W911SA-17-B-0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC
180 dys. ADC
1
PR W0F4 USARC EL MONTE

MS. CINDY VILLANUEVA

1200 N POTRERO ROAD

SOUTH EL MONTE CA 91733-3064

818-403-0900 FOB: Destination W62N8B

To:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC
270 dys. ADC
1
PR W0F4 USARC EL MONTE

MS. CINDY VILLANUEVA

1200 N POTRERO ROAD

SOUTH EL MONTE CA 91733-3064

818-403-0900 FOB: Destination W62N8B

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

QUESTIONS & ANSWERS

Q1: 4.1.14/ 4.2.10 - Is Dalt Testing Required? The Spec Does Not Call Out For That Test But It Was Stated On The Walk That All Testing Must Be Done. Please Clarify.

A1: Yes

Q2: 4.1.15 – Is The Required Training To Be Video Recorded At The Time Training Is Conducted?

A2: Video Is Not Required

Q3: 2.2.1 – Dose The Facility Want The Old Refrigerant That Is Recovered Back From The Vrf Units?

A4: Refrigerant To Be Properly Disposed Of Off-Site By The Contractor.

Q4: It Was Stated At The Job Walk That The Work Would Be Broken Into Two Phases Per Building. Please Clarify This.

A4: During Demo And Installation Personnel Will Be Shifted As Much As Possible But Construction In Some Areas Will Have To Be Phased. This Will Be Limited As Much As Possible.

Q5: There Currently Is No Ventilation In The Gun Locker/ Safe In B-8. Is Heating And Cooling Needed In This Space?

A5: No

Q6: Is There A Current Lead, Asbestos/ Hazmat Survey For Both Buildings? We Did See Tsi Insulation In B-6 While On The Walk.

A6: Lead – Asbestos Survey Will Be Supplied.

Q7: The Duration For The Project Is 180 Calendar Days. Does This Include Design?

A7: Scope Will Be Revised To Provide 90 Days For Design And 180 Days For Construction.

Q8: Scope Calls Out For The Contractor To Replace All Broken Or Damaged Ceiling Tiles That May Be Damaged By Our Work On Site. Does This Also Include Any Tiles That A Damaged Prior To The Start Of Our Work?

A8: Contractor Is Only Responsible For Any Tiles That He Damages.

Q9: There Are Several Through-Wall Ac Units On B-8, Once These Are Removed, How Does The Government Want These Holes In filled?

A9: Thru-Wall Units Will Be Left In Place For Backup Use.

Q10: There Are Several Wall Mounted Mini-Split Units Throughout B-6. The Scope Does Not Call Out For These To Be Replaced, Are We To Include Their Replacement In This Scope?

A10: All Wall Mounted Units In Bldg-6 Are To Be Removed. They Are Old Vrf Units Being Replaced By New System. Drawings Are For Reference Only. New System Must Be Designed To Cover All Climate Controlled Areas.

Q11: The Current Electrical Supply Into B-6 Does Not Met Current Code. It Goes Directly From The Underground Feed Up To A Large Non-Fused Disconnect Then Feed To Sub Disconnects Which Weed Sub Panels Through Wire Chases. Are We To Make The Current Electrical System Code As Part Of Our Scope?

A11: A Main Panel Will Need To Be Installed At Entrance To Meet Requirements.

Q12: While On The Walk We Noticed Two Sets Of What Looks To Be Like Heat Water Loops Going From B-8 To The High Bay Building Next To It. There Is No Mention In The Scope Of Toughing This Building. Are We To Include The Upgrade Of This Section In Our Scope? If So, Please Provide As-Builds Of The High Bay Building.

A12: Heating / Cooling Loops To Oms Building Will Be Cut Back And Capped / Removed At Entry Point To Oms.

Q13: Does The Scope Include The Exhaust Systems To Be Replaced For Each Building?

A13: Yes

Q14: Building 6; The Rfp Calls For Reusing The Existing Vrf Piping, Typically Going From R-22 To R410a Requires A Larger Pipe Size, Please Clarify - A14: Piping Will Be Removed And Replaced As Necessary.

Q15: Will Both Building Be Occupied During Construction?

A15: During Demo And Installation Personnel Will Be Shifted As Much As Possible But Construction In Some Areas Will Have To Be Phased. This Will Be Limited As Much As Possible.

Q16: Will Temporary Cooling Or Heating Units Be Required During Construction?

A15: No

Q17: Provide As-Builds For Building 6 Existing Vrf System: Location Of Indoor Vrf Fan Coil Units. The As-Builds Provided Are For Building 8 Only.

A17: There Are No As-Builds For The Vrf System In Bldg-6

Q18: Confirm Contractor To Replace Like-For-Like Existing Vrf Fan Coil Units At Building 6?

A18: Contractor Will Install New Fan Coil Units With Fresh Air Makeup Capabiliities.

Q19: Building 8 Is The Contractor Required To Replace The Existing Kitchen Ventilation System: Exhaust Fans And Make Up Air Unit?

A19: Hood Fan Is Compliant. New Makeup Air Unit Is Required.

Q20: Building 8 Is The Contractor Required To Replace The Existing Exhaust Fans?

A20: Yes

Q21: Confirm 3rd Party Commissioning Agent Will Be Provided By The US Army?

A21: Contractor Is Responsible For 3rd Party Commissioning.

Q22: Rfp States All Work Shall Be Completed Within 180 Days Upon Receipt Of Notice To Proceed. The Design Submittal Process Will Take 3-4 Months. Construction Duration Will Take 6-8 Months. We Request 365 Days To Complete This Project.

A22: Scope Will Be Revised To Provide 90 Days For Design And 180 Days For Construction.

Q23: We Request The Bid Date Extended (2) Weeks After The Rfi Responses Are Sent Back.

A23: Bid Due Date Has Been Revised.

Q24: What Is The Licensing Requirements?

A24: There Are No Special Licensing Requirements For This Project.

Q25: The Provided As-Builds Do Not Use The Building Numbers Referenced In The Scope Of Work. Please Clearly Delineate Which Buildings Are To Have Their Hvac Systems Removed And Replace.

A25: Bldg-6 Is The T-Shaped Building. Bldg-8 Is The Main Reserve Center.

Q26: There Is Asbestos In Both Of The Buildings. Extent Is Unknown. We Request Current Hazardous Material Reports For This Building.

A26: A6: Lead – Asbestos Survey Will Be Supplied.

Q27: We Request Electrical As-Built Drawings For Bldgs. 6&8.

A27: There Are No As-Builts.

Q28: Building 8 Room 117 There Are 2 Pipes Going Through A Wall Of Which We Did Not Get To See The Other Side During The Job Walk. Connection Unknown. Provide Picture Of Other Side Of Wall.

A28: We Don’t Have Pictures.

Q29: Plan Page M-4 Does Not Show An Addition Of 10 Rooms; These Rooms All Have Ac Units That Need To Be Removed And Replaced. Please Clarify.

A29: Original Drawings Do Not Show Existing Vrf System That Was Installed Around 2000. No Drawings Exist. Refer To: Section 4.2 Of Solicitation.

Q30: In Building 6 There Is A Heating System That Is Disconnected -- Is This Part Of The Demo And Our Contract? This System Has Asbestos -- Fyi.

A30: System Is To Be Removed.

Q31: Will Both Building Be Occupied During Construction?

A31: During Demo And Installation Personnel Will Be Shifted As Much As Possible But Construction In Some Areas Will Have To Be Phased. This Will Be Limited As Much As Possible.

Q32: Will Temporary Cooling Or Heating Units Be Required During Construction?

A32: No

Q33: Provide As-Builts For Building 6 Existing Vrf System: Location Of Indoor Vrf Fan Coil Units. The As-Builts Provided Are For Building 8 Only.

A33: There Are No As-Builds For Bldg-6 Vrf System.

Q34: Confirm Contractor To Replace Like-For-Like Existing Vrf Fan Coil Units At Building 6?

A34: Contractor Will Install New Fan Coil Units With Fresh Air Makeup Capabiliities.

Q35: Building 8 Is The Contractor Required To Replace The Existing Kitchen Ventilation System: Exhaust Fans And Make Up Air Unit?

A35: Hood Fan Is Compliant. New Makeup Air Unit Is Required.

Q36: Building 8 Is The Contractor Required To Replace The Existing Exhaust Fans?

A36: Yes

Q37: Confirm 3rd Party Commissioning Agent Will Be Provided By The US Army?

A37: Contractor Is Responsible For 3rd Party Commissioning

Q38: Rfp States All Work Shall Be Completed Within 180 Days Upon Receipt Of Notice To Proceed. The Design Submittal Process Will Take 3-4 Months. Construction Duration Will Take 6-8 Months. We Request 365 Days To Complete This Project.

A38: Scope Will Be Revised To Provide 90 Days For Design And 180 Days For Construction.

Q39: We Request The Bid Date Extended (2) Weeks After The Rfi Responses Are Sent Back.

A39: Bid Due Date Has Been Revised.

Q40: The Current Rfp Calls For A Contract Duration Of 180 Days From Notice To Proceed (Ntp) But The Project Is Also A Design/Build By Rfp And By Requirement. Producing A Minimum Of Two Design Iterations Of Mechanical, Electrical, And Ddc Design And Allowing The Government A Minimum Design Review Period Of 15 Days For Each, Would Take Up Most Of The 180 Day Duration. Is The Government Going To Address The Inadequate Contract Duration Or Is The Government Not Concerned With Review And Oversight Of Any Design Documents?

A40: Scope Will Be Revised To Provide 90 Days For Design And 180 Days For Construction.

Q41: Can The Superintendent Also Be The Ssho?

A41: Yes If He Has The Required Osha Qualifications

Q42: What Are The Requirements For A Commissioning Agent?

A42: Contractor Is Responsible For 3rd Party Commissioning

Q43: What Are The Requirements For A Test & Balance Contractor?

A43: Final Phase Of Commissioning, Contractor Will Provide Third Part To Conduct Test & Balance And To Certify The HVAC System

Q44: What, If Any, Are The Requirements For The Design Consultants, I.E.; Mechanical Engineer, Electrical Engineer, Fire Protection Engineer?

A44: A Mechanical Engineer Is Preferred.

Q45: If We Are Designing And Installing A New Mechanical System, Will There Be A Review Of The Design By A Government Fire Protection Engineer?

A45: No. Submit Design To COR For Approval.

Q46: How Many Design Iterations Is The Government Going To Require? How Long Will The Government Require For Design Review Periods?

A46: Just One Design Iteration And It Will Take 10 Days To Review And Approve The Design.

Q47: Is This Formally Designated As A “Phased Project”? If So, Please Define The Desired Phasing.

A47: No. It Is Not Design As A Phase Project. But Should Consider Completing One Building Before Moving On To The Next Building. This Will Minimize The Impact On Units Daily Operations.

Q48: Are We To Include Replacing The Existing Exhaust Fans In The Building?

A48: Yes

Q49: The Sow Refers To Cassette Units Which Are Typically Exposed Supply And Return Units. Is This The Intended Design For Bldg. 8 Or Are Ducted Vrf Units Preferred?

A49: A Combination Of Cassettes And Ducted Vrfs May Be Used But Fresh Air Makeup Must Be Addressed In Design.

Q50: In Bldg. 8, Many Of The Offices Control The Return Air Through The Doors. Is This The Intended Design, Or Is The Desire To Have Supply And Return For Each Office?

A50: Supply And Return In Each Room.

Q51: Bldg. 8, How Many Zones Are Expected With This Design? Is The Design To Include Separate Thermostats (Zones) For Each Office Etc.?

A51: Expect Three Zone Of Building 8. Offices, Cubical Area And Hallways

Q52: There Is A Separate Adjacent Bldg. At The Corner Intersection Of Bldgs. 8 & 6, Access Was Not Possible. Are We To Assume Conditioning This Building Is Not Included In The Sow?

A52: Existing Heating / Cooling Loops To Oms Building Will Be Cut Back And Capped / Removed At Entry Point To Oms.

Q53: Bldg. 6, Which Is Conditioned By Ductless Mini Splits Also Has Some Window Shaker (Air Conditioners) In Some Other Areas, As We Are Instructed To Replace The Existing Vrf System, Are These Units, The Window Shakers, Included In The Sow?

A53: All Space Is To Be Conditioned By The New System. Thru The Wall Units Will Be Left In Place For Backup Use.

Q54: Due To Inaccessibility Of The Roof Of Bldg. 6 Please Provide The Model And Serial Number Of The Existing Mitsubishi Unit On The Roof. This Will Answer Many Other Questions Regarding Design Of Replacement Units.

A54: System Data Is Not Available But Unit And Piping Are Not Compatible For Use With R-410 Refrigerant. Piping Must Be Replaced.

Q55: Where Is The Desired Location Of The Existing Doas Unit?

A55: Mechanical Room Would Be Preferred.

Q56: The Corridors Of Both Buildings Are Not Conditioned, Is This The Intention Of The New Design, As Well?

A56: No. The Corridors Will Be Air Conditioned

Q57: Please Confirm That The Use Of Vrf Systems Is Acceptable, As Ufc 3-410-01 Section 3-5.16 Discourages Their Use On Army And Navy Facilities, And Prohibits Their Use In Air Force Facilities.

A57: This Solicitation Is For A Vrf System.

Q58: Will Envelope Upgrades Be Required To Achieve Minimum Insulation U-Factor In Accordance With Ashrae 189.1 Per Ufc 3-101-01 And Energy Requirements Of Ufc 1-200-02?

A58: Yes

Q59: Will The Project Be Required To Include Atfp Upgrades In Accordance With Ufc 4-010-01?

A59: No

Q60: Will Project Be Required To Meet Minimum 20% Energy Savings For Renovation Projects In Accordance With Epact 2005, Eisa And Ufc 1-200-02 As Compared To An Ashrae 90.1-2013 Baseline?

A60: Yes

Q61: Confirm HVAC Zoning Requirements For Each Building As The Building Appears To Include Large Open Areas And Smaller Private Office Areas. Will Temperature Control Zones In Each Building Be Limited By Square Footage, Solar Orientation, Use, Or Number Of Private Offices On A Zone?

A61: Yes

Q62: It Is Understood That Vrf Systems Utilize Proprietary Control Systems With Bacnet Gateways To Allow For Monitoring And Limited Control. The Rfp Notes That Non-Proprietary Ddc Controls Shall Be Used. Please Confirm It Is The Intent To Provide A Bacnet Gateway For Monitoring The Vrf Controls.

A62: Proprietary Controls Must Be Controllable Through An Open Source Controller Per Para 4.1.8.2.

Q63: Please Confirm The Minimum Required Ddc Points For Monitoring And Control.

A63: All Devices In System Must Be Addressed And Controllable Through The System Interface.

Q64: Will Atfp Pushbuttons Be Required To Shut Down HVAC Equipment And All Openings To The Outdoors?

A64: No

Q65: Will The Doas Be Required To Be Ducted To Each Individual Space With A Separate Duct System As Indicated In Ufc 3-410-01?

A65: No

Q66: Will Power And Controls Wiring Be Required To Be Concealed Or Is Surface Mounted Conduit Acceptable?

A66: Power And Control Wiring Will Be Concealed

Q67: The Scope Of Building 6 Indicates To Reuse Existing Refrigerant Piping. The Refrigerant Piping Arrangements And Sizing Between Vrf Manufacturers Is Not Common To All Manufacturers. The Reuse Of Existing Refrigerant Piping May Limit The Available Manufacturers Restricting Competitive Bidding. Please Confirm That Existing Refrigerant Piping Is To Be Demolished.

A67: Piping Will Be Demolished And Replaced.

Q68: Will Duct Air Leakage Testing Of New Ductwork Be Required?

A68: Yes It Will Be Required

Q69: Confirm Required Design Indoor Space Temperature And Humidity.

A69: Yes

Q70: Confirm Ashrae % Design Conditions For Outdoor Ambient Temperature And Humidity Under Winter And Summer.

A70: Yes

Q71: Will Hvac And Piping Insulation Be Required To Meet The Minimum R-Value In Accordance With The Latest Version Of Ashrae 90.1?

A71: Yes Piping Insulation Is Required

Q72: Will Leed Certification Be Required?

A72: No.

Q73: Confirm The Extent Of Hvac Demolition Within Building 8. Will The Exhaust Systems Within Building 8 Also Be Demolished And Replaced?

A73: Yes

Q74: Will There Be Hvac Work Within The Scullery And Food Prep Areas (Kitchen Exhaust Systems Or Make-Up Air Units)?

A74: Makeup Air Will Be Replaced. Range Hood Is To Remain As Is.

Q75: Manual “N” Load Calculations Are Generally For Light Commercial Structures Less Than 15 Tons. Based On The Existing As-Built Drawings, It Is Anticipated That The Load For This Building Will Significantly Exceed 15 Tons. Please Confirm A Computerized Load Calculation In Accordance With Ashrae Standard 183 As Specified In Ufc 3-410-01 Is Required.

A75: Yes A Computerized Load Calculation Is Acceptable.

Q76: Will The Doas Require The Ability To Heat, Cool, And Dehumidify As Stated In Ufc 3-410-01, And Will It Require The Use Of Energy Recovery?

A76: Yes, Ability To Heat, Cool, And Dehumidify. The Use Of Energy Recovery Is Not Required.

Q77: Will Different Areas Of The Building Have Different Occupancy Schedules? Would These Occupancy Schedules Require That Hvac Equipment Be Zoned To Allow Shutdown Of Equipment Serving Unoccupied Portions Of The Building?

A77: Occupied / Un-Occupied Scheduling Must Be Available For All Units Individually.

Q78: The As-Built Drawings Appeared To Indicate Battery Rooms. Will Hi/Low Explosion Proof And Corrosion Resistant Ductwork And Equipment Be Required For Any Portions Of The Building?

A78: No

Q79: Will The Project Be Required To Comply With The Requirements Of California Title 24 Energy Codes?

A79: The Contractor Shall Meet California Energy Codes Or Federal Which Ever Is The Most Stringent.

Q80: Is There Any Hazardous Storage On Site That May Affect The Design Hvac Equipment Serving The Space?

A80: No

Q81: Are Modifications To The Fire Sprinkler System Or Fire Alarm System Anticipated?

A81: No

Q82: The As-Built Drawings Indicate That There Are Comsec Areas. Will Crac Type Hvac Equipment With Humidity Control Be Required For Telecom Rooms?

A82: A Vrf Unit Will Be Located In Main Network/Telecom Room In Bldg-8. A Separate Mini Split Ac Unit Will Also Be Required. No Humidity Control Is Required.

Q83: Will The Ddc Controls Design Need To Comply With The Current Cybersecurity Ufc 4-010-06?

A83: Yes

Q84: Will The Project Need To Comply With The Requirements Of The Unified Facility Guide Specifications (Ufgs) Including Division 01 General Requirements?

A84: Yes, It Needs To Comply With UFC.

Q85: The Rfp Section 4.1.1 Indicates That No Equipment Or Materials Are To Be Abandoned; However, Later Section 4.1.7 States To Abandon Concealed Controls In Place. Please Clarify The Extent Of Demolition With Regard To Hvac Equipment And Appurtenances.

A85: Current Electrical / Pneumatic Controls That Are Mounted Inside Walls And Ceiling Areas May Be Abandoned If Not Easily Accessible.

The following have been modified:

SUPPLEMENTAL INFORMATION

Contract Specialist:

Jamie Gregar Phone: 608-388-1007 E-mail: jamie.j.gregar.civ@mail.mil

Contracting Officer:

Steve Bailey Phone: 608-388-6077 Email: steven.m.bailey2.civ@mail.mil

Include the following within the sealed bid package:

1) Completed SF1442 with acknowledgement of all amendments

2) Completed SF24

3) Any additional verification documents

4) CD-ROM (CD-R) disk with an electronic copy of all submission requirements listed above.

Contractor POC E-mail ____________________________________________

DUNS____________________________________________

TAXPAYER ID #__________________________

This solicitation is a 100% Service Disabled Veteran-Owned Small Business Set Aside under NAICS code 236220 with a size standard of $36.5 Million.

CONTRACTOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS CERTIFICATION:

a. In accordance with clause 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside, The Contractor, listed above, certifies that it ____ will ____ will not comply with the below requirement:

(i) General construction, at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other service-disabled veteran-owned small business concerns.

Bids can be submitted in any of the following ways:

Delivered to or by Mail:

Mission & Installation Contracting Command – Fort McCoy Attn: Jamie Gregar, Contract Specialist 1108 South R Street Fort McCoy, WI 54656-5153

A site visit is scheduled for April 20, 2017 at 10:00AM Local Time. Interested attendees are asked to meet at the El Montel Army Reserve Center in South El Monte, CA. The POC for the site visit is Stephen Berger at 562-795-1293 See Site Visit in Section 00100. This will be the only site visit conducted, requests for additional site visits will be denied.

For Site Visit information, see Site Visit clause 52.236-27, Alternate 1 in Section 00100. The conference will begin promptly without considerations for late or lost bidders; no subsequent site visits will be considered. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.

Any questions concerns, verification or clarification of information of the documents included in the solicitation package shall be submitted in writing and submitted to jamie.j.gregar.civ@mail.mil no later than Noon, local time on April 26, 2017. Include in the subject line of the email the Government’s solicitation number; failure to do so will lessen the Government’s ability to ensure all questions are considered during the bidding process. Provide your company name, POC and contact information in the body of the email.

The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222-26(b) (3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm

In accordance with FAR 22.404-10, the contractor must post a copy of the wage determination and Department of Labor Form WH-1321 in a prominent place where employees working on federal construction contracts can easily see it. The applicable wage determination is incorporated into the contract at Section H. The WH-1321 poster is located at http://www.dol.gov/compliance/guide/index.htm

Contractors are referred to EPA’s list of EPA-designated products available at http://www.epa.gov providing products that contain recovered materials.

In accordance with DPAP changes to reporting requirements under FAR 52.223-2, Affirmative Procurement of Bio-based Products under Service and Construction Contracts, contractors are now required to submit annual bio-based reports to the new reporting module in the System for Award Management (SAM). SAM can be accessed at https://www.sam.gov.

VETS-4212 Registration: You shall register on the VETS-4212 site to be considered for award. https://www.dol.gov/vets/vets4212.htm if you have a Government contract or subcontract in the amount of $150,000 or more that was entered into or modified on or after December 1, 2003.

SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already registered, please register in the CCR database at https://www.sam.gov/ www.sam.gov http://www.sam.gov https://www.sam.gov

a. A DUNS number is required for SAM registration. If your company does not have DUNS #, obtain one by calling 800-333-0505.

b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 236220 under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.

c. If the prospective awardee for this request for quotes is not registered in the SAM database by close of solicitation, including NAICS 236220 under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful registered offeror.

SAM REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at www.sam.gov in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2014) and 252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2014) in SAM to be eligible to receive an award for this solicitation.

PROJECT MAGNITUDE

The magnitude of this project is between $1,000,000 and 5,000,000.

EVALUATION FACTORS

The Government will evaluate bids received in response to this solicitation solely on the basis of price and price related factors. Bidders shall submit a price for each item specified in the “Schedule of Supplies/Services and Prices/Costs”. No bid for a quantity less than that specified in the Schedule will be accepted. Bids shall be evaluated using the estimated quantities set forth in the Schedule. All prices bid in response to this solicitation must include all costs associated with this project, applicable State sales taxes, permits, and licensure. And the overall project management, superintendence and quality control necessary for the planning and execution of multiple work requirements conducted simultaneously throughout the performance period.

BID GUARANTEE

A Bid Bond/Guarantee is required for this contract if it exceeds $150,000. The Bid Bond amount shall be twenty percent (20%) of the bid price or $3 Million, whichever is less.

Bidders must use the Standard Form (SF) 24 if providing a bid bond as the bid guarantee.

Attachments:

Attachment 1 – Scope of Work Attachment 2 – ATOPSEC Attachment 3 – Wage Determination Attachment 4 – SF24 Attachment 5 – As-builds 1 of 2 Attachment 6 – As-builds 2 of 2 Attachment 7 – Asbestos Report

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .