W911SA19B2015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
AMENDMENT 0003 QUES AND ANSW
QUESTION 21: Demolition plans call for 105 bunkers to be removed. It is known that additional is being installed, however, Drawing sheet C1.1 indicates that there is 120 new target bunkers being installed but Drawing sheet E1.1 indicates 134 new target bunkers. Please review and confirm that there is only 120 new target bunkers and E1.1 is just misnumbered.
ANSWER 21: A casual observance of the plans would indicate that there are 8 targets per lane multiplied by 15 lanes, so yes, target numbers on E1.1 are mis-numbered and there are only 120 targets total.
QUESTION 22: Firing Line Shooting Barrier provided by government and installed by contractor. Can you provide details on the barrier or on how it gets installed?
ANSWER 22: Army Training Circular TC 25-8, Appendix F, Page F-4 Figure F-1.3 details the standard Military Police Barricade Design suggesting dimensions and mounting to concrete slabs.
(End of Summary of Changes) image1.wmf