grilles

DIVISION 26 - ELECTRICAL

26 05 00 Basic Electrical Requirements 26 05 19 Building Wire and Cable 26 05 33 Conduit 26 05 34 Boxes 26 24 16 Panelboards 26 27 26 Wiring Devices

DIVISION 27 – COMMUNICATIONS (NOT USED)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY (NOT USED)

DIVISION 31 – EARTHWORK (NOT USED)

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 91 19 Landscape Preparation 32 92 20 Seeding, Maintained Areas

00 01 10 - 3

DIVISION 33 – UTILITIES (NOT USED)

DIVISION 34 – TRANSPORTATION (NOT USED)

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND

STORAGE EQUIPMENT (NOT USED)

END OF DOCUMENT

00 01 10 - 4

February 2022 Building 103 HVAC System Repairs 01 10 10 - 1

SECTION 01 10 10

GENERAL REQUIREMENTS

PART 1 GENERAL

1.01 SUMMARY OF THE WORK

A. GENERAL

1. Provide all labor, equipment, materials, and work in compliance with federal, state, and local laws, regulations, statutes, codes, and ordnances.

2. Provide all labor, equipment, materials, tools, transportation, testing, coordination, supervision, and work in compliance with 100% design Specifications and Drawings dated February 2022. The 100% design Specifications and Drawings are provided by the Government and form part of the Contract documents. All references to Specifications and Drawings are equivalent to the 100% design Specifications and Drawings provided by the Government.

3. Provide daily cleaning of construction areas including disposal of refuse and debris.

4. Provide storage and secure all property, materials, equipment, tools and items at the end of each work day. Storage must be offsite unless a written request for on-site storage is approved by the COR.

5. Construction Schedule: Provide completion of all construction activities including installations, inspections, DALT work, testing and verification, final corrective actions, and TAB work a minimum of thirty (30) calendar days prior to the contract completion date.

6. Coordination: Coordinate all construction timelines through the COR (refer to Section 01 12 10).

B. REMOVAL WORK: Provide demolition of all equipment units and items identified for removal as indicated on Drawings and as identified in Specifications, and provide proper disposal off post at Contractor's expense including but not limited to:

1. Painted plywood skirting and associated support framing around the perimeter of the facility including soil where required for access to crawl spaces.

2. Rigid insulation board and batt insulation above and between floor joists in all crawl spaces.

3. All construction debris in crawl spaces.

4. Ceiling mounted items where required for the replacement of mechanical systems (suspended ceiling tiles, grid, light fixtures, and ceiling mounted equipment).

Provide salvage and storage of all ceiling mounted items for re-installation and re-use.

5. Mechanical systems as indicated on Drawings including exhaust fans and associated hangars, supports, ductwork, and controls; existing diffusers; motorized dampers and associated controls; outside air intake caps; ductwork including hangars and supports, and connected wiring and components.

February 2022 Building 103 HVAC System Repairs 01 10 10 - 2

C. NEW WORK: Contractor shall provide all work, labor, equipment, materials, tools, transportation, testing, coordination, and supervision necessary to perform the work under this contract in compliance with Specifications and Drawings for complete, useable systems including but not limited to:

1. Closed cell spray foam insulation between floor joists to floor deck above in all crawl spaces to the full depth of the joists.

2. Densglass sheathing over all joists and beams below floor deck including taping all joints.

3. Building wrap to cover complete underside of floor deck in all crawl spaces.

4. Painted and pressure treated plywood skirting over pressure treated framing to finished grade around facility perimeter.

5. Exterior louver vents through plywood skirting and recessed window wells.

6. Backfill around facility including sloping final grade away from foundation for drainage, seeding and restoration.

7. Energy Recovery Ventilator including intake and exhaust caps, ductwork, support, power and controls.

8. Inline exhaust fan including above ceiling support and attachment to building structure.

9. New ductwork including supports, hangars, materials and appurtenances.

10. Fan control timer switch.

11. All power, circuit breakers, switches, controls, materials, support, appurtenances and connected components.

12. Re-install all relocated diffusers and grilles, and suspended ceiling items including but not limited to ceiling tiles, grid, and light fixtures.

13. Duct air leakage testing (DALT).

14. Testing, adjusting and balancing (TAB) of the new HVAC systems (energy recovery unit and exhaust fans) and re-balancing of existing HVAC systems (furnace supply air flows at diffusers) per Section 23 05 93.

D. REPAIR WORK: Contractor shall provide all tools, labor, equipment, materials, transportation, and supervision necessary to perform repairs and restoration or replacement work under this contract including but not limited to:

1. Provide repairs of walls, floors and surfaces to match existing materials and finishes (interior and exterior) including patching and filling in holes and penetrations. Provide appropriate firestop at penetrations.

2. Provide repairs of walls and surfaces to match existing materials and finishes for all openings or gaps larger than ¼” width.

3. Provide replacement of ceiling tiles, grid, and materials damaged during construction to match existing materials, finishes, and type.

4. Repair any existing surfaces, equipment, utilities, structures, and features disturbed, damaged or altered during any phase of work to match existing materials and finishes, utilities, structures and features.

February 2022 Building 103 HVAC System Repairs 01 10 10 - 3

5. Repair landscaping features damaged or altered during any phase of work to match existing landscaping features including plants, grass, lawns, flowers, trees, and shrubs.

6. Repair vehicle ruts. Level the ruts, place topsoil, and seed the disturbed areas in compliance with Specifications.

7. Repair and reinstall structures designated for temporary removal during the work including survey monuments, bench marks, reference points, and improvements.

8. Provide repair and restoration to original condition or replacement as determined by the KO for any damage that occurs during any phase of work to meet requirements as specified herein and at Contractor’s expense.

E. TEMPORARY RELOCATION: Facility representatives will provide removal and/or temporary relocation of existing moveable furniture as necessary for the completion of work. Non-moveable and extremely heavy or difficult to move furniture must remain in place.

F. PROTECTION

1. Exterior Protection: Provide protection of existing buildings, structures, utilities, improvements, vegetation and property during all phases of work.

a. Provide safety and protection measures in all areas of work to meet requirements including safeguarding against injury and to prevent damage to existing buildings, structures, utilities, improvements, vegetation, and property.

b. During all phases of work, provide protection against damage as specified herein for all of the following:

(1) Buildings and all types of property.

(2) Structures (all types including survey monuments, bench marks, and reference points).

(3) Utilities (all types of utilities, both above ground and underground).

(4) Improvements (all types including fencing, sidewalks, paved areas, roads and curbs).

(5) Vegetation (all types including landscaping, plants, grass, lawns, flowers, trees, and shrubs).

c. Damage may include unnecessary cutting, breaking, bruising, or smothering by equipment or parking of vehicles.

d. Protective measures shall include barriers, signage, coverings, temporary fencing, or other similar types of protection to meet protection and safety requirements.

G. SUBMITTALS. Provide submittals in compliance with Section 01 33 00 including Part 4 Schedule of Material Submittals and in compliance with Specifications.

H. EXISTING SITE CONDITIONS. Contractor must verify all existing site conditions prior to ordering equipment, materials and supplies, and prior to the start of construction activities.

February 2022 Building 103 HVAC System Repairs 01 10 10 - 4

1.02 FACILITIES

A. Building 103 will not be available for construction activities during the pre-construction phase. Building 103 representatives and occupants require a written advance notification a minimum of thirty (30) calendar days prior to the start date of construction activities.

After Building 103 occupants have vacated the facility, then the facility will be available for construction activities.

B. Access: The Contractor and all subcontractors must coordinate access through the DPW COR and through the Building 103 facility representative.

1.03 ABBREVIATIONS

A. “KO” = Contracting Officer.

B. “COR” = Contracting Officer’s Representative.

C. Industry Standard Abbreviations: Refer to Specification Section 01 42 13.

1.04 TEMPORARY UTILITIES AND FACILITIES

A. General: The Contractor must provide temporary utilities and temporary construction facilities unless otherwise stated herein.

B. Power: There is 120VAC, 60 Hz electricity and lighting currently in the building(s) and available for use. Contractor must provide means of extending power from an existing source to desired point of use. This electricity used will be provided by the Government at no cost to the Contractor.

1. For all power outages and any power requirements beyond the available supply, the Contractor must provide temporary power using an appropriately sized portable generator system or a temporary power pole, and maintain power for the duration of each outage and as required for the completion of work. The Contractor is responsible for the cost of the temporary power including generator and fuel and/or temporary power pole. If the Contractor provides a temporary power pole, the cost of electricity will be provided by the Government at no cost to the Contractor. The Contractor shall contact Xcel Energy for temporary power.

C. Temporary Heating, Cooling, and Ventilation:

1. Provide and maintain all temporary heating, ventilating and cooling systems and equipment required to protect building systems, equipment and contents against freezing and environmentally related types of damage including excessive humidity, and to maintain acceptable environmental conditions during the progress of the work as determined by the COR. Remove upon completion of work at the expense of the Contractor. Coordinate temporary systems and equipment through the COR.

2. Government provided electricity will not be used for heating.

D. Temporary Telephone Service

1. If the Contractor requires phone service for this project, the Contractor must contact the phone company business office:

Century Telephone 205 5th Avenue LaCrosse, Wisconsin 54601

February 2022 Building 103 HVAC System Repairs 01 10 10 - 5

(800) 872-4017

2. The Contractor shall pay for all telephone installation, maintenance, removal, and usage charges.

3. The Contractor is responsible for providing and paying for any and all subcontractor’s telephone usage and calls.

4. Existing telephones owned or rented by the Government will not be used by the Contractor under any circumstances.

E. Temporary Water

1. Contractor shall provide an electronic written request for temporary water supply to Fort McCoy DPW (Directorate of Public Works).

2. Water for construction purposes will be provided by the Government and will be available from an existing water connection in areas where work is scheduled to be performed. Capacity is estimated to be not less than 10 GPM at 45 psi. Water is city water quality and contains sodium hypochlorite.

3. The Contractor shall provide anti-siphon and backflow prevention devices on all temporary water connections at Contractor’s expense. Proof of certification is required.

4. Contractor shall not cause water to be wasted or left running when not in use.

Contractor shall repair leaks immediately. Freeze protection shall be provided by the Contractor at all times when freezing is possible.

F. Temporary Sanitary Facilities

1. Existing sanitary facilities in Government buildings shall not be used by the Contractor’s personnel.

2. The Contractor shall be responsible for providing temporary toilet and sanitary facilities at Contractor’s expense. The Contractor shall pay rental fees and cleaning charges, and shall remove the facilities promptly when the project is completed.

3. The COR or Construction Inspector shall approve the site location for all temporary sanitary facilities.

4. Contractor shall maintain all such temporary sanitary facilities in a clean and sanitary condition at all times.

G. Barriers and Fences

1. Contractor shall provide, install, maintain, and remove suitable barriers to prevent public entry and to protect the work site.

2. Such barriers shall be erected to provide a safety barrier around such portions of the project that could cause injury or destruction of property and to provide general security for the affected project site.

3. Materials to be used are at the Contractor’s option and expense.

4. Barriers and fence shall be posted with appropriate warning signs. Place warning signs at the construction area perimeter designating the presence of construction hazards requiring unauthorized persons to keep out. Signs must be placed on all

February 2022 Building 103 HVAC System Repairs 01 10 10 - 6 sides of the project, with at least one sign every 300 feet. All points of entry shall have signs designating the construction site as a hard hat area.

5. Fencing shall be provided along the construction site at all open excavations and tunnels to control access by unauthorized people. Fencing must be installed to restrain a lateral force of at least 200 pounds.

H. Security

1. The Contractor shall provide all materials, labor, and equipment to protect the project site from theft and vandalism.

2. Existing Government buildings and facilities shall be protected by the Contractor during the contract when the work involves openings into existing Government buildings. The degree of protection shall not be less than what currently exists.

3. The Contractor shall provide temporary doors, locks, and barricades to prevent unauthorized access to the construction site and existing buildings.

4. Storage of all types of equipment, tools, construction materials, and personal property is at the risk of the Contractor.

I. Access Roads and Parking Areas

1. Contractor’s private vehicles shall be parked at locations designated by the COR.

2. All construction vehicles and Contractor’s private vehicles will be parked in an orderly manner at all times and will not block normal traffic in the area. Private vehicles belonging to the contract personnel will be parked in designated parking areas and in no case on grass areas, adjacent to buildings, or along streets.

3. Contractor is responsible for any snow removal required for access or site work.

J. Access and General Protection/Security Policy and Procedures

1. The Contractor and all associated subcontractors and subcontractor’s employees shall provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. The contractor and all associated subcontractors' employees shall also comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The Government may require monthly participation in the Installation Random Antiterrorism Program.

K. Contractors Requiring Common Access Card (CAC)

1. Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or

February 2022 Building 103 HVAC System Repairs 01 10 10 - 7 higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI.

L. Traffic Work

1. In the event that parking areas or spots are blocked, provide coordination, signage, and traffic management in compliance with Fort McCoy requirements. Coordinate blocking and use of parking areas or spots through the COR.

M. Waste Reporting

1. The Army has established the requirement for a 50% minimum diversion rate by weight of C&D waste from landfill disposal. In order to achieve those results, the Contractor shall submit a solid waste management plan as a required submittal for projects costing over $100,000. At a minimum, the solid waste plan shall include the anticipated waste streams and disposal/recycling facilities. No work shall begin until the Contractor has an approved plan.

2. The Contractor shall submit reports to the Contracting Officer quantifying the total pounds of hazardous, universal, recycled, and non-regulated waste disposed of during the duration of the contract. Contractor shall also submit material(s) disposal location(s).

3. Reporting shall be specific to the month in which waste was disposed of and separated per waste type for Fort McCoy’s reporting requirements.

4. Reporting for recycled waste shall also be specific to how much revenue the Contractor received for each type of recycled material.

N. Refuse Disposal and Recycling

1. Provide all solid waste disposal associated with this contract including but not limited to the container delivery, removal, and disposal fees. Items included under this Section are all solid wastes as defined by Wisconsin State Statute 289.01 (33).

These items shall be disposed in a licensed sanitary landfill or recycling center in compliance with State of Wisconsin Administrative Code Chapter NR500 series.

2. The Contractor is allowed to use Fort McCoy recycling facilities for concrete, mixed paper, plastics (PETE#1 and HDPE#2), cardboard, trees/woody waste, metals, and aluminum cans. If materials are recycled at Fort McCoy, provide all labor and delivery to the designated recycling facilities. Materials shall be weighed and weigh slips provided to the COR to receive credit toward the 50% requirement in “Waste Reporting” above. Materials not weighed can be delivered to the designated recycling facilities, but the material will not count toward the 50% waste reporting requirement.

3. Provide for the recycling of all other construction/demolition debris including drywall, lumber, reinforcing steel, piping, wiring, brick, plaster, wall board, February 2022 Building 103 HVAC System Repairs 01 10 10 - 8 roofing material, insulation, plumbing fixtures, doors, and windows to the greatest extent possible. Utilize only licensed recycling facilities.

4. Provide a certificate of recycling for universal waste as defined in Wisconsin Administrative Code Chapter NR600.

O. Material Sales

1. Materials shall not be stockpiled for sale purposes on Post.

2. Public advertised sales of materials will not be permitted on Post.

3. Prior arranged sale of materials may be permitted on Post.

1.05 QUALITY CONTROL

A. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with the Contract Clause titled “Inspection of Construction.” The Contractor must provide a Contractor Quality Control (CQC) Plan to cover all construction operations (both onsite and offsite) in compliance with requirements as specified herein including work by subcontractors, fabricators, and suppliers, and key the CQC plan to the proposed construction sequence. The CQC plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. The site project superintendent is responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract.

B. All plumbing work shall be performed by a state certified journeyman plumber. All plumbing work shall be supervised full time on site by a state certified Master plumber.

Proof of current certification is required. The cost of the work shall include all State permit fees and approval for the installation of backflow prevention devices.

C. All electrical work and electrical apprentices shall be supervised full time on site and at all times during the work by a state certified journeyman electrician. Electrical apprentices shall be in a recognized electrical apprenticeship training program. All electrical work shall be overseen by a state certified Master electrician. Proof of current state certification is required prior to the start of construction. The cost of the work shall include all State permit fees and approval for the installation of electrical equipment and devices.

D. All work associated with air-conditioning refrigerant shall be conducted by an Air- Conditioning Refrigerant Institute Certified Technician; Type-Universal. All work shall also be conducted in accordance with Federal Law “40 CFR Part 82 subpart F and Parts 273, 279, and 761” and U.S. Environmental Protection Agency “Clean Air Act (1990) Section 608” and all EPA final regulations associated with section 608.

E. All testing, adjusting and balancing (TAB) work must be performed by an independent testing agency and/or balancing contractor that specializes in testing, adjusting and balancing of mechanical systems and certified by AABC or NEBB, and all tester personnel performing TAB work must be currently certified by AABC or NEBB with a minimum of three (3) years documented work experience in balancing HVAC systems in compliance with Section 23 05 93. Per Section 23 05 93, all TAB work must be performed under the supervision of an AABC Certified Test and Balance Engineer, or NEBB Certified Testing, Balancing and Adjusting Supervisor.

F. Submit product data prior to ordering products and prior to the start of construction activities. Obtain approval of all items for installation prior to the start of construction

February 2022 Building 103 HVAC System Repairs 01 10 10 - 9 activities. Provide product data submittals for all products indicated or specified for installation in compliance with Specifications and Section 01 33 00 Submittals.

1.06 REFERENCED DOCUMENTS (ALL TYPES)

A. References are made in these Specifications to published laws, codes, standards, regulations, ordnances, and specifications, and to manufacturers’ societies, associations, and other standards. All references are included in these Specifications as if written in their entirety.

B. Where referenced documents are not specified by date, the most recent edition published as of the bid or proposal request date shall apply. UFC design guides set a minimum requirement for each standard that may be exceeded by a more recent standard as referenced in specification sections.

C. UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.

1.07 MANUFACTURER’S PUBLISHED DATA AND MANUALS

A. Provide all product data documentation in compliance with each specification section for the specific product to be installed and Section 01 33 00 Submittals.

B. Provide one (1) PDF copy of each type of product data documentation for all items of equipment including complete catalog ordering nomenclature sheet, descriptive documents, instructions and checklists, shop drawings, and manuals.

C. Provide one (1) PDF copy of equipment maintenance and operation manuals for all new equipment units.

D. Drawings:

1. Shop drawings including equipment dimensions, materials and schematics.

2. Supplement product data with drawings as necessary to clearly illustrate:

a. Relations of component parts of equipment and systems.

b. Control and flow diagrams.

3. Coordinate drawings with the information in project record documents to assure correct illustration of completed installation.

E. Written text, as required to supplement product data for the particular installation:

1. Organize in consistent format under separate headings for different procedures.

2. Provide logical sequence of instructions for each procedure.

F. Content, for each unit of equipment and system, as appropriate:

1. Description of unit and component parts;

a. Function, normal operating characteristics, and limiting conditions.

b. Performance curves, engineering data, and test results.

c. Complete nomenclature and commercial number of replaceable parts.

2. Operating procedures;

a. Start-up, break-in, routine, and normal operating instructions.

b. Regulation, control, stopping, shut-down, and emergency instructions.

February 2022 Building 103 HVAC System Repairs 01 10 10 - 10

c. Summer and winter operating instructions.

d. Special operating instructions.

3. Maintenance procedures;

a. Routine operations.

b. Guide to “Trouble-Shooting.”

c. Disassemble, repair, and reassemble.

d. Alignment, adjusting, and checking.

4. Servicing and lubrication schedule including a list of required lubricants.

5. Manufacturer’s published and written operating and maintenance instructions.

6. Description of sequence of operations by control manufacturer.

7. Original manufacturer’s parts list, illustrations, assembly drawings, and diagrams required for maintenance:

a. Predicted life of parts subject to wear.

b. Items recommended to be stocked as spare parts.

8. As-installed control diagrams by controls manufacturer.

9. Each Contractor’s coordination drawings:

a. As-installed color coded piping diagrams.

b. As-installed color coded electrical and systems diagrams.

10. Charts of valve tag numbers, with location and function of each valve.

11. List of manufacturer’s spare parts, manufacturer’s current prices, and recommended quantities to be maintained in storage.

12. Other data as required under pertinent sections of specifications.

G. Provide and prepare additional data upon request of the KO or COR as needed for the training of Government or maintenance personnel.

1.08 DELIVERY AND STORAGE

A. Contractor must ensure that all equipment, materials, and items for installation are stored in an environment that will not cause rusting, warping, staining, or any type of damage or physical breakage. Damaged or defective equipment, materials, and items for installation must be replaced at Contractor's expense.

B. All work, labor and equipment required for loading, unloading, transporting, and moving materials shall be provided by the Contractor.

C. Storage buildings will not be provided by the Government.

D. If onsite storage is required, the Contractor must submit a written request to the COR for a designated storage area at or near the facility. If approved, the Contractor is not authorized to use any other area outside of the designated storage area as directed by the COR for the storage of materials, equipment, tools, property, and other items. The Contractor, and all contractor and subcontractor employees, are responsible to secure all types of personal property, materials, equipment, tools and items at all times.

February 2022 Building 103 HVAC System Repairs 01 10 10 - 11

1.09 TRAILERS OR STORAGE BUILDINGS, INCLUDING OFFICE TRAILERS

A. Trailers or storage buildings will be permitted, where space is available, subject to the approval of the COR. All costs for trailers or storage buildings including loading, unloading, installation, delivery, removal and transportation are the Contractor’s responsibility.

B. The trailers or buildings shall be in good condition, free from visible damage, rust, and deterioration, and meet all applicable safety requirements. Trailers shall be roadworthy and comply with all appropriate State and local vehicle requirements. Failure to maintain storage trailers or buildings to these standards shall result in the removal of non-complying units at the Contractor's expense.

C. A sign not smaller than 2-feet by 2-feet shall be conspicuously placed on the trailer depicting the company name, business phone number, and emergency phone number.

D. Trailers shall be anchored to resist high winds and must meet applicable state and local standards for anchoring mobile trailers.

E. Provide metal or fiberglass skirting completely around office trailers within thirty (30) calendar days of trailer installation on the lot and after receipt of approval from the COR.

F. Grass and weeds shall be cut weekly or as needed to a height not to exceed three inches.

Trash shall be picked up and disposed of properly on a daily basis.

G. The Contractor shall be responsible for the installation and removal of all temporary utility connections at no cost to the Government.

1.10 STORAGE SITE

A. All stored materials must be stacked or arranged to protect against damage in compliance with manufacturer’s published data and recommendations. Storage equipment and materials must be neatly stacked at all times.

B. Trash shall be picked up and properly disposed of on a daily basis.

C. Grass and weeds shall be cut on a regular basis to a height not to exceed three inches. In the Cantonment, uncut height shall not exceed 6 inches. Outside the Cantonment, uncut height shall not exceed 12 inches.

D. Welding equipment shall be handled and stored in compliance with applicable regulations.

E. Fire extinguishers shall be provided where flammable liquids are stored.

1.11 SCHEDULING AND COORDINATING WORK

A. Contractor shall submit the proposed construction schedule in compliance with the FAR clause entitled Schedule for Construction Contracts and in compliance with Specification Section 01 33 00 Submittals. Attached to the construction schedule shall be a horizontal bar chart with a separate line for each major portion of work, identifying the first work day of each week. Distribute copies of the approved schedule to the project site file, subcontractors, suppliers, and other concerned parties.

1. The Contractor shall prepare and submit a project schedule in the form of a Gantt Chart for review within twenty (20) calendar days of award and an updated project schedule for review a minimum of five (5) working days prior to a Pre-construction

February 2022 Building 103 HVAC System Repairs 01 10 10 - 12

Conference (pre-con) meeting. This schedule shall show at a minimum critical path, float, owner of float, milestones, baseline, elements of work, and duration of each significant element of work. The Contractor shall obtain approval for the project schedule prior to the start of construction.

2. The Contractor shall maintain the original schedule/Gantt Chart throughout the life of the project and show actual schedule achievement in tandem with the original schedule and shall update the approved schedule bi-weekly to display time gained or lost against the original schedule. If in the opinion of the Contracting Officer the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve progress, including those steps that may be required by the Contracting Officer, without additional cost to the Government. The Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved increased effort shall regain the original schedule of progress. FAR 52.236-15

B. The Contractor shall be specifically responsible for the coordination of all phases of work under this contract within the approved construction schedule. The Contractor must phase the work to minimize disruptions to normal duty operations. The Contractor must provide preparation, scheduling, and coordination for all installations, testing, and work as specified herein and in compliance with associated Specifications. The Contractor must provide cleaning of work areas at end of each work day. Utility services must be maintained during construction activities to prevent damage to building contents and systems and to maintain acceptable environmental conditions.

C. The Contractor may be required to allow Government personnel or other Contractors to carry out work within the work site. Such work will be scheduled and coordinated through the COR.

D. The Contractor shall provide a phone number and address where a key, and/or approval, to enter may be obtained for the work sites during the work day for times when the Contractor may not be at the work site.

E. Outages: Unscheduled outages are not authorized. Scheduled outages shall be shown on the schedule provided. Emergency utility outages shall be reviewed by the Contracting Officer/Inspector prior to the start of the utility outage. Expenses and damages caused by unscheduled or unapproved utility outages shall be at Contractor's expense.

1. For all outages, provide an advance written notification (electronic and hard copy) to the KO a minimum of ten (10) calendar days prior to the start of the proposed outage. Written notification must include the date of each proposed outage; type and purpose of each outage; a list of all impacted systems during the outage; full name of on-site outage supervisor with contact information, and the estimated duration of outage.

2. The Contractor shall provide advance coordination for all outages with Fort McCoy DPW and all impacted utilities in compliance with Specifications and as specified herein.

1.12 WARRANTIES

February 2022 Building 103 HVAC System Repairs 01 10 10 - 13

A. All systems, materials and workmanship shall be warranted by the Contractor for a period of not less than one year from the date of final acceptance by the Government, except when longer warranties are required from the Contractor as stated in each specification section.

B. All manufacturer warranties for new equipment, materials, devices, appurtenances, and connected components must comply with the warranty requirements specified in each Specification section.

C. For products and materials that are normally warranted by the manufacturer or supplier for more than one year, the Contractor shall provide the Government with a written warranty, or certification, indicating the Manufacturer’s or the supplier’s warranty terms and conditions.

D. The Contractor shall populate and submit a Warranty Item Tracking spreadsheet for materials and workmanship cover under Paragraph 1.12 A. The Contractor shall use PART 4 WARRANTY ITEM TRACKING SHEET located at the end of this Section as a template to prepare and populate the warranty item tracking spreadsheet submittal. The spreadsheet shall include all major equipment units and products for installation and project work, and each equipment product provided with an extended warranty equipment. Extended warranty shall be defined as anything beyond one calendar year from the Beneficial Occupancy Date. Item information will include the following: warranty item, equipment description, make, model, serial number, capacity, capacity unit of measure, warranty start date, warranty length, and scheduled maintenance to meet warranty requirements.

1.13 CONTRACT SUPERINTENDANT

A. Per FAR 52.236-6, at all times during the performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the work a competent superintendent who is satisfactory to the Contracting Officer, has authority to act for the Contractor, and shall be on-site during any activity being performed on the work site.

1. The Contractor shall provide written designation of a qualified person as the Superintendent five (5) working days before the Preconstruction Meeting.

2. The Contractor shall provide documentation demonstrating the experience and ability of the Contractor's Superintendent submission to successfully manage a contract with a value from between $500,000 to $1,000,000 and of scope similar in complexity to this project. Selectee shall have no less than five years of successful experience in direct supervision of major construction for a General Contractor.

3. The Government reserves the right to reject the Contractor's selection of Superintendent based upon that selectee's qualifications and level, type, depth, scope, or length of experience.

PART 2 PRODUCTS

2.01 EXISTING EQUIPMENT AND MATERIALS

A. Equipment and materials to be demolished:

1. All equipment, materials, devices, appurtenances and components identified for demolition and removal from existing facilities and areas shall be the responsibility of the Contractor to remove completely from Fort McCoy.

February 2022 Building 103 HVAC System Repairs 01 10 10 - 14

2. Under limited conditions and as specified on the plans, deliver scrap metal/materials to a location designated by the COR. Contractor will be responsible for hauling all demolished materials to the designated locations.

B. Existing materials may only be reused/relocated as specifically allowed per the contract drawings and specifications.

2.02 NEW EQUIPMENT, MATERIALS, CONTROLS, POWER, AND APPURTENANCES

A. All new equipment, materials, controls, power, appurtenances, and connected components must be the standard products of a manufacturer regularly engaged in the manufacture of those products and all products for installation must comply with requirements of Specifications. Each product for installation must have a minimum history of five years of dependable and satisfactory use.

B. All new equipment, materials, controls, and connected components shall be of the latest type or model currently being produced by the manufacturer.

C. All products of the same type shall be from the same manufacturer including all integrated or internal components.

D. Seconds, refurbished, or otherwise substandard equipment, materials and components are prohibited on Fort McCoy and are not authorized for installation. Equipment units not manufactured within one year of the contract award date are not authorized for installation.

E. For submittal requirements, refer to Specifications including but not limited to Section 01 33 00. For all new equipment units and materials, provide manufacturer catalog order sheet with complete nomenclature for Government review (with product data submittals).

PART 3 EXECUTION

3.01 INSPECTION

A. The Contractor shall not begin successive phases of work until an inspection has been completed and the work is accepted by the COR. Notify the COR forty eight (48) hours prior to completing a phase requiring inspection.

1. Any work that will be covered by successive work must be inspected prior to performing successive work.

2. Work to be covered includes, but is not limited to, underground utilities, utilities located behind walls, and work located below finish floors.

B. When the Contractor considers the work complete, submit written certification confirming:

1. Contract documents have been reviewed.

2. All project submittals have been completed and submitted for review including construction redlines properly completed on asbuilt drawings.

3. Work has been inspected by the Contractor for compliance with the contract.

4. Mechanical systems and equipment have been checked and tested, DALT and TAB work have been completed by the independent testing agency.

5. All work is complete and ready for final inspection.

6. Contractor shall provide a requested date for punch list inspection to the Contracting Officer, in writing, not less than seven (7) working days prior to the

February 2022 Building 103 HVAC System Repairs 01 10 10 - 15 proposed date of inspection. Punch list inspections shall be scheduled and conducted to ensure compliance with the contract completion date.

C. The COR will coordinate with the members of the inspection party and establish the punch list inspection date.

1. Should the COR consider the work incomplete or defective, a written punch list of deficiencies will be provided to the Contractor from the Contracting Officer.

2. The Contractor will be given ten calendar days to remedy all deficiencies and complete corrective actions, unless otherwise determined by the Contracting Officer.

3. The Contractor shall provide a second written certification after remedy of all deficiencies is complete and request re-inspection to be scheduled not later than the ten (10) calendar days from the date of certification, unless otherwise determined by the Contracting Officer. This re-inspection shall also be completed during the contract performance period to be in compliance with the Contract.

4. If any further re-inspections are required the Contractor may be charged the additional cost of the inspections.

5. Final acceptance of the work occurs upon the Contracting Officer’s acceptance of the work subsequent to successful final inspection by the COR and receipt of all contract requirements.

6. If final acceptance does not occur prior to the contract completion date, liquidated damages may be applicable in compliance with the liquidated damaged clause.

D. If the Government requires beneficial occupancy of the facility prior to completion of the work by the Contractor, an inspection shall be conducted by the COR to determine whether the completed work meets requirements, to document all deficiencies and any work that is not complete, and to accept completed work that meets all requirements without any deficiencies. The Contractor will then complete the remaining work and correct all deficiencies.

3.02 TRANSITIONS FROM EXISTING TO NEW WORK

A. When new work abuts or finishes flush with existing work, make a smooth transition.

Patched work shall match existing adjacent work in texture and appearance.

B. When finished surfaces are cut in such a way that a smooth transition with new work is not possible, terminate existing surface along a straight line at a natural line of division and provide trim appropriate to the finished surface.

3.03 TESTING AND VERIFICATION

A. Provide all types of inspections, checks, tests, verifications, DALT, TAB, documentation, and submittals in compliance with Specifications and as specified herein.

B. After installations of new systems, equipment, materials, controls, ductwork and appurtenances are completed, the Contractor shall provide and conduct pre-start up visual inspections, functionality and operating tests, and verifications in compliance with Specifications and as specified herein.

C. Tests must demonstrate that the installation, performance, operation, and other testing requirements of Specifications have been met. Tests shall be performed in the presence of the COR.

February 2022 Building 103 HVAC System Repairs 01 10 10 - 16

D. Contractor must provide all work in compliance with the manufacturer’ published data and instructions including pre-operation checks, startup checklist and procedures, inspections, operational checks, and verifications.

E. Contractor must provide duct air leakage testing (DALT) prior to TAB work. Contractor must provide testing, adjusting and balancing (TAB) of mechanical equipment and systems in compliance with Section 23 05 93.

3.04 ENVIRONMENTAL CONSIDERATIONS

A. Provide removal and proper disposal of all hazardous waste encountered during the work in compliance with local, state and federal laws, statutes and regulations.

3.05 HOT WORK PERMIT

A. Hot work permits are required for all work activities which generate or have the potential to generate heat, sparks, or open flames such as abrasive blasting, burning, brazing, cutting, grinding, powder-actuated tools, hot riveting, soldering, thawing, activities, welding, or any similar operations capable of initiating fires or explosions.

B. The Contractor must obtain a hot work permits prior to performing any of the activities described in Paragraph 3.05 A. Hot work permits may be obtained from the Fire Department in Building 1680. The non-emergency telephone number is 608-388-4151.

C. The Contractor must provide a copy of all hot work permits in compliance with Section 01 33 00.

3.06 CLEANING

A. During Construction:

1. The Contractor shall keep work and storage areas clean at all times, and shall provide daily cleaning to keep work areas clean and free from accumulations of refuse and waste materials. The Contractor shall ensure all affected areas are “broom clean” at the end of each work day. Before completing the work, the Contractor shall remove from the work and premises all types of rubbish, tools, scaffolding, equipment, and materials that are not the property of the government.

Upon completing the work, the Contractor shall leave the work area in a fully cleaned, neat, and orderly condition, satisfactory to the Contracting Officer. FAR 52.236-12

B. Dust Control

1. Clean interior spaces prior to the start of finish coatings and continue cleaning on an as-needed basis until work is finished.

2. Schedule operations so that dust and other contaminants resulting from the cleaning process will not fall on wet or newly-coated surfaces.

3. The amount of dust resulting from demolition or excavation operations shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding areas. The use of water will not be permitted when it will create or result in hazardous or objectionable conditions such as ice, flooding, and pollution.

4. All building areas including equipment, materials, ductwork and diffusers shall be cleaned of all dust and dirt resulting from the performance of the work under this contract.

February 2022 Building 103 HVAC System Repairs 01 10 10 - 17

C. Final Cleaning

1. Final cleaning shall be performed at completion of each phase of construction and completed prior to punch list inspection.

2. Clean interior and exterior surfaces exposed to view.

a. Remove temporary labels, stains, and foreign substances.

b. Polish transparent and glossy surfaces.

c. Vacuum carpeted and soft surfaces. Mop floors.

d. Wash windows and dust walls and trim.

e. Clean equipment and fixtures to a sanitary condition.

f. Clean or replace filters of mechanical equipment.

g. Clean roofs, gutters, downspouts, and drainage systems.

3. Clean project site.

a. Sweep paved areas.

b. Rake clean other surfaces.

4. Remove waste and surplus materials, rubbish, and construction facilities from buildings areas (interior and exterior) and from the project site and storage area.

3.07 ASBUILT AND RECORD DRAWINGS

A. AsBuilt Drawings:

1. Provide complete asbuilt drawings with redlines incorporated into the CAD drawings and submit for Government review in compliance with Specifications.

2. With red pencil or red ink, neatly inscribe all COR approved changes to show final locations and types of all equipment, ductwork, materials, devices, power, controls, support structures, and similar work.

3. With red pencil or red ink, neatly inscribe the location of all existing and new exterior utilities. The locating may be accomplished by traditional survey methods or by global positioning system (GPS) satellite equipment supplemented by traditional methods where required. Include the size, material, and depth.

4. With red pencil or red ink, neatly inscribe the routing and locations of all new wire and conduits.

5. Locations may be from existing buildings or from base…