0011560769

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er questions received and update Attachment 2 Draw ings and Attachment 3 Specifications.

1. CONTRACT ID CODE PAGE OF PAGES

1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Jan-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SA21Q2001

X 9B. DATED (SEE ITEM 11)

21-Dec-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jan-2021

CODE

MICC - FT MCCOY

BLDG 1108 SOUTH R ST

FORT MCCOY WI 54656-5153

W911SA 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911SA21Q2001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 26-Jan-2021 02:00 PM to 02-Feb-2021 02:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

QUESTIONS AND ANSWERS

Question (1) Will a tax exempt certificate be provided to the awarded prime contractor for this project?

(Q1) Government Response: No.

Question (2) Drawing E1.2 “Panel A”. What side do the existing conduits enter into the panel through (i.e. bottom, top, both.)

(Q2) Government Response: There was not a wall cavity investigation to determine position of conduits. Provide a new panelboard in compliance with Specifications and Drawings including knockouts on located on both bottom and top sides of panelboard enclosure (minimum size knockout for the feeder conduit is 1 ½”). Per original facility design documents, the existing feeder conductors are 4 - #3 copper & 1 - #8 ground enclosed in 1 ½” conduit. Refer to Specifications and Drawings dated January 2021 for all Government responses to Contractor questions.

Question (3) The Specs call for EMT above lay in ceilings, but do not indicate wiring methods above hard ceilings in the sleeping areas. Would MC Cable or Romex be acceptable? Current wiring methods in hard ceilings?

(Q3) Government Response: For clarification, provide EMT conduit where conduits are exposed and provide metal clad (MC) cables in all plenum and above ceiling spaces for new lighting circuits as indicated on Drawings. All installations of the same type must be consistent with the same equipment and materials, appropriately sized for each branch circuit. Romex is not acceptable for this project and is not approved for installation.

Question (4) Is it the intent to “fish” existing hard ceilings from the attic, or remove and replace the hard ceilings in the sleeping rooms with sheetrock?

(Q4) Government Response: Provide new conductors and cables fished in the plenum spaces above dropped ceilings and above hard ceilings, and fished down wall cavities as required for the completion of work. All hard ceilings must remain in place. Openings for new luminaires must be measured, marked, and then cut carefully into hard ceilings to minimize damage. Existing center fixture in each sleeping room area must be removed and ceiling openings must be repaired to match existing materials, paint, and finishes.

Question (5) For the flush mounted lights in the masonry wall, is it the intent to remove completely and patch the masonry wall?

(Q5) Government Response: Yes, provide complete removal of all flush mounted light fixtures (recessed into masonry walls in sleeping room entry ways) in compliance with Specifications and Drawings including all segments of wiring extending from switches to fixtures. For clarification, all masonry walls affected by the work must be repaired to match existing masonry materials, paint, and finishes (including all locations of flush mounted light fixtures and in the corridor where the new panelboard must be installed in the masonry wall and flush mounted).

Question (6) Can the new panel sit in the surface or does it need to be recessed?

(Q6) Government Response: The new Panel A must be flush mounted (recessed in the wall cavity) in the same location as the existing panelboard and re-use existing conductors and conduits in compliance with Specifications and Drawings. For clarification, the masonry wall must be modified to fit the size of the new panelboard (minimum 42 spaces) and repaired after installation to match existing wall materials, paint, and finishes. Refer to the Government Response to Question 5 above.

Question (7) Pg. E1.2 is a fixture label "[2]", missing in the lounge?

(Q7) Government Response: Per Drawing E1.2, the description for Keynote 2 is “typical” which means Keynote 2 applies to all fixtures of the same type in the same room as shown on the floor plan; for clarification, Keynote 2 applies to all type A and all type B light fixtures in all rooms and spaces.

Question (8) Will you provide matching paint for the bedrooms?

(Q8) Government Response: No, the Government will not provide paint. The Contractor must provide all paints, materials, labor, tools, and equipment for completion of repairs in compliance with Specifications and Drawings dated January 2021. All paints, primers and materials must be low VOC type. The Contractor must provide surface preparation of all surfaces to be painted and provide field application of paints, filler materials, and coatings.

For clarification, here is a summary of the painting requirements:

Interior Paint Requirements for Gypsum Board Surfaces:

1. Primer (Latex).

2. Paint (Latex (match existing paint color, eggshell sheen, and texture).

3. If repainting entire surface area, use light splatter texture.

4. Coats of Primer and Paint: 1 coat primer (as needed) and 2 coats paint.

For concrete block wall repairs, use the following Interior Concrete Block Walls Schedule:

1. Block Filler: Match existing materials for block filler.

2. Intermediate and Top Paint Coats: Provide intermediate and top coats of Latex paint to match existing finishes (paint color, satin sheen, and texture).

Question (9) You have specified using EMT, are metallic flex tubing OR metallic MC cable acceptable?

(Q9) Government Response: Provide EMT where conduits are exposed to occupants.

Provide metal clad (MC) cables for all new lighting circuits. Provide concealed installation where possible using plenum spaces above dropped ceilings and hard ceilings and reusing existing chases in wall cavities. Note: The MC cables are required for this project to reduce the durations of disruptions to facility occupants and normal duty operations, and to minimize the duration of time required for installations. Metallic flex tubing may be used outside of occupied areas where appropriate for the type of installation.

Question (10) Are the rooms occupied? Due to extent of repairs it will be extremely difficult to accommodate ordinary life.

(Q10) Government Response: Yes, Building 1680 is the Fire Department and will be occupied during all phases of construction including all sleeping rooms. For clarification, it is not acceptable and not authorized to perform electrical work in more than two sleeping rooms at a time because all sleeping rooms are occupied. Power must be available to facility occupants at the end of each work day. Each lighting branch circuit is limited to two rooms per circuit breaker fed from Panel A in compliance with Drawings dated January 2021. All work must be carefully coordinated through the COR and Fire Department POC Curt Ladwig during all phases of construction to facilitate the work. All phasing of work must comply with Fire Department scheduling requirements.

For Painting of Ceilings and Walls: Do not paint ceilings and walls until after all electrical work is completed. After all electrical work is completed and all surfaces are repaired, coordinate the preparation and painting of ceilings and walls through the COR and to comply with the scheduling requirements of the Fire Department.

Question (11) Can we interpret the need for the UL-924 device as effectively built-in emergency option in the fixture?

(Q11) Government Response: For interior emergency lighting fixtures only, an internal transfer device is acceptable (interior fixtures only). For the exterior emergency light fixture type DE, an external transfer device in Room 136 is required. For clarification, all transfer devices must be installed and located INSIDE the building.

Question (12) Similarly for DE fixture (wallpack) we prefer to provide a mode with the emergency option. Is that acceptable?

(Q12) Government Response: No, a built-in option is not acceptable for the type DE luminaire. For the exterior light fixture type DE, an external UL-924 listed transfer device is required for installation in Room 136 as shown on Drawing E1.2. All transfer devices must be located INSIDE the building.

The following have been modified:

SUPPLEMENTAL INFORMATION

Contract Specialist:

Jim Hubert Phone: 608-388-1251 E-mail:james.k.hubert.civ@mail.mil

Contracting Officer:

Steve Bailey Phone: 608-388-6077 Email: steven.m.bailey2.civ@mail.mil

Include the following within the quote package:

1) Completed SF1442 with acknowledgement of all amendments

2) Completed Attachment 5, SF24; if quote exceeds $150,000.00

3) Any additional verification documents

Contractor POC E-mail

DUNS

TAXPAYER ID #

This solicitation is a 100% Small Business set-aside under NAICS code 238210 with a size standard of $16.5 Million.

PROJECT MAGNITUDE

The magnitude of this project is between $25,000 to 100,000.

Bid gurantee is required if quote is $150,000 or greater IAW 52.228-1

This requirement has a completion date of 180 days after notice to proceed.

Quotes can be submitted in any of the following ways:

Submitted by email to:

james.k.hubert.civ@mail.mil

A site visit is scheduled for January 7, 2021 at 10:00AM Local time.

In response to the COVID-19 pandemic and the President’s declaration of a National Emergency concerning COVID-19 on 13 March 2020, MICC Ft McCoy is following the recommended safety guidelines imposed by the World Health Organization (WHO) and the Centers for Disease Control and Prevention (CDC) to mitigate the spread of COVID-19. Therefore, the procedures for Site Visits are hereby changed as detailed in the following paragraphs:

1. RSVP for site visit are required 2 business days (MICC is open Monday through Friday only) before the site visit. Please note if the site visit is on Tuesday, all site visit RSVPs are due on the preceding Friday. Please email the Contract Specialist your company’s attendance, along with the number of subcontractors attending. In the email include the solicitation number and “site visit” in the subject line.

2. The names of individuals who are projected to attend are not necessary. The MICC is only looking for the number of individuals attending. We will be limiting groups to 10 at a time, so staggering of groups may be necessary.

3. Only one individual per firm are allowed to attend the site visit. (1 individual from the prime and 1 individual from each subcontractor firm)

4. Face masks must be worn by all attending parties. MICC Fort McCoy will not be providing face masks.

5. Six feet social distancing space must be maintained at all times by all parties.

6. Bathrooms are accessible before the site visit for hand washing. Contractors may return to the MICC for access to the bathroom after the site visit for hand washing.

7. Violation of these rules may be grounds for individuals to be removed from the site visit.

These ground rules are intended to be followed by all attending the site visit and those conducting the site visit. This is to ensure the safety of the entire team, including the individuals attending and those conducting the site visits.

These measures ensure all parties are following the CDC Guidelines to prevent the spread of COVID-19. If you have any symptoms or are unsure of your COVID-19 status, please do not attend the site visit. Please follow CDC Guidelines for self-isolation if you have any symptoms as identified by the CDC.

Please ensure you arrive at Fort McCoy early enough to gain access to the installation prior to the beginning of the site visit. All parties will meet at the Contracting Office before visiting any site locations. Late arrivals will not be accommodated nor will any additional site visits be scheduled.

Please utilize the time before the site visit to review and become familiar with all the documents.

Questions will not be answered at the site visit. All questions must be emailed to the Contract Specialist by the deadline stated in the solicitation. All questions will be answered and an amendment will be posted to beta.sam.gov showing all questions received and all applicable answers.

Please check beta.sam.gov for all amendments and updated documents before your firm submits a quote.

Any questions concerns, verification or clarification of information of the documents included in the solicitation package shall be submitted in writing and submitted to the Contract Specialist identified herein no later than 4:00 PM, local time on January 14, 2021. Include in the subject line of the email the Government’s solicitation number; failure to do so will lessen the Government’s ability to ensure all questions are considered during the bidding process. Provide your company name, POC and contact information in the body of the email.

All discourse concerning this solicitation and its requirement shall be directed to the Fort McCoy contracting office. Any remarks, explanations, or answers provided by any other government representative shall not change or qualify any of the terms or conditions of the solicitation. The solicitation shall only be changed by a written amendment issued by the Fort McCoy contracting office.

The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222- 26(b) (3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm

In accordance with FAR 22.404-10, the contractor must post a copy of the wage determination and Department of Labor Form WH-1321 in a prominent place where employees working on federal construction contracts can easily see it. The applicable wage determination is incorporated into the contract at Section H. The WH-1321 poster is located at http://www.dol.gov/compliance/guide/index.htm

Contractors are referred to EPA’s list of EPA-designated products available at http://www.epa.gov providing products that contain recovered materials.

In accordance with DPAP changes to reporting requirements under FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, contractors are now required to submit annual bio- based reports to the new reporting module in the System for Award Management (SAM). SAM can be accessed at https://www.sam.gov

SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at http://www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.

a. DUNS number is required for SAM registration. If your company does not have a DUNS # obtain one by calling 800-333-0505.

b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 238210 or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.

c. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 238210, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered offeror.

SAM REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at www.sam.gov in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2019) and 252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019) in SAM to be eligible to receive an award for this solicitation.

VETS-4212 Registration: You shall register on the VETS-4212 site to be considered for award.

http://www.dol.cov/vets/vets-4212.html if you have a Government contract or subcontract in the amount of $150,000 or more that was entered into or modified on or after December 1, 2003.

FAR 52.228-13 is applicable to this requirement. The Contractor shall submit alternative payment protection if the award is at or above $35,000.00 and less than $150,000.00.

FAR 52.228-15 is applicable to this requirement. The Contractor shall submit performance and payment bonds if the award is at or above $150,000.00.

Evaluation of Offers: The Government will evaluate quotes received in response to this solicitation solely on the basis of price and price related factors. Offerors shall submit a price for each item specified in the Schedule of Supplies/Services and Prices/Costs”. No quote for a quantity less than that specified in the Schedule will be accepted. All prices quoted in response to this solicitation must include all costs associated with work elements, applicable State sales taxes, permits, and licensure. And the overall project management, superintendence and quality control necessary for the planning and execution of multiple work requirements conducted simultaneously throughout the performance period.

ATTACHMENTS

Attachment 1-AT OPSEC Attachment 2-Drawings Amended 1-20-21 Attachment 3-Specifications Amended 1-20-21 Attachment 4-Wage Determination Attachment 5-SF24

(End of Summary of Changes)