W911SA22B2010 ATTACHMENT 5 - TE-5 Construction.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- FHL Sidewalk Repairs, Jolon, CA 93928 Federal contract opportunity
- Solicitation number
- W911SA22B2010
About this file
This document contains a federal contract solicitation and supporting construction cost estimate template. The solicitation is for sidewalk repairs at Fort Hunter Liggett in Jolon, California. Contractors must provide all labor, materials, equipment, transportation and supervision to complete the work described in the statement of work. A mandatory site visit is scheduled for June 14th, where the point of contact will only address logistics and not answer questions about the solicitation scope or terms. All such questions must be submitted after the site visit. The construction cost estimate template includes three sheets to itemize estimates for materials, labor, equipment, and other direct costs to derive a total proposed contract price. Contractors must utilize this template to submit their cost proposals in response to the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA22B2010 OF 1419 Page 1 - 3 7-19-22.pdf | ||
| W911SA22B2010 ATTACHMENT 2 - SOW - Sidewalk Repair1 Revised.pdf | ||
| W911SA22B2010-0001 Solicitation Amendment.pdf | ||
| W911SA22B2010 Sign-in sheet for site visit.pdf | ||
| W911SA22B2010 Solicitation.pdf | ||
| W911SA22B2010 ATTACHMENT 3 - FHL Side walk Drawings.docx | DOCX document | |
| W911SA22B2010 ATTACHMENT 1 - Wage Determination SAM.pdf | ||
| W911SA22B2010 ATTACHMENT 2 - SOW - Sidewalk Repair1.pdf | ||
| W911SA22B2010 ATTACHMENT 4 - AT-OPSEC Cover Sheet (24 Oct 14) FHL Sidewalk Repairs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| OMB No. 0704-0193 | |||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||
| MS Excel V5.0 1994 | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |
| ERROR:#VALUE! | ||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION |
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QTY | MNHRS | AVERAGE | DIRECT | LINE | |||
| NO. | MEA | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 001 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 002 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 003 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 004 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 005 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 006 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 007 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 008 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 009 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 010 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 011 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 012 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 013 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 015 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| SUM | S H E E T T O T A L | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
SOLICITATION NUMBER ______________
&"Arial,Bold"FOR OFFICIAL USE ONLY
Sheet 2
| OMB No. 0704-0193 | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| MS Excel V5.0 1994 | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| 0 | 0 | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| 0 | ERROR:#VALUE! | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| 0 | 0 | 0 | ||||||||
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QTY | MNHRS | AVERAGE | DIRECT | LINE | |||
| NO. | MEA | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 016 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 017 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 018 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 019 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 020 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 021 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 022 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 023 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 024 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 025 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 026 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 027 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 028 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 029 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 030 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| SUM | S H E E T T O T A L | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&"Arial,Bold"FOR OFFICIAL USE ONLY
Sheet 3
| OMB No. 0704-0193 | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| MS Excel V5.0 1994 | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| 0 | 0 | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| 0 | ERROR:#VALUE! | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| 0 | 0 | 0 | ||||||||
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QTY | MNHRS | AVERAGE | DIRECT | LINE | |||
| NO. | MEA | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 031 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 032 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 033 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 034 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 035 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 036 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 037 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 038 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 039 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 040 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 041 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 042 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 043 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 044 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 045 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| SUM | S H E E T T O T A L | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&"Arial,Bold"FOR OFFICIAL USE ONLY
Sub-Total
| OMB No. 0704-0193 | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| MS Excel V5.0 1994 | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| 0 | 0 | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| 0 | ERROR:#VALUE! | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| 0 | 0 | 0 | ||||||||
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QTY | MNHRS | AVERAGE | DIRECT | LINE | |||
| NO. | MEA | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| SHEET 1 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| SHEET 2 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| SHEET 3 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
SUM S H E E T T O T A L LS $ - 0 $ - 0 $ - 0 $ - 0
SOLICITATION NUMBER _________________
&"Arial,Bold"FOR OFFICIAL USE ONLY
REVERSESIDE
| INSTRUCTION FOR COMPLETING THE CONSTRUCTION COST ESTIMATE |
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to |
| permit itemizing of all direct costs. |
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards -- SY, cubic yards -CY, square |
| feet-SF, linear feet-LF, board feet-BF, each-EA, pound -LB). |
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be fur- |
| nished by the Government, Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will |
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. |
Col 4 and 5 Material Costs. Enter unit material cost (Col 4) to be supplied. The total cost (col 5) is automatically calculated (Col 3 * Col 4).
| Col 6, 7 and 8 Labor Costs. In Col 6 edit the existing equation by entering manhours per unit * Col 2. In Col 7, enter the average wage rate |
| for the discipline involved. Col 8 is automatically calculated (Col 6 * Col 7). |
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract |
| and of significant dollar value. |
Col 10 Line Total. Col 10 is automatically calculated.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus OH & P will be shown on the last page as follows.
TOTAL MATERIAL COSTS $ - 0
TOTAL LABOR COSTS $ - 0
TOTAL OTHER DIRECT COSTS $ - 0
TOTAL DIRECT COSTS $ - 0
LABOR BURDEN _________% ERROR:#VALUE!
OVERHEAD _________% ERROR:#VALUE!
PROFIT _________% ERROR:#VALUE!
BID BOND _________% ERROR:#VALUE!
TOTAL PRICE ERROR:#VALUE!
DATE NAME
| TITLE | BY | ||
| (Signature) | |||
| INSTRUCTIONS TO ESTIMATORS |
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. |
| 2. In addition to the specific information required by this form, incorporate in and submit with this |
| form any additional data, supporting schedules, or substantioation which are reasonably required for the conduct of an appropriate review |
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of |
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, it is critical the estimator's "estimating process" is documented.