W911SA-19-B-2015_Amendment_0002_.docx

DOCX document 34 KB Posted

Attached to
Rewire, Upgrade Circuits, Add Targets to Range 1, Fort McCoy, Wisconsin
Solicitation number
W911SA-19-B-2015
Issued by

About this file

Amendment 0002

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911SA19B2015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 20-Aug-2019 02:30 PM to 29-Aug-2019 02:30 PM.

The following have been added by full text:

AMENDMENT 0002 QUES AND ANSWER

QUESTION 1: I did get the revised drawings today. They answered some questions but the new drawings are not identified in any way as the Addenda set for bidding. How are we to know later which set rules? Can you add the Addenda to the drawing title block?

ANSWER 1: The set of documents referenced in the most recent amendment is the applicable set of documents – drawings cannot be renamed.

We have several questions.

Drawing E-5.0 and Spec 16123-3.03C

QUESTION 2: The specification calls for ALL cabling to be in conduit and encased on concrete. E-5.0 only asks for conduit under gvmt emplacement.

ANSWER 2: The specifications only call for encasing in concrete under road beds.

QUESTION 3: Is there concrete encasement of conduits and cabling?

ANSWER 3: Only under road beds, if applicable.

QUESTION 4: Is ALL cable to be in conduit?

ANSWER 4: Only upon entering and exiting the target emplacements.

QUESTION 5: If 3 is ALL cable, what size conduit?

QUESTION 5: Appropriately sized to accommodate the cabling per NEC, UFC and all other applicable codes and standards.

QUESTION 6: If only under emplacement, what type of conduit and what size?

ANSWER 6: Same as #4.

QUESTION 7: Data Enclosure at target emplacement as shown in detain on E-5.0. Who provides and what are the specs on it?

ANSWER 7: Refer to the revised Drawings issued on or about 08 August, 2019.

QUESTION 8: Is all electrical shown in detail 1 on E-5.0 mounted to concrete enclosure?

ANSWER 8: Yes

QUESTION 9: The drawing call for larger circuits than removed back to control tower. Is the current conduit into tower large enough for new wiring?

ANSWER 9: For bidding purposes, assume that the conduits are adequately sized.

QUESTION 10: Is there a photo or better detail on the "Target Emplacement" being furnished by the government?

ANSWER 10: No.

QUESTION 11: It appears that the "Target Emplacement" has concrete sides and a back,does it have a pre fabed concrete floor with cutouts for the electrical?

ANSWER 11: The target emplacement is a pre-cast concrete bunker as shown on the drawings. It is all one unit.

QUESTION 12: Are the actual targets and systems being furnished and installed by others?

ANSWER 12: Yes.

QUESTION 13: Since this project is 100% designed, do you have an erosion control plan in order to get a DNR Permit for area being disturbing in the construction limits? ANSWER 13: Per the specifications, the Contractor is responsible for the erosion control plan.

QUESTION 14: Do you have a bench mark for elevations?

ANSWER 14: There is a control monument nearby on the range that is not shown on the drawings.

QUESTION 15: Does each target require a separate data cable from the tower to the target location?

ANSWER 15: No. There shall be a separate data cable for each lane, which “daisy chains” from target to target in each lane.

QUESTION 16: Does each target require a separate power feeder from the tower to the target location?

ANSWER 16: No. Each lane requires one feeder from the tower with feed-thru lugs at each target panelboard.

QUESTION 17: Is there a detail drawing of the precast bunker and the French Drain? Can the French drain be installed along the width off the concrete bunker and not through the center of the concrete bunker?

ANSWER 17: There is no other detail of the french drain. The drain is the width of the target bunker starting at the back edge of the concrete emplacement, not under the center of the bunker as questioned. The surface over the top of the french drain is compacted gravel, which also starts at the back edge of the concrete target emplacement.

QUESTION 18: What is the weight of the precast bunker?

ANSWER 18: Since the emplacements have not been procured by the government yet, it is unknown what the exact weight of the emplacements are, however, using the dimensions shown on the drawings to calculate the volume of the concrete in the emplacement and assuming an average weight of 150 lbs per cubic foot for precast concrete, the emplacement should weigh approximately 4,000 lbs.

QUESTION 19: Is it allowable to run the conduit up the outside of the tower and stub into the second floor?

ANSWER 19: All conduit up to the second floor shall be routed through the second floor structure inside the building.

QUESTION 20: On C5.0 it calls out for angle and then 8”x6” oak tie. Then it calls out for Dura-Block Bullet-Absorbent tiles. Is there a spec and a cut sheet for Product data and installation?

ANSWER 20: The best that can be offered to this question is the manufacturer’s website which lists salient features for competitive bidding by other manufacturers if available. This is the ballistic panel system that is currently employed on Fort McCoy Ranges. https://www.range-systems.com/product/dura-panel/ - a cut sheet may be found in the “Additional Information” tab.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

SUPPLEMENTAL INFORMATION

Contract Specialist:

Michelle Harvey Phone: 608-388-1250 E-mail: michelle.m.harvey3.civ@mail.mil

Contracting Officer:

Steve Bailey Phone: 608-388-6077 Email: steven.m.bailey2.civ@mail.mil

Include the following within the sealed bid package:

1) Completed SF1442 with acknowledgement of all amendments
2) Completed Attachment 5, SF24
3) Any additional verification documents
4) CD-ROM (CD-R) disk with an electronic copy of all submission requirements listed above.

Contractor POC E-mail ______________________________________________

DUNS ________________________________________

TAXPAYER ID # _______________________________

This solicitation is a 100% HUBZone Small Business set-aside under NAICS code 238210 with a size standard of $15 Million.

PROJECT MAGNITUDE

The magnitude of this project is between $500,000 and $1,000,000.

PERIOD OF PERFORMANCE:

The contractor must meet the Bona Fide Need (see page 38) for the current fiscal year however most of the work will not start until April 1 2020 and must be completed by September 30 2020.

Bids can be submitted in any of the following ways:

Delivered to or by Mail:

Mission & Installation Contracting Command – Fort McCoy Attn: Michelle Harvey, Contract Specialist 1108 South R Street Fort McCoy, WI 54656-5153

A site visit is scheduled for July 24, 2019 at 11:00AM Local time. Interested attendees are asked to meet at the Contracting Office; Bldg. 1108. South R Street, Fort McCoy, Wisconsin. The POC for the project is Jim Hubert at (608) 388-1251. See Site Visit in Section 00100. This will be the only site visit conducted, requests for additional site visits will be denied.

For Site Visit information, see Site Visit clause 52.236-27, Alternate 1 in Section 00100. Unless you already have a permanent vehicle pass, you will be required to obtain a one-day vehicle pass. You will be required to present the following information at the Visitor’s Center: (1) vehicle registration, (2) valid driver’s license, (3) or car rental agreement (if applicable). It is highly recommended that bidders plan to arrive at the Visitor’s Center at least an hour prior to the scheduled time for the site visit. The conference will begin promptly without considerations for late or lost bidders; no subsequent site visits will be considered. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.

Any questions concerns, verification or clarification of information of the documents included in the solicitation package shall be submitted in writing and submitted to the Contract Specialist identified herein no later than 4:00 PM, local time on August 2, 2019. Include in the subject line of the email the Government’s solicitation number; failure to do so will lessen the Government’s ability to ensure all questions are considered during the bidding process. Provide your company name, POC and contact information in the body of the email.

The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222-26(b) (3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm

In accordance with FAR 22.404-10, the contractor must post a copy of the wage determination and Department of Labor Form WH-1321 in a prominent place where employees working on federal construction contracts can easily see it. The applicable wage determination is incorporated into the contract at Section H. The WH-1321 poster is located at http://www.dol.gov/compliance/guide/index.htm

Contractors are referred to EPA’s list of EPA-designated products available at http://www.epa.gov providing products that contain recovered materials.

In accordance with DPAP changes to reporting requirements under FAR 52.223-2, Affirmative Procurement of Bio- based Products under Service and Construction Contracts, contractors are now required to submit annual bio-based reports to the new reporting module in the System for Award Management (SAM). SAM can be accessed at https://www.sam.gov

SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already registered, please register in the CCR database at https://www.sam.gov/

a. A DUNS number is required for SAM registration. If your company does not have DUNS #, obtain one by calling 800-333-0505.

b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 238210 under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.

SAM REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at www.sam.gov in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018) and 252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2015) in SAM to be eligible to receive an award for this solicitation.

EVALUATION FACTORS

The Government will evaluate bids received in response to this solicitation solely on the basis of price and price related factors. Bidders shall submit a price for each item specified in the solicitation. No bid for a quantity less than that specified in the solicitation will be accepted. Bids shall be evaluated using the quantities set forth in the solicitation. All prices bid in response to this solicitation must include all costs associated with work elements, applicable State sales taxes, permits, and licensure. And the overall project management, superintendence and quality control necessary for the planning and execution of multiple work requirements conducted simultaneously throughout the performance period.

BID GUARANTEE

A Bid Bond/Guarantee is required for this contract if it exceeds $150,000. The Bid Bond amount shall be twenty percent (20%) of the bid price or $3 Million, whichever is less.

Bidders must use the Standard Form (SF) 24 if providing a bid bond as the bid guarantee.

ATTACHMENTS

Attachment 1ATOPSEC
Attachment 2Specifications
Attachment 3Drawings Amended 8 15 2019
Attachment 4Wage Determination Amended 8-12-2019

Attachment 5 SF24

(End of Summary of Changes) image1.wmf