Solicitation Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to Replace Water Mains, Fort McCoy, WI, newest first.
File Type Posted
W911SA18B2020_Abstract.pdf PDF
W911SA18B2020_Attachment_6_CLIN_0004_So_M_Street_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_8_CLIN_0006_East_O_Street_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_5_CLIN_0003_POW_Road_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_3_CLIN_0001_So_B&C_Streets_Drawings_Revised_.pdf PDF
W911SA18B2020_Attachment_16_Historical_Data.pdf PDF
W911SA18B2020_Attachment_11_CLIN_0009_So_Q_Street_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_12_CLIN_0010_So_H_Street_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_13_CLIN_0011_So_I_Street_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_14_Wage_Determination_WI180008_08-24-2018.pdf PDF
W911SA18B2020_Attachment_4_CLIN_0002_HQ_Road_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_7_CLIN_0005_East_N_Street_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_9_CLIN_0007_So_N_Street_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_10_CLIN_0008_So_P_Street_Drawings_Revised.pdf PDF
W911SA18B2020_Attachment_2_Specifications_-_Revised_08242018.pdf PDF
W911SA18B20200004_Solicitation_Amendment_0004.docx DOCX document
W911SA-18-B-2020_Amendment_0002(f).pdf PDF
W911SA-18-B-2020_Amendment_0003(f).pdf PDF
W911SA18B2020_Attachment_14_Wage_Determination_WI180008_07-20-2018.pdf PDF
W911SA18B20200001_Amendment_0001.docx DOCX document
W911SA18B2020_Attachment_1_AT_OPSEC.pdf PDF
W911SA18B2020_Attachment_9_CLIN_0007_So_N_Street_Drawings.pdf PDF
W911SA18B2020_Attachment_4_CLIN_0002_HQ_Road_Drawings.pdf PDF
W911SA18B2020_Attachment_2_Specifications.pdf PDF
W911SA18B2020_Solicitation.docx DOCX document
W911SA18B2020_Attachment_7_CLIN_0005_East_N_Street_Drawings.pdf PDF
W911SA18B2020_Attachment_10_CLIN_0008_So_P_Street_Drawings.pdf PDF
W911SA18B2020_Attachment_13_CLIN_0011_So_I_Street_Drawings.pdf PDF
W911SA18B2020_Attachment_5_CLIN_0003_POW_Road_Drawings.pdf PDF
W911SA18B2020_Attachment_15_SF24.pdf PDF
W911SA18B2020_Attachment_12_CLIN_0010_So_H_Street_Drawings.pdf PDF
W911SA18B2020_Attachment_14_Wage_Determination_WI180008_06-22-2018.pdf PDF
W911SA18B2020_Attachment_6_CLIN_0004_So_M_Street_Drawings.pdf PDF
W911SA18B2020_Attachment_3_CLIN_0001_So_B&C_Streets_Drawings.pdf PDF
W911SA18B2020_Attachment_11_CLIN_0009_So_Q_Street_Drawings.pdf PDF
W911SA18B2020_Attachment_8_CLIN_0006_East_O_Street_Drawings.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911SA18B2020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

PURPOSE OF AMENDMENT 0005

The purpose of solicitation amendment 0005 is to answer contractor questions, provide revised specifications, provide revised drawings, provide historical data, update the wage determination, and extend the solicitation closing date.

Attachment 2 Specifications have been revised. The following changes were made to the specifications:

1. Revised Specification Section 01000, Part 1, Paragraph 1.01 Summary of the Work, Subparagraph B.5.b.

Revised Specification: It is the intent of this project to install HDPE piping systems. Where drawings represent or indicate the installation of PVC piping, the Contractor shall provide HDPE piping and installation in compliance with Specification Section 02534 including details and tables for transitions from HDPE pipe to non-HDPE pipe.

Original Specification: It is the intent of this project to install HDPE piping systems. Where drawings represent or indicate the installation of PVC piping, the Contractor shall provide HDPE piping in accordance with Specification Section 02534.

2. Revised Specification Section 01000, Part 1, Paragraph 1.01 Summary of the Work, Subparagraph C.1.e.

Revised Specification: All new water main piping and laterals must be installed along new routes as represented on Drawings including where shown under paved surfaces. If a water main or lateral is represented on Drawings for installation under a paved surface, then the new water piping or lateral must be installed under the paved surface as shown.

Original Specification: Not used.

3. Revised Specification Section 01000, Part 1, Paragraph 1.01 Summary of the Work, Subparagraph C.1.f.

Revised Specification: Prior to the start of construction, provide submittals of site data collected including survey or geotechnical data.

Original Specification: Not used.

4. Revised Specification Section 01000, Part 1, Paragraph 1.01 Summary of the Work, Subparagraph D.8.

Revised Specification: Provide repairs of paved surfaces damaged or altered during all phases of work including asphalt and concrete. Cold patch repairs and methods are not authorized for installation. Refer to Specification Section 02740 Hot Mix Asphalt Pavement and Section 03310 Exterior Cast-in-Place Portland Cement Concrete for additional requirements.

Original Specification: Not used.

5. Revised Specification Section 01000, Part 1, Paragraph 1.05 Quality Control, Subparagraph E.3.

Revised Specification: For HDPE piping installers and joiners, acceptable certification must meet manufacturer requirements and the requirements of PPI TN-42, Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects. Factory certifications from a manufacturer may be acceptable when the factory certification program meets the requirements of the Plastic Pipe Institute for HDPE piping installation and the requirements of PPI TN-42 for butt fusion joining.

Original Specification: Not used.

6. Revised Specification Section 01000, Part 1, Paragraph 1.07 Operation and Maintenance Manuals, Subparagraph A.

Revised Specification: Provide one (1) PDF copy of product data documentation for piping, hydrants, devices, tracer wire, and connected equipment for operation and maintenance manuals. Where the Contractor has installed entire systems or has assembled or interconnected several subsystems, the Contractor shall include a written narrative of how each system or subsystem operates and how the overall system is intended to be operated, complete with diagrams showing flow routes and connections.

Original Specification: Provide one (1) PDF copy of equipment maintenance and operation manuals for all major pieces of equipment and fixtures. Where the Contractor has installed entire systems or has assembled or interconnected several subsystems such as heating, ventilating, or special electrical systems, the Contractor shall include a written narrative of how each system or subsystem operates and how the overall system is intended to be operated, complete with diagrams showing flow routes or electrical interconnections.

7. Revised Specification Section 01000, Part 1, Paragraph 1.07 Operation and Maintenance Manuals, Subparagraphs B.

Revised Specification: 1. Provide shop drawings with product data submittals to clearly illustrate:

a. Dimensions.

b. Salient characteristics.

c. Diagrams.

Original Specification: 1. Supplement product data with drawings as necessary to clearly illustrate:

a. Relations of component parts of equipment and systems.

b. Control and flow diagrams.

8. Revised Specification Section 01000, Part 2, Paragraph 2.02 A.

Revised Specification: Provide product data submittals of all items for installation prior to the start of construction, and obtain Government approval before ordering materials.

Original Specification: Not used.

9. Revised Specification Section 01000, Part 3, Paragraph 3.01 Inspection, Subparagraph A.3.

Revised Specification: All work must be inspected prior to covering up the work including piping installation and joints, tracer wire and utility marking, pipe transitions, concrete anchor wall blocks, trench floors, and trench zones including piping embedment.

Original Specification: Not used.

10. Revised Specification Section 01000, Part 3, Paragraph 3.03 Testing and Verification, Subparagraph D.

Revised Specification: Prior to the start of each excavation, provide assessment of site conditions including yet not limited to ground water and surface water levels, site drainage, safety, and traffic.

Original Specification: Not used.

11. Revised Specification Section 01000, Part 3, Paragraph 3.03 Testing and Verification, Subparagraph E.

Revised Specification: Provide submittals of all site data collected for each project site including geotechnical data, survey, and related types of data. Submittals of data must include company name, date of test or collection, findings, and data results including soil borings.

Original Specification: Not used.

12. Revised Specification Section 01000, Part 3, Paragraph 3.07 A.1., A.2.

Revised Specification: 1. With red pencil or red ink, neatly inscribe all KO approved changes to show final locations and types of water piping mains and laterals, devices, hydrants, tracer wire connections, and connected system components including anchor wall blocks, repairs, and connected work.

2. With red pencil or red ink, neatly inscribe the location of all existing and new water access points, tracer wire access points, and locations of exterior utilities. Locating may be accomplished by traditional survey methods or by global positioning system (GPS) satellite equipment supplemented by traditional methods where required. Include the size, material, and depth.

Original Specification: 1. With red pencil or red ink, neatly inscribe all COR approved changes to show final locations and types of partitions, walls, doors, electrical, fire alarm system, communication system, plumbing, heating, ventilating, air conditioning services and equipment, and similar work.

2. With red pencil or red ink, neatly inscribe the location of all existing and new exterior utilities. The locating may be accomplished by traditional survey methods or by global positioning system (GPS) satellite equipment supplemented by traditional methods where required. Include the size, material, and depth.

13. Revised Specification Section 01019, Part 1, Paragraph 1.04

Revised Specification: The Contractor shall provide dewatering systems for each project site to maintain dry trench conditions at all times and to complete project work in accordance with specifications. The Contractor is responsible for all costs associated with dewatering including but not limited to site assessment, well points or deep well system, pumps, sumps, associated system components, materials, labor, installation, and removal.

Original Specification: The Contractor shall provide incidental dewatering systems to complete project work in accordance with specifications.

14. Revised Specification Section 01019, Part 1, Paragraph 1.05

Revised Specification: All new water main piping and laterals must be installed along new routes as represented on Drawings including where shown under paved surfaces. If a water main or lateral is represented on Drawings for installation under a paved surface, then the new water piping or lateral must be installed under the paved surface as shown.

Original Specification: Not used.

15. Revised Specification Section 01019, Part 3, Paragraph 3.01 Winter Exclusion, Subparagraph C

Revised Specification: Work shall not be performed during the period of winter exclusion and when extreme temperatures are outside of acceptable range. Acceptable ranges of temperatures are determined by Fort McCoy (weather alerts or hazards) and by the manufacturer for each installation item and method including yet not limited to piping, equipment, and electrofusion joining.

Original Specification: Work shall not be performed when extreme temperatures are outside the acceptable range.

16. Revised Specification Section 01300, Part 1, Paragraph 1.06 Submission Requirements, Subparagraph A.

Revised Specification: Provide separate submittals for each water main project. Provide submittals promptly in accordance with an approved schedule in sequential order to avoid any type of scheduling delay in the completion of work and to avoid delaying the work of any contractor. Provide submittals to meet all requirements including specifications and drawings.

Original Specification: Provide submittals promptly in accordance with an approved schedule in sequential order to avoid any type of scheduling delay in the completion of work and to avoid delaying the work of any contractor. Provide submittals to meet all requirements including specifications and drawings.

17. Revised Specification Section 01300, Part 1, Paragraph 1.06 Submission Requirements, Subparagraph N.5.

Revised Specification: Construction Redlines: For each project site, provide two sets of 100% final design drawings for use as construction redlines. Use the final construction redlines for the development and completion of as-built and record drawings, and include all of the following data.

a. Construction redlines must include final locations, types, and sizes of water piping mains and laterals including anchor wall blocks, repairs, and connected work.

b. Construction redlines must include final locations of water connections, anchor wall blocks, water access points, tracer wire access points, and locations of exterior utilities.

c. Construction redlines must include site data collected including a table summary of geotechnical and survey data used for each project on site plans.

Original Specification: Construction Redlines: Provide two sets of 100% final design drawings for use as construction redlines. Use the final construction redlines for the development and completion of as-built and record drawings.

18. Revised Specification Section 01300, Part 1, Paragraph 1.06 Submission Requirements, Subparagraph N.8.

Revised Specification: Geotechnical Data. Provide all geotechnical and survey data, and related documentation collected for each project site including company name, date of collection, findings, analysis, soil borings, and data results.

Original Specification: Not used.

19. Revised Specification Section 01300, Attachment1: Schedule of Material Submittals.

Revised Specification: Schedule of Material Submittals was updated for required submittals.

20. Revised Specification Section 02315, Part 1, Paragraph 1.01 Scope, Subparagraph C.

Revised Specification: Provide dewatering systems in all excavated areas to maintain dry conditions at all times including trenches.

Original Specification: Not used.

21. Revised Specification Section 02315, Part 3, Paragraph 3.09 Dewatering, Subparagraph C.

Revised Specification: Provide dewatering systems to maintain dry conditions at all times in excavated areas, and to remove and convey water away from excavations using well points, pumps, sumps, and associated system components.

Original Specification: Provide dewatering system to remove and convey water away from excavations using pumps, sumps, and system components.

22. Revised Specification Section 02315, Part 3, Paragraph 3.09 Dewatering, Subparagraph G.

Revised Specification: Maintain dewatering systems during construction to maintain dry conditions in excavated areas, and to prevent uplifting of and damage to adjacent structures.

Original Specification: Maintain dewatering systems during construction to prevent uplifting of and damage to structures.

23. Revised Specification Section 02315, Part 3, Paragraph 3.09 Dewatering, Subparagraph I.

Revised Specification: Maintain dry trench conditions at all times during the work.

Original Specification: Maintain dewatering systems during construction to prevent uplifting of and damage to structures.

24. Revised Specification Section 02315, Part 3, Paragraph 3.09 Dewatering, Subparagraph L.

Revised Specification: Drill, maintain, and abandon dewatering wells in compliance with federal, state and local regulations, statutes, laws and ordinances. Provide removal of dewatering systems within ten calendar days of completion of work at each project site.

Original Specification: Drill, maintain, and abandon dewatering wells in compliance with federal, state and local ordinances.

25. Revised Specification Section 02317, Part 1, Paragraph 1.01 Scope, Subparagraph F.

Revised Specification: Provide dewatering systems to maintain dry trench conditions at all times in trenches and excavated areas, to remove all types of water out of excavated areas and trenches, and to maintain the stability of trenches and work areas for safety.

Original Specification: Provide dewatering measures and techniques to keep all types of water out of trenches, and to maintain the stability of trenches and work areas.

26. Revised Specification Section 02317, Part 3, Paragraph 3.07 Wet Trench Conditions, Subparagraph A.

Revised Specification: Provide dewatering systems to maintain dry trench conditions at all times. Provide effective dewatering systems including measures and techniques, well points, sump pumps, sump pits, and associated system components for the removal of all types of water from excavated areas and trenches.

Original Specification: Provide ordinary dewatering measures and techniques for ground and surface water intrusion into trench or excavated areas including the use of sump pumps, sump pits adjacent to pipe alignment, dikes, and similar methods.

27. Revised Specification Section 02317, Part 3, Paragraph 3.08 Well Point and Deep Well Dewatering, Subparagraph A.

Revised Specification: Provide dewatering systems including yet not limited to well points or deep wells to maintain dry trench conditions at all times. Well points and deep wells may also be referred to as dewatering wells.

Original Specification: Provide installation of conventional dewatering or a well point to effectively dewater trenches when the water table is observed between the bottom of pipe to 2’ above pipe.

28. Revised Specification Section 02317, Part 3, Paragraph 3.08 Well Point and Deep Well Dewatering, Subparagraph B.

Revised Specification: All dewatering wells must be constructed, installed, maintained, and abandoned in compliance with requirements of Wisconsin Department of Natural Resources (WDNR).

Original Specification: When dewatering wells are approved for use, each dewatering well must be constructed, installed, maintained, and abandoned in compliance with requirements of Wisconsin Department of Natural Resources (WDNR).

29. Revised Specification Section 02317, Part 3, Paragraph 3.08 Well Point and Deep Well Dewatering, Subparagraph D.

Revised Specification: The Contractor is responsible for all costs associated with dewatering to maintain dry trench conditions at all times including but not limited to site assessment, well points or deep well system, pumps, sumps, associated system components, materials, installation, and removal.

Original Specification: The Contractor is responsible for all costs associated with dewatering including but not limited to well points or deep well system, materials, installation, and removal.

All drawing attachments (3-13) have been revised to include HDPE details for the work.

Attachment 14 Wage Determination has been revised.

Attachment 16 Historical Data has been added. The historical data is for reference only, and was accurate at the time the data was obtained (soil borings). Historical data should not be relied upon as currently accurate.

Contractor Q&A have been added to and previous answers to questions have been revised. Contractors shall refer to answers provided in this solicitation amendment 0005.

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 28-Aug-2018 02:00 PM to 06-Sep-2018 02:30 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

CONTRACTOR Q&A

Q1. Can we get a schedule of when the Challenge Academy will not have cadet training in the 2018/2019 seasons? Work along H Street will be a lot easier and safer without cadets in the area.

A1. Per Attachment 2 Specifications Section 01019 Paragraph 3.01 A., winter work is not authorized during the period 1 December through 1 April. The Challenge Academy will have a break mid-June to mid-July. Scheduling is coordinated through the COR after the contract is awarded and scheduling is not guaranteed in advance of the required coordination. For additional scheduling requirements, refer to Attachment 2 Specifications in its entirety including Section 01000 Paragraph 1.11 (all) and Section 01019 Paragraph 3.01 C.

Q2. HDPE pipe needs to be installed by a certified installer. Can you tell me which certifications are acceptable?

A2. Refer to Attachment 2 Specifications Section 01000 Paragraph 1.05.E. (all), for HDPE piping installers and joiners, acceptable certification must meet manufacturer requirements and the requirements of PPI TN-42, Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects. Factory certifications from a manufacturer may be acceptable when the factory certification program meets the requirements of the Plastic Pipe Institute for HDPE piping installation and the requirements of PPI TN-42 for butt fusion joining. For additional quality, certification, and training requirements (welding, plumbing, HDPE piping installation, electrical), refer to Attachment 2 Specifications Section 01000, Paragraphs 1.05 A. through E. (all paragraphs).

Q3. Is the dewatering by general contractor? Fort McCoy will not pay any additional fees for dewatering?

A3. Response for the 1st part of Question 3. Refer to Attachment 2 Specifications Section 01019 Paragraph 1.04 which states the Contractor shall provide dewatering systems for each project site to maintain dry trench conditions at all times and to complete project work in accordance with specifications.

Response for the 2nd part of Question 3. Refer to Attachment 2 Specifications Section 01019 Paragraph 1.04, the Contractor is responsible for all costs associated with dewatering including but not limited to well points or deep well system, pumps, sumps, associated system components, materials, labor, installation, and removal.

For additional dewatering requirements, refer to Attachment 2 Specifications in its entirety including yet not limited to Section 02315 Paragraph 3.09 (all) and Section 02317 Paragraphs 1.01 F., 3.07 (all), and 3.08 (all).

Q4. If we are to dig across asphalt roadways are gravel patches acceptable for the winter or is cold patch required?

A4. Per Specifications Section 01019, Paragraph 3.01 A., winter work is not authorized during the period 1 December through 1 April. For additional requirements, refer to Attachment 2 Specifications in its entirety including Section 01000, Part 1, Paragraph 1.01 Summary of the Work, Subparagraph D.8., provide repairs of paved surfaces damaged or altered during all phases of work including asphalt and concrete. Cold patch repairs and methods are not authorized for installation.

Q5. Since we will be digging in or along the street curbing, will the road be closed while we work for safety?

A5. Refer to Attachment 2 Specifications in its entirety for safety and work requirements including Section 01000, Paragraph 1.04 J. (all) for road closure and traffic work requirements. Road closures must be scheduled and coordinated in advance to meet Fort McCoy requirements, and scheduling cannot be guaranteed.

Q6. Are we to provide traffic control for closed streets or just barricades and signs?

A6. Refer to Attachment 2 Specifications, Section 01000, Paragraph 1.04 J. (all) for road closure, coordination, signage, and traffic management requirements. For additional requirements regarding traffic control measures including signage and barricades, refer to Attachment 2 Specifications in its entirety including yet not limited to Section 02315 Paragraph 3.01 (all), Section 02317 Paragraph 3.01 (all), and Section 02010 Paragraph 1.05 (all).

Q7. It was mentioned (in the site visit) that the utilities could be in the street or running on the side of the street. Who is responsible for location?

A7. For protection of existing utilities including requirements for utility locates, refer to Attachment 2 Specifications Section 02010, Paragraph 1.05 E. and Paragraph 3.02 (all). For additional requirements for utility locates, refer to Attachment 2 Specifications in its entirety including yet not limited to Sections 02315 and 02317 Paragraph 3.02 (all).

Q8. If a trench must be left open overnight, are trench plates sufficient?

A8. No, trench plates are not authorized for use. Trenches must not be left open overnight. For open trench work areas, refer to Attachment 2 Specifications Section 02317, Paragraph 3.06 (all).

Per Section 02317 Paragraph 3.06 (all), trenches must be backfilled to existing grade at completion of each day’s work to within one pipe length of complete pipe installation, facility access must be maintained, and construction fence barricades are required around open trenches and pits when left unattended.

Q9. Are there any soil borings for the Fort or for the locations of the watermain replacement project areas?

A9. DPW does not have specific soil borings data compiled for the water main replacement project areas. Refer to Attachment 16 Historical Data for reference only and not for construction.

For dewatering and excavation requirements, refer to Attachment 2 Specifications including Section 02315 Paragraph 3.09 Dewatering and Section 02317 Paragraph 3.07 Wet Trench Conditions. The Contractor is responsible to provide dewatering which may require soil borings. Per Section 01000, the Contractor must submit all testing and verification data and documentation for Government review which includes any geotechnical and soil borings data determined to be required by the Contractor to perform the work, and any collected soil borings data used for construction must be included in construction redlines and final as-built drawings.

Q10. Plans call for a 16" casing pipe with spacers for the 12" water main. The minimum size casing pipe for a 12" water main is 24" because of the size of the spacers. Pricing to go from a 16" to 24" is considerable. Any reason why you need a casing pipe at all? If we can horizontal drill the 12" pipe it would be less expensive. Additionally the smaller casing pipes for smaller water mains are all undersized.

A10. Per Revised Specifications and Drawings (plans), all new water main piping must be HDPE, and there is not any casing required for typical HDPE piping installations unless specifically required by the approved HDPE piping manufacturer for a particular installation application.

Refer to Specification to Section 02534 HDPE Piping Systems for HDPE piping installation requirements.

Q11. Is it the intent to place the new main under the paved road? If not how is pavement replacement being handled?

A11. Response for the 1st part of Question 11. Yes, it is the design intention to install new water mains as shown on drawings including under roads, sidewalks, and drive lanes. All new water main routes and locations are intentionally designed to be installed as shown on the drawings.

Refer to Attachment 2 Specifications Section 01000, Part 1, Paragraph 1.01 Summary of the Work, Subparagraph C.1.e. All new water main piping and laterals must be installed along new routes as represented on Drawings including where shown under paved surfaces. If a water main or lateral is represented on Drawings for installation under a paved surface, then the new water piping or lateral must be installed under the paved surface as shown.

For clarification, a complete design analysis was completed for every water main project and new water mains are intentionally designed to be installed as shown on the drawings including underneath roadways, sidewalks, and drive lanes without field adjustments.

Response for the 2nd part of Question 11. Per Attachment 2 Specifications in its entirety including Section 01000, Part 1, Paragraph 1.01 Summary of the Work, Subparagraph D.8., provide repairs of paved surfaces damaged or altered during all phases of work including asphalt and concrete. Cold patch repairs and methods are not authorized for installation.

For additional requirements for paved surfaces, refer to Attachment 2 Specifications Section 02740 Hot Mix Asphalt Pavement, Section 03310 Exterior Cast-in-Place Portland Cement Concrete, and related Sections 03030, 03100, 03150, and 03200.

Q12. How is the government going to determine if water is 12” below the bottom of pipe?

A12. There is not a requirement for 12” below pipe. Refer to Attachment 2 Specifications in its entirety for requirements (dry conditions for trenches and excavated areas and dewatering requirements) including Section 01019, Paragraph 1.04.

The Contractor must keep trenches and excavated areas dry at all times during construction, and the Government will inspect to verify trenches are kept dry during construction as required.

Q13. How does a contractor determine locations where dewatering is needed to be competitive?

A13. The Contractor is responsible to assess the risk for each project. Bids must meet all requirements as specified in the Specifications and as shown on the Drawings. Refer to Historical Data for reference only and not for construction.

Q14. Is the inspector going to ok the laying of pipe in each run?

A14. All work must be inspected in compliance with Attachment 2 Specifications in its entirety, and the Government cannot approve any work before the work is ready for inspection.

Q15. What requirements does the government have for proof the pipe was laid in dry conditions and water at least 12” below pipe?

A15. Refer to Attachment 2 Specifications in its entirety. There is not a requirement for 12” below pipe. The revised Specifications require dry conditions for trenches and excavations at all times during construction.

Q16. Spec section 01000 B5. a and b., does this spec apply to all clins? Does it over rule plans pages that state otherwise? Example clin 0004 south M sheet CU101 note 1.

A16. Response for the 1st part of Question 16. Yes, Specification Section 01000, Paragraphs 1.01 B.5., B.5.a., and B.5.b. apply to all CLINs without exception. All Specifications apply to all CLINs without exception. All existing water piping must be completely removed as specified. All new water piping must be HDPE piping for all water main projects.

Response for the 2nd part of Question 16. Yes, per Specification Section 01000, Paragraph 1.01 B.5., specifications take precedence over drawings at all times if there is a discrepancy or conflict between specifications and drawings.

Response for the 3rd part of Question 16. South M Street Drawing CU 101 Note 1 states “Existing water line must be cut and removed. Where indicated, replace the words “ABANDON IN PLACE” with “REMOVE IN ITS ENTIRETY.”

General Notes 1 -4 are typical for all drawings.

Q17. Will the government allow the location of the new mains to be adjusted to minimize the amount of bituminous removed? Example clin 0002 sheet cu 104 (greyed out google earth image looks like it under the paved road way).

A17. Response for the 1st part of Question 17. No, the Government will not authorize the routes and locations of new water mains to be adjusted from the new water main routes and locations as represented on the Drawings. Refer to Specifications in its entirety including Section 01000, Part 1 Paragraph 1.01 C.1.e. All new water main piping and laterals must be installed along new routes as represented on Drawings including where shown under paved surfaces. If a water main or lateral is represented on Drawings for installation under a paved surface, then the new water piping or lateral must be installed under the paved surface as shown.

Response for the 2nd part of Question 17. All new water main routes and locations are intentionally designed to be installed as shown on the Drawings.

Q18. Will concrete anchor walls be required at all transitions from HDPE to existing water mains as per spec section 02534 pages 8 -14?

A18. Yes, concrete anchor wall blocks are required for all HDPE pipe transitions (where pipe transitions from HDPE pipe to non-HDPE pipe) as specified in Section 02534 including details and tables. All new HDPE piping must be installed in compliance with Section 02534 including all details and tables for transitions, and design and installation of concrete anchor wall blocks. For clarification, manufacturer installation requirements must not be used to replace or substitute any of the requirements specified in Section 02534 including all details and tables.

Additional Clarifications:

1. Where Drawings show references to thrust blocks, refer to Attachment 2 Specifications in its entirety including Section 02534 (all) and the HDPE piping manufacturer’s installation instructions for the proper installation, joining, transitions, and restraints required for HDPE piping, and Revised Drawings.

SUPPLEMENTAL INFORMATION

Contract Specialist:

Eve Day Phone: 608-388-2263 E-mail: eve.k.day.civ@mail.mil

Contracting Officer:

Steve Bailey Phone: 608-388-6077 Email: steven.m.bailey2.civ@mail.mil

Include the following within the sealed bid package:

1) Completed SF1442 with acknowledgement of all amendments
2) Completed Attachment 15, SF24
3) Any additional verification documents
4) CD-ROM (CD-R) disk with an electronic copy of all submission requirements listed above.

Contractor POC E-mail ______________________________________________

DUNS ________________________________________

TAXPAYER ID # _______________________________

This solicitation is a 100% HUBZone Small Business set-aside under NAICS code 237110 with a size standard of $36.5 Million.

This requirement has a completion date of 30 September 2019.

Bids can be submitted in any of the following ways:

Delivered to or by Mail:

Mission & Installation Contracting Command – Fort McCoy Attn: Eve Day, Contract Specialist 1108 South R Street Fort McCoy, WI 54656-5153

A site visit is scheduled for July 31, 2018 at 1:00 PM Local time. Interested attendees are asked to meet at the Contracting Office; Bldg. 1108. South R Street, Fort McCoy, Wisconsin. The POC for the project is Eve Day at (608) 388-2263. See Site Visit in Section 00100. This will be the only site visit conducted, requests for additional site visits will be denied.

For Site Visit information, see Site Visit clause 52.236-27, Alternate 1 in Section 00100. Unless you already have a permanent vehicle pass, you will be required to obtain a one-day vehicle pass. You will be required to present the following information at the Visitor’s Center: (1) vehicle registration, (2) valid driver’s license, (3) or car rental agreement (if applicable). It is highly recommended that bidders plan to arrive at the Visitor’s Center at least an hour prior to the scheduled time for the site visit. The conference will begin promptly without considerations for late or lost bidders; no subsequent site visits will be considered. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.

Any questions concerns, verification or clarification of information of the documents included in the solicitation package shall be submitted in writing and submitted to the Contract Specialist identified herein no later than 4:00 PM, local time on August 6, 2018. Include in the subject line of the email the Government’s solicitation number; failure to do so will lessen the Government’s ability to ensure all questions are considered during the bidding process. Provide your company name, POC and contact information in the body of the email.

The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222-26(b) (3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm

In accordance with FAR 22.404-10, the contractor must post a copy of the wage determination and Department of Labor Form WH-1321 in a prominent place where employees working on federal construction contracts can easily see it. The applicable wage determination is incorporated into the contract in Attachment 5. The WH-1321 poster is located at http://www.dol.gov/compliance/guide/index.htm

Contractors are referred to EPA’s list of EPA-designated products available at http://www.epa.gov providing products that contain recovered materials.

In accordance with DPAP changes to reporting requirements under FAR 52.223-2, Affirmative Procurement of Bio- based Products under Service and Construction Contracts, contractors are now required to submit annual bio-based reports to the new reporting module in the System for Award Management (SAM). SAM can be accessed at https://www.sam.gov

SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.

1. A DUNS number is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.

1. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 237110 or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.

1. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 237110, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered offeror.

SAM REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at www.sam.gov in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018) and 252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2015) in SAM to be eligible to receive an award for this solicitation.

PROJECT MAGNITUDE

The magnitude of this project is between $1,000,000.00 and $5,000,000.00.

EVALUATION FACTORS

The Government will evaluate bids received in response to this solicitation solely on the basis of price and price related factors. Bidders shall submit a price for each item specified in the solicitation. No bid for a quantity less than that specified in the solicitation will be accepted. Bids shall be evaluated using the quantities set forth in the solicitation. All prices bid in response to this solicitation must include all costs associated with work elements, applicable State sales taxes, permits, and licensure. And the overall project management, superintendence and quality control necessary for the planning and execution of multiple work requirements conducted simultaneously throughout the performance period.

BID GUARANTEE

A Bid Bond/Guarantee is required for this contract if it exceeds $150,000. The Bid Bond amount shall be twenty percent (20%) of the bid price or $3 Million, whichever is less.

Bidders must use the Standard Form (SF) 24 if providing a bid bond as the bid guarantee.

ATTACHMENTS

Attachment 1ATOPSEC
Attachment 2Specifications
Attachment 3CLIN 0001 So B&C Streets Drawings
Attachment 4CLIN 0002 HQ Road Drawings
Attachment 5CLIN 0003 POW Road Drawings
Attachment 6CLIN 0004 So M Street Drawings
Attachment 7CLIN 0005 East N Street Drawings
Attachment 8CLIN 0006 East O Street Drawings
Attachment 9CLIN 0007 So N Street Drawings
Attachment 10CLIN 0008 So P Street Drawings
Attachment 11CLIN 0009 So Q Street Drawings
Attachment 12CLIN 0010 So H Street Drawings
Attachment 13CLIN 0011 So I Street Drawings
Attachment 14Wage Determination WI180008 08/24/2018

Attachment 15 SF24 Attachment 16 Historical Data

(End of Summary of Changes) image1.wmf