Repair Digester Cover at the Waste Water Treatment Plant in Fort McCoy, Wisconsin
Solicitation number
W911SA-17-B-0026
Issued by

About this file

Attachment 8 - Updated Bid Schedule

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT LINE ITEM PRICING SCHEDULE

ITEM NO.
DESCRIPTION
EST.

QTY

UNIT
UNIT PRICE
ESTIMATED AMOUNT

BASIC ITEMS

All work complete for Repair Digester, Fort McCoy Wisconsin in accordance with the plans and specifications excluding Items No. 0002 – 0006 and Items below

Job

XXX

All work complete for initial cleaning of tanks

Job

All work complete to repair cracks in tanks

LF

All work complete to repair water control joints in tanks

LF

All work complete to repair concrete spalls above rebar in tanks

SF

All work complete to repair concrete spalls below rebar in tanks

SF

TOTAL BASIC AMOUNT $_____________________________

Offerors should provide pricing for the following CLINs as provided in Notes 1-5 below. These items may be awarded at a later date, via unilateral modification, if deemed necessary by the Government. Work shall only be performed when funded and a unilateral modification is provided to the awardee. These items will be evaluated as part of the award decision.

All work complete for coating of existing Digester Tank (Structure 60), including all associated surface preparation not included in Basic Items above

0007A

Additional cost for Surface Coating System #33 Modified, Polymide Primer and Polyurea Coating

Job

0007B

Surface Coating System #34 Modified, Epoxy Mortar 125 mils DFT Mortar in lieu of Item 0007A, See NOTE 5 below

Job

All work complete for coating of existing Sludge Holding Tank (Structure 62), including all associated surface preparation not included in Basic Items above

0008A

Additional cost for Surface Coating System #33 Modified, Polymide Primer and Polyurea Coating

Job

0008B

Surface Coating System #34 Modified, Epoxy Mortar 125 mils DFT Mortar in lieu of Item 0008A, See NOTE 5 below

Job

TOTAL AMOUNT $_________________________________

TOTAL AMOUNT (BASIC PLUS 0007 & 0008) $_________________________________

NOTES:

1. The Government reserves the right to fund 0007 within 30 calendar days after initial cleaning of existing Digester Tank (Structure 60) and 0008 within 30 calendar days after initial cleaning of existing Sludge Holding Tank (Structure 62).

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. In case of variation between the lumpsum prices and the total amount, the lumpsum prices will be considered the price submitted. In case of variation between the unit prices and the extensions, the unit prices will be considered the price submitted.

3. A modification to a proposal which provides for a single adjustment to the total amounts, should state the application of the adjustment to each respective lumpsum price and unit price affected.

4. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause “Variation in Estimated Quantities”.

5. For Items 0007 and 0008:

If the coating system described in sub-item B costs less than coating system described in sub-item A, enter the difference between the coating systems as a negative number for the estimated amount corresponding to sub-item B. In this case, show the amount for sub-item B in parentheses as follows ($_______) and deduct this amount from the amount shown for sub-item A when figuring the total amount.

Evaluation Notes: Award will be made to the overall lowest bid of all the above items 0001-0008. The intent is to award all of the basic items (0001 to 0006) listed above during the initial award. Items 0007 - 0008 may be awarded at a later date, via unilateral modification, if deemed necessary by the Government. Work shall only be performed when funded and a unilateral modification is provided to the awardee.