W911SA-20-Q-3096 Amendment 001.docx

DOCX document 71 KB Posted

Attached to
Grounds Maintenance IL177 (MULTI SITE) Federal contract opportunity
Solicitation number
W911SA-19-Q-3096
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911SA19Q3096

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

To:

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

The pricing detail quantity has increased by 1.00 from 7.00 to 8.00.

CLIN 0002

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

CLIN 0003

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC, 500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

CLIN 1001

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

CLIN 1002

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

CLIN 1003

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

CLIN 2001

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

CLIN 2002

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

CLIN 2003

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

CLIN 3001

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

CLIN 3002

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

CLIN 3003

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

CLIN 4001

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM GROUNDS MAINTENANCE SERVICES AT MULTI-SITE LOCATIONS IL177; IN ACCORDANCE WITH THE PERFORMANCE WORK (PWS) STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS. ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31.PLACES OF PERFORMANCE: FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN.

CLIN 4002

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM SPRING AND FALL CLEAN UP SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES NECESSARY TO FULFILL THE PWS.ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31EXCEPTON: SPRING CLEAN-UP MAY BE PERFORMED TWO (2) WEEKS PRIOR TO THE START OF THE ACTIVE PERFORMANCE PERIOD AND FALL CLEAN-UP MAY BE COMPLETED TWO (2) WEEKS AFTER THE END FO THE ACTIVE PERIOD.PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

CLIN 4003

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH OCTOBER 31.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM NOVEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 ANDFACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

THE CONTRACTOR SHALL PROVIDE ALL LABOR, TRANSPORTATION, EQUIPMENT, MATERIALS, SUPERVISION, AND OTHER ITEMS OR SERVICES NECESSARY TO PERFORM WEED AND FEED SERVICES AT IL177 MULTI SITE LOCATIONS; IN ACCORDANCE WITH THE PWS AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR WILL FURNISH ALL SUPPLIES ACTIVE PERFORMANCE PERIOD IS APRIL 01 THROUGH NOVEMBER 30.NON-ACTIVE PERFORMANCE PERIOD WILL BE FROM DECEMBER 01 THROUGH MARCH 31PLACE OF PERFORMANCE:FACILITY IL005 PFC R. GANTNER ARC,500, S. BELT EASTBELLEVILLE, IL 62221 AND FACILITY IL0045 GRANITE CITY ARC,195, E. STREET,GRANITE CITY, IL 62040-1986 PLEASE SEE ATTACHED PRICE SCHEDULE FOR PRICE BREAKDOWN

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2020 TO

31-MAR-2021

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420 FOB: Destination W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2020 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 0002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2020 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2020 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 0003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2020 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2020 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 0004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2020 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2020 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 1001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2021 TO

31-MAR-2022

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2021 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 1002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2021 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2021 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 1003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2021 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2021 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 1004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2021 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2021 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 2001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2022 TO

31-MAR-2023

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2022 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 2002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2022 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2022 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 2003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2022 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2022 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 2004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2022 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2022 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 3001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2023 TO

31-MAR-2024

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2023 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 3002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2023 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2023 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 3003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2023 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2023 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 3004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2023 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2023 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 4001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2024 TO

31-MAR-2025

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2024 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 4002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2024 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2024 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 4003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2024 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2024 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following Delivery Schedule item for CLIN 4004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2024 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-APR-2024 TO

N/A
W6KG 88 RSC FTS TDA

W6KG 88 RSC FTS TDA

60 SOUTH O STREET

FORT MCCOY WI 54656-5137

910-570-9420

W919H3

The following have been added by full text:

QUESTIONS AND ANSWERS

Q1: Will the new contract include the month of November in the active period?

A1: Yes the new contract will include the month of November in the active period.

Q2: Is the flower bed maintenance to be done with spring and fall clean up only, or throughout the year, as needed?

A2: Bed maintenance should be completed at fall and spring clean-up but maintained as needed through the POP.

Q3: Is Pruning shrubs/vines it to be done with spring/fall clean up only or throughout the year, as needed?

A3: Pruning shrubs/vines these items should be completed at fall and spring clean-up but maintained as needed through the POP.

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Version 1.5; 18 JAN 2019

IL177 GROUNDS MAINTENANCE

PART 1

GENERAL INFORMATION

1. General: This is a non-personnel services contract to provide grounds maintenance services as defined in this Performance Work Statement (PWS) at two (2) Army Reserve facilities located at IL005 PFC R Gantner ARC, 500 S Belt East, Belleville, IL 62221 and IL045 located Granite City ARC, 195 E Street Granite City, IL 62040-1986. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, labor, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform grounds maintenance services as defined in the Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The 88th Army Reserve Readiness Division (RD) was established and sited in 2006 at Fort McCoy, Wisconsin. The command supports approximately 50,000 Soldiers in 19 states to provide the best in class base operations support for Soldiers in the Northwest region.

1.3 Objectives: The objective of this contract is for the contractor to perform necessary grounds maintenance services in a manner that will maintain satisfactory lawn, tree, shrub, and other exterior flora in a condition that presents a clean, neat, and professional appearance as defined in the Performance Work Statement.

1.4 Scope: The Contractor shall be responsible for performing lawn maintenance, aeration, fertilization, weed control, and general spring and fall cleanup. The contractor shall perform to the standards and specifications outlined in the PWS. Note that any drawings or maps provided to the Contractor, either before or after the contract is awarded, are for reference purposes only and may not be to scale. Any square footage, or other measurement provided, may be an approximation. It is the sole responsibility of the Contractor to determine or verify the actual site conditions and measurements.

0. Period of Performance: The period of performance shall be for one (1) Base Period and four (4) 12-month option periods. Active performance periods of eight (8) months are from April through November of each year. Non-active performance period will be from December through March of each year. Exception: Spring clean-up may be performed 2 weeks prior to the start of the active performance period and Fall clean-up may be completed 2 weeks after the end of the active performance period.

1.6 General Information:

1.6.1 Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.212-4, Contractor Inspection Requirements). A formal Quality Control Plan (QCP) is not required for this commercial service. However, the contractor shall maintain an inspection system commensurate with commercial practices to ensure the Contractor only tenders for acceptance those items or services that conform to the requirements of this contract.

1.6.2 Quality Assurance: The Contracting Officer Representative (COR) will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document focused on what the COR must do to assure that the contractor has performed in accordance with the performance requirements within this PWS.

1.6.2.1 Non-conforming Services: When a contractor’s performance is identified as unsatisfactory (e.g. does not meet contract PWS requirements and/or work schedules and/or timeframes) it is considered a non-conformance. The contractor shall reply within the specified timeframe upon receipt of a non-conformance report (NCR) from the COR or Contracting Officer (KO). Non-conformance shall be classified in one of three categories:

1.6.2.1.1 Level I (Minor) non-conformance: is defined as a non-conformance that is a departure from established standards having little bearing on the effective use or operation of the services. Minor non-conformance usually can be corrected by the contractor within a short timeframe, where no further corrective action (CA) response is necessary, and can be issued by the COR to the contractor either through a verbal or written NCR. Minor non-conforming services shall be re-performed within a specified time frame at no increase in contract price. If minor non-conformances are recurring or re-performance is not completed in full and within the specified time a Level II non-conformance may be issued to the contractor by the KO.

1.6.2.1.2 Level II (Major) non-conformance: is defined as a non-conformance, other than critical, that is likely to result in failure of services, or to materially reduce the usability of the services for their intended purpose, or it is a recurring Minor non-conformances, or a non-responsive contractor indicating a trend or failure of the contractor’s quality control. Major non-conformance’s shall result in the issuance of a written NCR from the KO to the contractor requiring a response by the contractor by a specified timeframe identifying the reasons for the unsatisfactory performance, corrective action(s) taken and date resolution has/will occur, and procedures to preclude recurrence of unsatisfactory performance. The KO may also reduce the payment to the contractor in accordance with (IAW) the performance requirements summary (PRS), or reduce payment to reflect the value of the services performed if re-performance is not possible, or may have the identified non-conforming service performed and charge the contractor for any related cost incurred.

1.6.2.1.3 Level III (Critical) non-conformance: is defined as a non-conformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the services; is likely to prevent performance of a vital agency mission; is for a repeated or uncorrected level II NCR’s; or is for a non-responsive contractor to a level II NCR. Critical non-conformance’s shall result in the issuance of a written NCR from the KO to the contractor requiring a response by the contractor by a specified timeframe identifying the reasons for the unsatisfactory performance, corrective action(s) taken and date resolution has/will occur, and procedures to preclude recurrence of unsatisfactory performance. The KO may also reduce the payment to the contractor IAW the PRS, or reduce payment to reflect the value of the services performed if re-performance is not possible, or may have the identified non-conforming service performed and charge the contractor for any related cost incurred.

1.6.2.2 The contractor will be notified of Government inspection results within 5 business days. The contractor shall acknowledge receipt of the inspection results via email or letter within 2 business days. The contractor may be notified of inspection results verbally or via email. Verbal notifications of defective work will be confirmed in writing. When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made on the basis of the initial inspection.

1.6.3 Performance Evaluation Meetings: The Contractor Point of Contact (POC) shall meet with the COR prior to start of the contract. However, meetings may be held whenever deficiencies are noted by the COR. A mutual effort shall be made to resolve all problems identified.

1.6.4 Federal Government Holidays: Except as noted in the Schedule of Work, work shall not be performed on the following holidays or on holidays observed in lieu thereof. When required services occur on holidays, work will be performed on either the previous or following work day, unless specified otherwise.

New Year’s Day1st day of January
Martin Luther King Jr.'s Birthday3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

1.6.5 Unforeseen Installation Closures: When the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closing; the Contractor will be notified by the COR of an installation closure. The Contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Government shall have the following options:

1.6.5.1 To require the Contractor to perform the work on the following day unless the following day is a Saturday or Sunday and routine work is not scheduled for Saturday or Sunday.

1.6.5.2 To reschedule the work on any day satisfactory to both parties.

1.6.5.3 Hours of Operation: The Contractor shall normally perform work during normal duty hours, 7:30a.m. to 4:00p.m. Periodic work, such as tree pruning and Spring/Fall cleanup may be performed other than normal duty hours. Arrangements for work performed during other than normal duty hours shall be made with the COR or DR.

1.6.6 Key Control: The Contractor shall establish and implement methods of ensuring that all keys issued to the Contractor by the Government are not lost, or misplaced, and are not used by unauthorized persons. No keys issued to the Contractor by the Government shall be duplicated. NOTE: All references to keys include key cards.

1.6.6.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.6.2 The Contractor may be required to replace, re-key or reimburse the Government for replacement of locks or re-keying as a result of Contractor losing keys. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due.

1.6.6.3 The Contractor shall report the occurrences of a lost key immediately to the COR no later than the next business day.

1.6.6.4 It is the responsibility of the Contractor to prohibit the use of keys issued by the Government by any persons other than the Contractor’s employees. It is also the responsibility of the Contractor to prohibit the opening of locked areas by the Contractor’s employees to permit entrance of persons other than Contractor’s employees engaged in the performance of assigned work in those areas.

1.6.6.5 Lock Combinations; the Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.6.7 Conservation of Utilities: The Contractor shall be directly responsible for instructing employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions, which preclude the waste of utilities, which shall include but shall not necessarily be limited to:

1.6.7.1 Lights shall be used only in areas where and at the time when work is actually being performed.

1.6.7.2 Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by contracted workers.

1.6.7.3 Water faucets or valves shall be turned off after the required usage has been accomplished.

1.6.7.4 Government telephones shall be used by Contractor employees only for emergencies.

1.6.8 Damages Caused by the Contractor: The Contractor shall be held accountable and liable to the Government for any damages to Government facilities, furnishings, equipment or grounds caused by the Contractor or his employees. The Contractor shall instruct his employees to immediately inform the building manager or DR of any damages to property resulting from the performance of their duties.

1.6.9 Parking for Contractor’s Employees & Contractor Vehicles: Contractor employees shall park their personal and Contractor’s vehicles during the times and in the area designated by the COR or DR.

1.6.10 Circumstances to Be Reported: The Contractor or the Contractor’s employees shall report any circumstances of needed repair of the facility or unusual soiling of an area which may affect the performance of the work, present unhealthy or hazardous conditions, or create any delays or interference with the work caused by the employees of the Government. Such report shall be made immediately upon discovery by the Contractor to the COR or DR.

1.6.11 Hazardous Materials: The Contractor shall maintain onsite and have readily available an inventory listing of all hazardous materials used onsite. Safety Data Sheets (SDS) will be maintained and readily available for any chemicals or hazardous materials used onsite. It is the Contractor’s responsibility to properly train his personnel on the existence and safe use and storage of chemicals and hazardous materials.

1.6.12 Loss of Contractor Property: If applicable, the Contractor shall be responsible to retain supplies and equipment within each building, in a safe and secure manner. Storage rooms shall be kept clean. The Government will not be held liable for any loss of supplies or equipment owned by the Contractor; nor the loss of any personal property belonging to employees of the Contractor.

1.6.13 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer, COR, or DR will apprise the contractor of how the government views the Contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.14 Contracting Officer Representative (COR): The COR will be identified by a separate letter and in the Supplemental Information of the contract. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.15 Key Personnel: The following personnel are considered key personnel by the government: designated Point Of Contact (POC) and an alternate Point of Contact: The Contractor shall provide a designated POC who shall be responsible for the competent performance of the…