W911SA-17-B-2005_Amendment_0001_(f).pdf
PDF 122 KB Posted
- Solicitation number
- W911SA-17-B-2005
About this file
Amendment 0001
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011000050
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide responses to questions and update the w age determination.
POC: Melissa T. Gore, Contract Specialist, 608.388.1251, melissa.t.gore.civ@mail.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 27
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SA-17-B-2005
X 9B. DATED (SEE ITEM 11)
30-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jul-2017
CODE
MICC - FT MCCOY
BLDG 1108 SOUTH R ST
FORT MCCOY WI 54656-5153
W911SA 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SA-17-B-2005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization below has been added:
MICC - FT MCCOY
BLDG 1108 SOUTH R ST
FORT MCCOY WI 54656-5153
The following have been added by full text:
QUESTIONS AND ANSWERS
General
1. Will there be storage areas designated for equipment and supplies located near the work sites?
Yes. Storage areas will be designated providing that materials don’t block access, especially to the parking area near Stillwell.
E Silver Lake Dam Repairs
1. Are we allowed to completely close the road off or do we need to maintain any crossings at any time? See below for specific responses.
a. If allowed to close…
i. How many days can this be closed for? For timeframes for complete closure, Range Control will consider 2‐3 weeks as a preliminary planning guide. This depends on the expected Fort McCoy training schedule. July was indicated as possible month where training exercises drop to lower levels.
When the construction schedule is submitted by contractor, it will be reviewed, and based on the Fort McCoy training schedule, a duration of a complete closure can be approved.
ii. What kind of detour would be necessary? Submit a detour plan for review and approval. At a minimum, signage, barricades, drums, and flashing lights. Please refer to Section 01526 Maintenance of Traffic.
b. If we must maintain one lane…
i. How many days can we be down to one lane? This will depend on the contractor’s anticipated duration of the affected construction phase that will be crossing the road.
ii. What is the min loading required to maintain? According to the designers, the minimum loading would correspond to the AASHTO HL‐93 design load.
iii. What is the required minimum width of the lane? Please refer to Section 01526 Maintenance of Traffic, part 1.06 C, 4, where it indicates a minimum lane width of 12 feet.
iv. Will this need to be signalized during work hours or non‐work for traffic control, or self‐controlled? If this question refers to the use of temporary traffic signals as meaning signalized, Fort
McCoy does not see the need. Please refer to Section 01526 Maintenance of Traffic for specific requirements for attendance of traffic control devices.
2. What is the minimum requirements for flow capacity of the bypass and cofferdam? Sheet S1.1 indicates a Q2 high water elevation 894.3 and Q2 of 65 cfs.
a. Drawing S1.1 has references to the 100 year frequency of 300 cfs, do we need to provide for this flow? No, the 300 cfs represents the final design of the spillway and conduit according to Wisconsin Department of Natural Resources criteria for dam design.
b. Drawing S1.1 has references to the bypass of 65 cfs is this for our design or the existing bypass? This data is the basis of design for the bypass. Recall that the existing 36 inch diameter pipe can remain in service until new structure is complete. Refer to Keynote 6 on Sheet C1.2 of the drawings.
c. Is there a minimum flow required to maintain on the downstream side? The minimum flow on the downstream side shall be limited to the 65 cfs.
Stillwell Lake Dam Repairs
1. Are we allowed to completely close the road off or do we need to maintain any crossings at any time? See below for specific responses.
a. If allowed to close…
i. How many days can this be closed for? For timeframes for complete closure, Range Control will consider 2‐3 weeks as a preliminary planning guide. This depends on the expected Fort McCoy training schedule. July was indicated as a possible month where training exercises drop to lower levels.
When the construction schedule is submitted by contractor, it will be reviewed, and based on the Fort McCoy training schedule, the duration of a complete closure can be approved.
The road over Stillwell Dam is an alternate route for emergency traffic in case of a catastrophe on State Highway
21. It is also the route which ammunition is transported from the Ammunition Supply Point to training areas and ranges, so advance submittal of closure requests would be helpful for everyone to assess proposed routes and timeframes.
ii. What kind of detour would be necessary? Submit a detour plan for review and approval. At a minimum, signage, barricades, drums, and flashing lights. Please refer to Section 01526 Maintenance of Traffic.
b. If we must maintain one lane…
i. How many days can we be down to one lane? This will depend on the contractor’s anticipated duration of the affected construction phase that will be crossing the road.
ii. What is the min loading required to maintain? According to the designers, the minimum loading would correspond to the AASHTO HL‐93 design load.
iii. What is the required minimum width of the lane? Please refer to Section 01526 Maintenance of Traffic 1.06 C, 4, where it indicates a minimum travel lane width of 12 feet.
iv. Will this need to be signalized during work hours or non‐work for traffic control, or self‐controlled? If this question refers to the use of temporary traffic signals as meaning signalized, Fort McCoy does not see the need. Please refer to Section 01526 Maintenance of Traffic for specific requirements for attendance of traffic control devices.
2. What is the minimum requirements for flow capacity of the bypass and cofferdam? Please refer to Sheet S1.1 where it indicates Q2 of 70cfs and Q2 high water elevation of 939.3 ft. Please also note the maximum drawdown elevation is elevation 936.00.
a. Drawing S1.1 has references to the 100 year frequency of 300 cfs, do we need to provide for this flow? No, the 300 cfs represents the final design of the spillway and conduit according to Wisconsin Department of Natural Resources criteria for dam design.
b. Drawing S1.1 has references to the bypass of 65 cfs is this for our design or the existing bypass? This will be for the temporary bypass. Please refer to Drawing S1.1 where it refers to the Q2 of 70 cfs and a Q2 water elevation of 939.3. Note also that the maximum pool drawdown level is elevation 936.00
c. Is there a minimum flow required to maintain on the downstream side? The minimum flow in this case would correspond to the maximum discharge velocity of 5 feet per second. Please refer to the notes under the hydraulic data on Sheet S1.1.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SPECIAL CONTRACT REQUIREMENTS
HOURS OF OPERATION
a. Contractor shall schedule working hours to coincide with the working hours of the military reservation.
The normal working hours are 7:00 a.m. to 4:30 p.m. Monday through Friday excluding Federal Holidays.
Federal Holidays are as follows:
January 1st 1st Monday of September 3rd Monday of January 2nd Monday of October 3rd Monday of February November 11th Last Monday of May 4th Thursday of November July 4th December 25th
When a Federal holiday falls on a Sunday, the following Monday will be considered the official observed holiday; likewise, when a Federal holiday falls on a Saturday, the preceding Friday will be considered the official observed holiday. At no time will contractor personnel be excused from performing contracted work as a result of other Congressional or Presidential imposed excused absence of Department of Army civilians or uniformed military personnel.
b. Any and all work requested by the contractor outside the normal working hours identified above shall be approved no later than three business days in advance and in writing by the Contracting Officer. Work outside the normal workday will not be granted for the express convenience of the contractor to repair a failing performance schedule. Re-scheduling of work prevented by weather conditions or other circumstances beyond the contractor’s control should be made through a written request for extension of the task order contract period under the authority of 52.236-2, Differing Site Conditions, or 52.249-10, Termination for Default (Fixed-Price Construction).
LEGAL COMPLIANCE
The Contractor shall comply with all Federal, State, and Local laws, codes, and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.
RAPID GATE
Fort McCoy is offering an Installation Access Control Solution called the RAPIDGate Program. This program is available, with installation approval, to new and existing vendors, contractors, sub-contractors and service providers who require routine access to Fort McCoy and desire streamlined entry into the Installation. This program is available at a registration cost to the company, with an additional fee per employee.
Through two integrated processes - Access Privilege Management and Enrollment/Registration - the RAPIDGate Program enables electronic verification of identity and access privileges at Fort McCoy's access control points (ACPs).
Companies choosing to participate in the RAPIDGate Program will have streamlined access onto the installation. Participants will have access through all gates that size permits (Main Gate and Gate 20) and will be subject to RANDOM vehicle inspections. At the Main Gate RAPIDGate participants will be able to use either lane, enabling fast access onto the installation through that gate.
Non-RAPIDGate participants and companies that choose not to participate in the RAPIDGate Program will be required to access the installation through Gate 20, whereby a Temporary day pass will be issued for each person. Contracts with a duration of 30 days or less will be required to apply for a pass under an exception to policy. The maximum pass period AS an exception to policy is 30 days with approval by the DES Physical Security Branch. To apply for a 30 day pass, the company is required to provide
Physical Security a copy of the contract award, along with identification.
Companies that service Fort McCoy may enroll in the RAPIDGate Program by calling 1-877-RAPIDGate (1- 877-727-4342). The Program will confirm with the installation Physical Security Branch that the company has legitimate business on the installation. Once the company has enrolled, its employees can register at the self- service KIOSK Registration Stations located at the Fort McCoy Visitor Control Center (VCC) in building 35.
The RAPIDGate Program confirms the individual's employment status with the company, and then performs identity authentication and background screening. Employees who qualify are issued a personalized RAPIDGate ID Credential Badge. The Program performs background screening on a regular basis to verify continued eligibility in the Program.
Questions about the Fort McCoy RAPIDGate Program should be addressed to info@rapidgate.com with the subject line RE: RAPIDGate Program, or to the Physical Security Branch, Directorate of Emergency Services at 608-388-3794 or mark.a.reaves.civ@mail.mil.
CONTRACT PROGRESS REPORTING
a. The Contract Progress Schedule, will be used to satisfy the submission requirements of FAR 52.236-15, “Schedules for Construction Contracts”. The Contractor shall, within ten (10) days after contact award, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment).
b. Work elements entered in column B of the progress schedule should be limited to those tasks which will indicate the progress of the work under the contract and which can be identified and measured by personnel monitoring the Contractor’s progress.
c. Appropriate revisions will be made to the existing approved progress schedule whenever an approved change to the performance period is authorized by a contract modification. No adjustments or extensions in the performance period will be authorized without a duly executed contract modification.
d. A “Contract Progress Report”, shall be initiated weekly and delivered to the Contracting Officer and the COR simultaneously. Progress reports shall include both the percentage of work completed within the rated period and a cumulative total of work completed under the contract/task order to date. Progress reports shall be issued weekly; submitted progress reports will be reviewed by the Contracting Officer (or designated representative) and returned for correction as necessary.
ENG FORM 4025-R
ENG Form 4025-R, Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer’s Certifications, shall be used in satisfying the material approval requirements of FAR 52.236-5.
All material submittals shall be delivered to the Contracting Officer (or authorized representative) in electronic format (as much as is practicable). Only those submittal documents and samples not capable of being transported electronically are to be submitted in hard copy. Hard copy submittals shall be delivered to a designated location at the main entrance desk in Building 2171. Electronic submissions shall be sent to:
Administrative POC and usarmy.mccoy.imcom-northeast.mail.dpw-inspections@mail.mil
Questions on the status of submittals shall be directed to the Contracting Officer (or authorized representative) via e-mail. Questions sent to usarmy.mccoy.imcom-northeast.mail.dpw-inspections@mail.mil will not be answered.
Project schedules shall be submitted the same as all other submittals and shall be accompanied by a transmittal sheet. The contract specialist (CS) will return the signed schedule and transmittal to the contractors and copy the COR.
Submittal/transmittal sheets with any incorrect or missing information will be rejected immediately without review. Rejection of incorrectly completed transmittals shall not be a basis for consideration for a contract extension.
FINAL INSPECTION
a. When the Contractor considers the work complete, they shall request a final inspection 7 days prior to the desired date. Final inspection shall be performed with the Contractor, Government personnel and representatives of the using activity.
b. During the final inspection, any discrepancies identified by the Government team will be documented in the Government’s punch list and provided to the Contractor for correction and re-inspection within 10 days from the date of the joint inspection.
c. Final acceptance of the work occurs upon the Contracting Officer’s acceptance of the work subsequent to successful final inspection by the COR and receipt of all contract requirements. Final acceptance must occur prior to the established contract completion date or liquidated damages may be assessed for late performance.
REQUIRED INSURANCE
In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.
Workmen’s Compensation As required by state laws Employer’s Liability Insurance $100,000 General Liability Insurance $500,000 per occurrence Bodily Injury Liability
Auto Liability Insurance $200,000 per person
Bodily Injury $500,000 per occurrence Property Damage $20,000 per occurrence
CONSENT OF SURETY
In accordance with FAR 28.106-5, consent of surety will be required if
a. An additional bond is required to support a modification to the contract, and the bond obtained is from a surety different than the original surety;
b. The contract is modified, without any additional bond being required, and the modification changes the contract price (upward or downward) by more than 25% or $50,000; or
c. A novation agreement is requested by the Contractor.
BONA FIDE NEED
Defense Financial Management Regulation (Vol. 3, Ch. 8, para. 080303.C) requires that work obligated by funds in the current fiscal year commence prior to1 January of the following calendar year if obligation occurred near the end of the fiscal year. Commencement can be physical on-site work or documented evidence that costs have been incurred or materials have been ordered. It is anticipated that the notice to proceed or task order will be issued in sufficient time to comply with this regulation. However, the Contractor shall not commence work until after the date of receipt of the notice to proceed or task order.
WAGE DETERMINATION
General Decision Number: WI170010 07/21/2017 WI10
Superseded General Decision Number: WI20160010
State: Wisconsin
Construction Type: Highway
Counties: Wisconsin Statewide.
HIGHWAY, AIRPORT RUNWAY & TAXIWAY CONSTRUCTION PROJECTS (does not include bridges over navigable waters; tunnels; buildings in highway rest areas; and railroad construction)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 02/03/2017 2 02/10/2017 3 02/24/2017 4 03/17/2017 5 03/31/2017 6 04/21/2017 7 04/28/2017 8 06/02/2017 9 06/23/2017 10 07/14/2017 11 07/21/2017
BRWI0001-002 06/01/2016
CRAWFORD, JACKSON, JUNEAU, LA CROSSE, MONROE, TREMPEALEAU, AND
VERNON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 31.84 20.95
BRWI0002-002 06/01/2016
ASHLAND, BAYFIELD, DOUGLAS, AND IRON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 37.04 19.70
BRWI0002-005 06/01/2016
ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA,
CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC,
FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE,
LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE,
OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST CROIX, SAUK,
SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA,
WINNEBAGO, AND WOOD COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 35.07 20.51
BRWI0003-002 06/01/2016
BROWN, DOOR, FLORENCE, KEWAUNEE, MARINETTE, AND OCONTO COUNTIES
Rates Fringes
BRICKLAYER.......................$ 32.22 20.57
BRWI0004-002 06/01/2016
KENOSHA, RACINE, AND WALWORTH COUNTIES
Rates Fringes
BRICKLAYER.......................$ 36.59 21.49
BRWI0006-002 06/01/2016
ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MARATHON, MENOMINEE,
ONEIDA, PORTAGE, PRICE, TAYLOR, VILAS AND WOOD COUNTIES
BRICKLAYER.......................$ 33.04 19.75
BRWI0007-002 06/01/2016
GREEN, LAFAYETTE, AND ROCK COUNTIES
Rates Fringes
BRICKLAYER.......................$ 33.53 20.95
BRWI0008-002 06/01/2016
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
BRICKLAYER.......................$ 36.98 20.62
BRWI0011-002 06/01/2016
CALUMET, FOND DU LAC, MANITOWOC, AND SHEBOYGAN COUNTIES
BRICKLAYER.......................$ 32.22 20.57
BRWI0019-002 06/01/2016
BARRON, BUFFALO, BURNETT, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN,
PIERCE, POLK, RUSK, ST. CROIX, SAWYER AND WASHBURN COUNTIES
BRICKLAYER.......................$ 31.98 20.81
BRWI0034-002 06/01/2015
COLUMBIA AND SAUK COUNTIES
Rates Fringes
BRICKLAYER.......................$ 32.86 17.22
CARP0087-001 05/01/2016
BURNETT (W. of Hwy 48), PIERCE (W. of Hwy 29), POLK (W. of Hwys 35, 48 & 65), AND ST. CROIX (W. of Hwy 65) COUNTIES
Carpenter & Piledrivermen........$ 36.85 18.39
CARP0252-002 06/01/2016
ADAMS, BARRON, BAYFIELD (Eastern 2/3), BROWN, BUFFALO, BURNETT (E. of Hwy 48), CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DANE, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE (except area bordering Michigan State Line), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE (except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE (E.
of Hwys 29 & 65), POLK (E. of Hwys 35, 48 & 65), PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST CROIX (E. of Hwy 65), TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD
COUNTIES
CARPENTER
CARPENTER...................$ 33.56 18.00
MILLWRIGHT..................$ 35.08 18.35
PILEDRIVER..................$ 34.12 18.00
CARP0252-010 06/01/2016
ASHLAND COUNTY
Carpenters Carpenter...................$ 33.56 18.00 Millwright..................$ 35.08 18.35 Pile Driver.................$ 34.12 18.00
CARP0264-003 06/01/2016
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WAUKESHA, AND WASHINGTON
CARPENTER........................$ 35.78 22.11
CARP0361-004 05/01/2016
BAYFIELD (West of Hwy 63) AND DOUGLAS COUNTIES
Rates Fringes
CARPENTER........................$ 34.57 18.16
CARP2337-001 06/01/2016
ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON
ZONE B: KENOSHA & RACINE
PILEDRIVERMAN
Zone A......................$ 31.03 22.69 Zone B......................$ 31.03 22.69
ELEC0014-002 05/30/2016
ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK
(except Maryville, Colby, Unity, Sherman, Fremont, Lynn & Sherwood), CRAWFORD, DUNN, EAU CLAIRE, GRANT, IRON, JACKSON, LA
CROSSE, MONROE, PEPIN, PIERCE, POLK, PRICE, RICHLAND, RUSK, ST
CROIX, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN
Electricians:....................$ 32.00 19.28
ELEC0014-007 05/30/2016
REMAINING COUNTIES
Teledata System Installer Installer/Technician........$ 24.35 13.15
Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).
ELEC0127-002 06/01/2016
KENOSHA COUNTY
Rates Fringes
Electricians:....................$ 37.71 30%+10.02
ELEC0158-002 05/30/2016
BROWN, DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES
Electricians:....................$ 30.50 29.50% + 9.57
ELEC0159-003 05/30/2016
COLUMBIA, DANE, DODGE (Area West of Hwy 26, except Chester and Emmet Townships), GREEN, LAKE (except Townships of Berlin, Seneca, and St. Marie), IOWA, MARQUETTE (except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), and SAUK
Electricians:....................$ 36.50 20.39
ELEC0219-004 06/01/2016
FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)
Electricians:
Electrical contracts over $180,000....................$ 32.38 18.63 Electrical contracts under $180,000....................$ 30.18 18.42
ELEC0242-005 06/04/2017
DOUGLAS COUNTY
Rates Fringes
Electricians:....................$ 35.90 25.64
ELEC0388-002 05/30/2016
ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARATHON, MARINETTE (Beecher, Dunbar, Goodman & Pembine), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Aniwa and Hutchins), VILAS
AND WOOD COUNTIES
Electricians:....................$ 30.69 26.00% +10.05
ELEC0430-002 06/01/2017
RACINE COUNTY (Except Burlington Township)
Rates Fringes
Electricians:....................$ 37.32 21.07
* ELEC0494-005 06/01/2017
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
Electricians:....................$ 37.51 24.42
ELEC0494-006 06/01/2017
CALUMET (Township of New Holstein), DODGE (East of Hwy 26 including Chester Township), FOND DU LAC, MANITOWOC (Schleswig), and SHEBOYGAN COUNTIES
Electricians:....................$ 32.06 21.88
ELEC0494-013 06/01/2015
DODGE (East of Hwy 26 including Chester Twp, excluding Emmet Twp), FOND DU LAC (Except Waupuin), MILWAUKEE, OZAUKEE, MANITOWOC (Schleswig), WASHINGTON, AND WAUKESHA COUNTIES
Sound & Communications Installer...................$ 16.47 14.84 Technician..................$ 26.00 17.70
Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems.
Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system. work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products
ELEC0577-003 05/30/2016
CALUMET (except Township of New Holstein), GREEN LAKE (N. part including Townships of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), OUTAGAMIE, WAUPACA, WAUSHARA, AND WINNEBAGO
Electricians:....................$ 30.68 17.28
ELEC0890-003 06/01/2016
DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, RACINE (Burlington Township), ROCK AND WALWORTH COUNTIES
Electricians:....................$ 32.45 26.10% + $10.56
ELEC0953-001 07/01/2015
Rates Fringes
Line Construction:
(1) Lineman.................$ 42.14 32% + 5.00
(2) Heavy Equipment Operator....................$ 40.03 32% + 5.00
(3) Equipment Operator......$ 33.71 32% + 5.00
(4) Heavy Groundman Driver..$ 26.78 14.11
(5) Light Groundman Driver..$ 24.86 13.45
(6) Groundsman..............$ 23.18 32% + 5.00
ENGI0139-005 06/01/2016
Rates Fringes
Power Equipment Operator Group 1.....................$ 39.27 21.80 Group 2.....................$ 38.77 21.80 Group 3.....................$ 38.27 21.80 Group 4.....................$ 38.01 21.80 Group 5.....................$ 37.72 21.80 Group 6.....................$ 31.82 21.80
HAZARDOUS WASTE PREMIUMS:
EPA Level "A" protection - $3.00 per hour EPA Level "B" protection - $2.00 per hour EPA Level "C" protection - $1.00 per hour
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, tower cranes, and derricks with or without attachments with a lifting capacity of over 100 tons; or cranes, tower cranes, and derricks with boom, leads and/or jib lengths measuring 176 feet or longer.
GROUP 2: Cranes, tower cranes and derricks with or without attachments with a lifting capacity of 100 tons or less; or cranes, tower cranes, and derricks with boom, leads, and/or jibs lengths measuring 175 feet or under and Backhoes (excavators) weighing 130,000 lbs and over; caisson rigs;
pile driver; dredge operator; dredge engineer; Boat Pilot.
GROUP 3: Mechanic or welder - Heavy duty equipment; cranes with a lifting capacity of 25 tons or under; concrete breaker (manual or remote); vibratory/sonic concrete breaker; concrete laser screed; concrete slipform paver;
concrete batch plant operator; concrete pvt. spreader -heavy duty (rubber tired); concrete spreader & distributor;
automatic subgrader (concrete); concrete grinder & planing machine; concrete slipform curb & gutter machine; slipform concrete placer; tube finisher; hydro blaster (10,000 psi & over); bridge paver; concrete conveyor system; concrete pump; Rotec type Conveyor; stabilizing mixer (self-propelled); shoulder widener; asphalt plant engineer;
bituminious paver; bump cutter & grooving machine; milling machine; screed (bituminous paver); asphalt heater, planer & scarifier; Backhoes (excavators) weighing under 130,000 lbs; grader or motor patrol; tractor (scraper, dozer, pusher, loader); scraper - rubber tired (single or twin engine); endloader; hydraulic backhoe (tractor type);
trenching machine; skid rigs; tractor, side boom (heavy);
drilling or boring machine (mechanical heavy); roller over 5 tons; percussion or rotary drilling machine; air track;
blaster; loading machine (conveyor); tugger; boatmen;
winches & A-frames; post driver; material hoist.
GROUP 4: Greaser, roller steel (5 tons or less); roller (pneumatic tired) - self propelled; tractor (mounted or towed compactors & light equipment); shouldering machine;
self- propelled chip spreader; concrete spreader; finishing machine; mechanical float; curing machine; power subgrader;
joint sawer (multiple blade) belting machine; burlap machine; texturing machine; tractor endloader (rubber tired) - light; jeep digger; forklift; mulcher; launch operator; fireman, environmental burner
GROUP 5: Air compressor; power pack; vibrator hammer and extractor; heavy equipment, leadman; tank car heaters;
stump chipper; curb machine operator; Concrete proportioning plants; generators; mudjack operator; rock breaker; crusher or screening plant; screed (milling machine); automatic belt conveyor and surge bin; pug mill operator; Oiler, pump (over 3 inches); Drilling Machine Tender.
GROUP 6: Off-road material hauler with or without ejector.
IRON0008-002 06/01/2016
BROWN, CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC,
MARINETTE, OCONTO, OUTAGAMI, SHAWANO, SHEBOYGAN, AND WINNEBAGO
COUNTIES:
IRONWORKER.......................$ 30.86 25.42
Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.
IRON0008-003 06/01/2016
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WALWORTH (N.E. 2/3),
WASHINGTON, AND WAUKESHA COUNTIES
IRONWORKER.......................$ 33.15 25.42
Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.
IRON0383-001 06/01/2015
ADAMS, COLUMBIA, CRAWFORD, DANE, DODGE, FLORENCE, FOREST,
GRANT, GREENE, (Excluding S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LA CROSSE, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, ROCK (Northern area, vicinity of Edgerton and Milton), SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD COUNTIES
IRONWORKER.......................$ 32.85 21.84
IRON0498-005 06/01/2016
GREEN (S.E. 1/3), ROCK (South of Edgerton and Milton), and
WALWORTH (S.W. 1/3) COUNTIES:
IRONWORKER.......................$ 36.29 30.77
IRON0512-008 05/01/2015
BARRON, BUFFALO, CHIPPEWA, CLARK, DUNN, EAU CLAIRE, JACKSON,
PEPIN, PIERCE, POLK, RUSK, ST CROIX, TAYLOR, AND TREMPEALEAU
IRONWORKER.......................$ 35.50 23.45
IRON0512-021 05/01/2015
ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, LINCOLN, ONEIDA,
PRICE, SAWYER, VILAS AND WASHBURN COUNTIES
IRONWORKER.......................$ 31.04 23.45
LABO0113-002 06/05/2017
MILWAUKEE AND WAUKESHA COUNTIES
LABORER
Group 1.....................$ 26.80 21.34 Group 2.....................$ 26.95 21.34 Group 3.....................$ 27.15 21.34 Group 4.....................$ 27.30 21.34 Group 5.....................$ 27.45 21.34 Group 6.....................$ 23.29 21.34
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster and Powderman
GROUP 6: Flagperson; traffic control person
LABO0113-003 06/05/2017
OZAUKEE AND WASHINGTON COUNTIES
Rates Fringes
LABORER
Group 1.....................$ 26.05 21.34 Group 2.....................$ 26.15 21.34 Group 3.....................$ 26.20 21.34 Group 4.....................$ 26.40 21.34 Group 5.....................$ 26.25 21.34 Group 6.....................$ 23.14 21.34
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated);
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster; powderman
GROUP 6: Flagperson and Traffic Control Person
LABO0113-011 06/05/2017
KENOSHA AND RACINE COUNTIES
Rates Fringes
LABORER
Group 1.....................$ 25.86 21.34 Group 2.....................$ 26.01 21.34 Group 3.....................$ 26.21 21.34 Group 4.....................$ 26.18 21.34 Group 5.....................$ 26.51 21.34 Group 6.....................$ 23.00 21.34
LABORERS CLASSIFICATIONS:
GROUP 1: General laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster and Powderman
GROUP 6: Flagman; traffic control person
LABO0140-002 06/05/2017
ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT,
CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR,
DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST,
GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA,
JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN,
MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE,
OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE,
RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST.
CROIX, TAYLOR, TREMPEALEAU, VERNON, VILLAS, WALWORTH, WASHBURN,
WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES
LABORER
Group 1.....................$ 30.71 21.34 Group 2.....................$ 30.81 21.34 Group 3.....................$ 30.86 21.34 Group 4.....................$ 31.06 21.34 Group 5.....................$ 30.91 21.34 Group 6.....................$ 27.34 21.34
LABORER CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bitminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator, Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk and Pavement); Strike Off Man
GROUP 4: Line and Grade Secialist
GROUP 5: Blaster; powderman
GROUP 6: Flagperson; Traffic Control
LABO0464-003 06/05/2017
DANE COUNTY
LABORER
Group 1.....................$ 30.99 21.34 Group 2.....................$ 31.09 21.34 Group 3.....................$ 31.14 21.34 Group 4.....................$ 31.34 21.34 Group 5.....................$ 31.19 21.34 Group 6.....................$ 27.34 21.34
LABORERS CLASSIFICATIONS:
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminious Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster; Powderman
GROUP 6: Flagperson and Traffic Control Person
PAIN0106-008 05/02/2016
ASHLAND, BAYFIELD, BURNETT, AND DOUGLAS COUNTIES
Rates Fringes
Painters:
New:
Brush, Roller..............$ 29.86 16.35 Spray, Sandblast, Steel....$ 30.46 16.35 Repaint:
Brush, Roller..............$ 28.36 16.35 Spray, Sandblast, Steel....$ 28.96 16.35
PAIN0108-002 06/01/2016
RACINE COUNTY
Rates Fringes
Painters:
Brush, Roller...............$ 32.74 18.70
Spray & Sandblast...........$ 33.74 18.70
PAIN0259-002 05/01/2008
BARRON, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN, PIERCE, POLK, RUSK,
SAWYER, ST. CROIX, AND WASHBURN COUNTIES
PAINTER..........................$ 24.11 12.15
PAIN0259-004 05/01/2015
BUFFALO, CRAWFORD, JACKSON, LA CROSSE, MONROE, TREMPEALEAU, AND
PAINTER..........................$ 22.03 12.45
PAIN0781-002 06/01/2016
JEFFERSON, MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
Painters:
Bridge......................$ 30.42 22.19 Brush.......................$ 30.07 22.19 Spray & Sandblast...........$ 30.82 22.19
PAIN0802-002 06/01/2016
COLUMBIA, DANE, DODGE, GRANT, GREEN, IOWA, LAFAYETTE, RICHLAND,
ROCK, AND SAUK COUNTIES
PAINTER
Brush.......................$ 27.50 17.72
PREMIUM PAY:
Structural Steel, Spray, Bridges = $1.00 additional per hour.
PAIN0802-003 06/01/2016
ADAMS, BROWN, CALUMET, CLARK, DOOR, FOND DU LAC, FOREST, GREEN
LAKE, IRON, JUNEAU, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC,
MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA,
OUTAGAMIE, PORTAGE, PRICE, SHAWANO, SHEBOYGAN, TAYLOR, VILAS,
WAUSHARA, WAUPACA, WINNEBAGO, AND WOOD COUNTIES
PAINTER..........................$ 24.39 11.72
PAIN0934-001 06/01/2016
KENOSHA AND WALWORTH COUNTIES
Rates Fringes
Painters:
Brush.......................$ 32.74 18.70 Spray.......................$ 33.74 18.70 Structural Steel............$ 32.89 18.70
PAIN1011-002 06/01/2016
FLORENCE COUNTY
Rates Fringes
Painters:........................$ 24.56 11.93
PLAS0599-010 06/01/2017
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
Area 1......................$ 39.46 17.17 Area 2 (BAC)................$ 35.07 19.75 Area 3......................$ 35.61 19.40 Area 4......................$ 34.70 20.51 Area 5......................$ 36.27 18.73 Area 6......................$ 32.02 22.99
AREA DESCRIPTIONS
AREA 1: BAYFIELD, DOUGLAS, PRICE, SAWYER, AND WASHBURN
COUNTIES
AREA 2: ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET,
CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE,
FOND DU LAC, FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE,
LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE,
MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK,
PORTAGE, RUSK, ST CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR,
VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD
COUNTIES
AREA 3: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA
CROSSE MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND
AREA 4: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
AREA 5: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK
AREA 6: KENOSHA AND RACINE COUNTIES
TEAM0039-001 06/01/2017
Rates Fringes
TRUCK DRIVER
1 & 2 Axles.................$ 27.40 20.48 3 or more Axles; Euclids Dumptor & Articulated, Truck Mechanic..............$ 27.55 20.48
WELL DRILLER.....................$ 16.52 3.70
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .