W911SA-17-B-0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 120 dys. ADC |
| 1 |
| W6KE BELL AFR CENTER |
MR. EDUARDO NISPEROS
5340 BANDINI BLVD
BELL CA 90201-6499
323-307-3487 FOB: Destination W62N8E
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 180 dys. ADC |
| 1 |
| W6KE BELL AFR CENTER |
MR. EDUARDO NISPEROS
5340 BANDINI BLVD
BELL CA 90201-6499
323-307-3487 FOB: Destination W62N8E
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
QUESTIONS & ANSWERS
Q1: In regards to the job walk performed on April 18, 2017, we would like to confirm there would be no requirement of any kind for Abatement or Testing for this project.
A1: No requirements.
Q2: In regards to the job walk performed on April 18, 2017, we would like ask a few questions in regards to the “Asphalt” work to be performed on this project. In regards to the “patch work” who will determine what will need to be patched? Is there a quantity not to exceed that can be added to the RFP?
A2: Any crack or hole wider than ¼”
Q3: The parking area located around bldg.321, Was all aligatoring” and that complete parking area should be replaced. Please advise.
A3: Work shall be done per SOW.
Q4: Will there be a need to “reconfigure the drainage in the area of building 321”. We do not see this in the SOW, but was brought up at site visit and told to put it in a RFI.
A4: No reconfiguring will be done.
Q5: Is there any “core” samples available?
A5: No
Q6: In front of the Armory Building it calls, to receive parking bumpers will this area also be resurfaced?
A6: Yes
Q7: Next to building 321 there was some vault doors in the parking area that were damaged will they need to be replaced.
A7: No
Q8: In regards to the job walk performed on April 18, 2017, we would like ask a few questions in regards to the demo/ repair of the bathroom plumbing. It appears to have some plastered walls, can the repaired areas that are demoed for plumbing repair, go back as drywall.
A8: All drywall being repaired in bathrooms must be green board.
Q9: In regards to the job walk performed on April 18, 2017, we are requesting “As-Build” drawings for the above-mentioned job. We would like them both in PDF as well as CAD.
A9: What we have will be provided with Amendment 1.
Q10: Can we get a quantity of windows on each building that will require being Re Glazed? At site visit, we did not get a chance to walk around buildings to get an accurate count.
A10: See 4.2.7
Q11: 33/ Site work. The asphalt around Bldg 321 is in a very poor state, especially the area identified on DWGS SITE PLAN as the MEP area, and needs to be replaced. The Type II Roadway Slurry Seal and sealing of the cracks per the RFP will cover the cracks for a short while but a guarantee cannot be provided, positive drainage cannot be provided. Cracks will reappear in a very short period of time. Please confirm that the repairs of the asphalt are limited to sealing of cracks and the Type II roadway slurry seal and that a guarantee will not be required.
A11: Work shall be done per SOW.
Q12: 35/ SOW 4.1.6.2 asks the contractor to remove all tile. Please confirm that this includes the floor tile.
A12: In order to evaluate plumbing floor tile might be effected. If this the case the floor tile will need to be removed.
Q13: SOW 4.1.8 asks the contractor to remove all exterior hardware. DWGS 4.6 Bldg 335 only shows new panic hardware on some of the exterior doors. Is the contractor to replace all of the exterior doors hardware or just the doors identified on DWGS 4.6 Bldg 335?
A13: Just doors identified on DWGS 4.6
Q14: SOW 4.6.1.2 asks the contractor inspect plumbing and fix any issues found upon inspection. Please confirm that this does not include any plumbing under the concrete slab.
A14: No plumbing under the concrete slab.
Q15: SOW 4.6.2 and 4.6.2.1 asks the contractor to retrofit the exterior doors with panic hardware as noted in DWGS 4.6 Bldg 335. This drawings has 19 doors color coded but the legend calls for 21. Please clarify discrepancy.
A15: No discrepancy colors showed where door locations are. There might be multiple devices on those doors. Per 1.4 states the contractor shall verify the site condition.
Q16: The DWGS 4.6 Bldg 335 shows doors from small offices with new panic hardware. Some of these doors probably do not require panic hardware as the max occupancy of those rooms will be below the threshold requiring panics. Also, on the first floor the drawing shows panic hardware on one door into an anteroom and not the second door into this anteroom (room number is illegible). Please confirm the scope and quantity of panic hardware required.
A16: See section 1.4 of the SOW.
Q17: Bldg 321 AMSA SOW 4.4.1.1 asks the contractor to replace all existing door closers. Please confirm that this is limited to the exterior doors only.
A17: Exterior doors only. As per 4.1.4
Q18: Bldg 331 Warehouse SOW 4.7.2, 4.7.2.1 and 4.7.2.2 asks the contractor to replace all door hardware, retrofit doors, replace all existing door closures, etc. DWGS 4.7 Bldg 331 Warehouse identifies just one door to have panic hardware and a closer. Please clarify which door(s) is/are to receive new hardware.
A18: See DWGS 4.7
Q19: SOW 4.7.4 asks the contractor to install 1/8” diamond plate over the existing wall. How high is the diamond plate to extend? (Doors are at 7’).
A19: 4’ should be sufficient.
Q20: Bldg 005 OMS: SOW paragraph 4.1.3.5 asks the contractor to remove panel board from back wall of room 2. Please clarify what panel board is to be removed. (Electrical? Other?) If it is electrical what is to be done with the existing circuits and etc.?
A20: Panel board is the paneling on the wall of the room.
Q21: SOW paragraphs 4.3.1.1 & 4.3.1.2 asks the contractor to prep, repair and paint all surfaces. Does this include walls, ceilings, doors and the roll up doors in rooms 10 through 14?
A21: 4.3.1.2 All interior walls and hard ceiling shall be painted with single color. Also Paint calculation worksheet for building 005 shows sf and location.
Q22: SOW 4.3.1.4 asks the contractor to paint all stairwell handrails. Based on our inspection of the building and the plans there does not appear to be any stairs. Please clarify.
A22: There are no handrails at this location omit this line item.
Q23: SOW 4.3.2.2 asks the contractor to install VCT in areas shown on drawings. The drawings do not appear to show areas of VCT. Please clarify.
A23: Rooms 1, 2, 8, 9 and Hall 2.
Q24: SOW 4.3.2.3 asks the contractor to test the moisture content of the slab. If the moisture content is higher than that recommended by the VCT manufacturer will the installation of a moisture barrier be considered a modification to the contract?
A24: No
Q25: 24/ Paragraph 4.8.1 and 4.8.1.1 asks the contractor to identify all areas of damaged asphalt that is to be repaired by spray painting the outside corners of the work area, this area will then be removed and replaced with new base and asphalt.
This approach in asking a contractor to submit a bid for an undefined scope of work to repair the damaged asphalt is very subjective and may lead to issues during execution of this scope of work. The Governments interpretation of damaged asphalt may be very different to each and every contractor that submits a bid for this scope of work.
In order to be fair and make the scope of work definable such that a fair and equal bid can be prepared by each contractor, please provide a square foot of asphalt that is to be replaced for the basis of the bid.
A25: Please see 1.4. Information should have been captured during site visit.
Q26: Bldg 004: SOW Paragraph calls for two new windows. Are these windows to be ATFP compliant? If they are please provide the stand-off distance?
A26: Windows shall be replaced with like kind.
Q27: Bldg 004: If the windows are to be ATFP compliant can the contractor assume that the walls are structurally sound and capable of supporting the new ATFP compliant windows without additional reinforcing?
A27: Windows shall be replaced with like kind.
Q28: Bldg 004: DWGS 4.2.8 Bldg 004 CONT, second floor provides quantities of the panic hardware, single door lever, door closure and Kaba locksets. The quantities given and a count of the highlighted doors differ. Is the contractor to base their proposal on the given quantities or base it on the first and second floor plans with the openings highlighted per the legend?
A28: Base it on the higher number.
Q29: Bldg 004: SOW paragraph numbering seems to follow a certain pattern, please confirm that all paragraphs numbered 4.2.1…. are associated with rooms 232 & 237; paragraphs 4.2.2… & 4.2.3…are associated with rooms 128, 129, 232, 234, 235 & 237; paragraphs 4.2.4… are associated with rooms 230 & 231; paragraphs 4.2.5… are associated with room 116. Paragraph 4.2.5.5 seems to be an anomaly. Please confirm that this applies to the other building SOW’s also.
A29: 4.2.1.1- 4.2.1. 4 refers to 232 and 237 and only those rooms; 4.2.2 refers to rooms 232, 237, 128 and 129. 4.2.2.2 – 4.2.2.4 Refers to 232 and 237; 4.2.3 – 4.2.3.1 refers to new room that will be separated from 227 with a wall. 4.2.4 - 4.2.4.2 Refers to rooms 230 and 231. 4.2.5 – 4.2.5.5 Refers to room 116. 4.2.5.5 Is a kitchen off of room 116 this is not an anomaly.
Q30: Bldg 004: SOW 4.1.2 asks the contractor to remove all window blinds, is this referring to blinds throughout the building 004? Are new required?
A30: New vertical, 3" to 5" PVC blinds shall be installed.
Q31: Bldg 004: SOW 4.1.2.2 asks the contractor to remove counters and sinks but the RFP does not appear to ask for new. There does not appear to be any counters within the restrooms, are new counters required? Are new sinks and faucets required?
A31: Please omit 4.1.2.2, 4.1.2.2, 4.1.2.3 and 4.1.2.3.1 from consideration.
Q32: Bldg 004: If new counters are required are they to be solid surface material? If counters are required it will be necessary to install backing, which will require new tile for patching that, probably, will not match existing.
A32: Please omit 4.1.2.2 from consideration. Current sinks and faucets will remain in place.
Q33: Bldg 004: SOW 4.1.2.3 asks the contractor to remove partitions, are these the toilet partitions? The SOW does not appear to ask the contractor to install new partitions, are new toilet partitions to be installed?
A33: Please omit 4.1.2.2 from consideration. Current sinks and faucets will remain in place.
Q34: Bldg 004: SOW 4.1.2.3.1 asks the contractor to remove all fixtures, please clarify which fixtures. (Plumbing fixtures? Toilet accessories? Others?). Article 4.2.2.1 calls for new toilet seats so it can be assumed that it is not the water closets.
A34: Please omit 4.1.2.2 from consideration. Current sinks and faucets will remain in place.
Q35: Bldg 004: SOW 4.1.2.5 asks the contractor to remove all expansion joint material in rooms 116, 232 and 237, is the Government referring to caulking of joints within the concrete slab and is this to be replaced? See question 19, below.
A35: See 4.2.5.3
Q36: Bldg 004: SOW 4.2.1.2 ask the contractor to paint every room within the USARC, the painting calculations worksheet only identifies 5 rooms in B-004. Please confirm which rooms are to be painted. If all rooms are to be painted as-built drawings will be required to obtain an accurate quantity take off.
A36: 4.2.1.2 Refers to only new room that will be constructed when wall in 237 goes up.
Q37: Bldg 004: SOW 4.2.2.4 calls for 12 new benches. Please identify the length of the benches.
A37: 6’ benches
Q38: Bldg 004: SOW 4.2.5.3 asks the contractor to install expansion joint, pre-molded, bituminous fiber for concrete floors. This type of expansion joint is for use with new slabs and is installed prior to slabs being poured. Will caulking of joints be acceptable?
A38: Elastomeric Caulking can be replaced for the pre-molded bituminous fiber.
Q39: Bldg 004: SOW 4.2.8.1 asks the contractor to remove old fixtures noted in DWGS 4.2 and to repair/replace with new equipment. Drawings 4.2 do not appear to identify any old fixtures to be removed with the exception of door hardware. Please clarify which old fixtures are to be replaced.
A39: Please omit 4.1.2.2, 4.1.2.2, 4.1.2.3 and 4.1.2.3.1 from consideration.
Q40: Can the site superintendent also perform the duties of the SSHO?
A40: If they hold the proper training and certificates to hold both duties.
Q41: Can the site superintendent also perform the duties of the CQCM?
A41: If they hold the proper training and certificates to hold both duties.
Q42: Can SSHO also perform the duties of the CQCM?
A42: If they hold the proper training and certificates to hold both duties.
Q43: Will the buildings be occupied during the renovation/repair?
A43: All buildings except for the OMS building.
Q44: Will the project have to be completed in phases?
A44: Personnel will be on site but work can be done around them without having to phase the project.
Q45: Can the work be completed in all buildings concurrently?
A45: Yes
Q46: Will temporary bathrooms be required?
A46: No
Q47: The scope of work, Article 4. SITE WORK states that the contractor is to “taking out obsolete….” Please identify what obsolete items are to be taken out.
A47: 1.4 The Contractor shall visit the work site to verify the site condition. During the site walk the equipment was shown, the equipment is also attached to the SOW under reference pictures.
Q48: Please provide drawings for buildings 334 and 331 that are legible. The room numbers cannot be determined.
A48: What we have will be provided with Amendment 1.
Q49: If the work is to be done concurrently 120 days to issue subcontracts, obtain and process submittals, order the approved products, wait for delivery and then install the products is insufficient time. Can the duration be extended to 180 days? If the work is to be done in phases the duration will be dependent upon the required phasing and additional time will be required for the phasing.
A49: It can be extended to 180 days.
Q50: Can you please provide hazardous material reports for all of the buildings?
A50: Will be provided with Amendment 1.
Q51: Can you please provide better as-built drawings of the buildings?
A51: What we have will be provided with Amendment 1.
Q52: Can I get blue prints for the project with dimensions and details on them?
A52: What we have will be provided with Amendment 1.
Q53: Can I get as-builds for the existing buildings?
A53: What we have will be provided with Amendment 1.
Q54: Does the contractor need to remove the workout equipment in room 108 of the Warehouse Bldg. 331? The specs refer to this room as 107 but it was marked 108 at the job walk. Please clarify.
A54: If it is marked at 108 on site then it is 108. Yes the contractors shall remove the equipment and replace after floor is installed.
Q55: Will installing resilient athletic flooring VCT over the existing flooring at room 108 of the Warehouse Bldg. 331 cause an issue with the threshold at the doorway. It seems as though the existing floor should be removed first.
A55: Install over the VCT and use a stepdown threshold.
Q56: General Pre-Award 1.20 states that National Environmental Policy Act documents must be completed prior to award of the contract or notice to proceed. Will there be a more definite date for when we can expect to see these documents so we can budget for potential lead or asbestos abatement on this project?
A56: The portion of the SOW is actually 1.19 it refers to if there is asbestos in the facility. We do not anticipate there being any. Proper documents from our environmental section have been completed.
Q57: Item 4.2.7 says replace 2 broken windows. It was mentioned at the walk they have already been replaced. Is this true?
A57: One window has been repaired. There is still another window that shall be repaired under this SOW.
Q58: Item 4.3.1.10 says contractor shall install all new interior vertical 3” PVC blinds. Can we get a count of how many windows and plans that show the dimensions of the windows? I realize that each window will have to be measured by the contractor after the award but knowing the count and dimensions would be helpful.
A58: What plans we have will be provided with Amendment 1.
Q59: In building 4 where we need to sanitize the floor and wall tiles (4.2.2.2) and sanitize walls, floors and equipment and acid wash all grout with environmentally green products (4.2.5.5), do we need to repair any damaged tiles or missing grout? Do we only need to report any damaged tile, grout or equipment? Would a tile surface refinish be a better way to go? This would change outdated colors, repair chipped and cracked tiles, and repair moldy and damaged tile grout lines. Please specify.
A59: Complete as stated in SOW and report any damage to COR.
Q60: May I request all the as-build drawings for building 001, 004, 005, 321, 331, 334 and any building related to this project?
A60: What plans we have will be provided with Amendment 1.
Q61: For building 004 does the roof have manufacturer warranty if so can I get the contractor information who has installed it?
A61: There is no work being done on the roof for building 004.
Q62: For building 004 in room 116 is the concrete floor to be stained in color (4.2.5.4) or only clear epoxy (5.2.5.5)?
A62: In color with a clear epoxy over the color.
Q63: For building 005 before installing the new HVAC does the ductwork need to be cleaned before installing?
A63: Yes
Q64: For building 005 under 4.3.4 the door to be installed was requested by the COR to install with a window to view in the other room, if so please provide the dimensions of the window opening with the location on the door.
A64: Door is still in the same location. Lite in door shall be a standard size for the door being placed. COR will approve door Specs after award.
Q65: ASPHALT PARKING REPAIR: Please clarify, are we to assume a 12” thickness of asphalt and base course, with 2” asphalt surface?
A65: Yes
Q66: ASPHALT PARKING REPAIR: During the site visit it was noticed that the existing paving has several areas of alligatoring and large cracks. There was a lot of vehicles and `equipment covering much of the parking areas so it is not possible to determine the extent of any damaged or deteriorating areas with reasonable accuracy. Would the Government please clarify what the criteria is for determine asphalt removal and replacement? Also since much of the parking lot is covered would the Government please provide estimated quantities for the areas that are to be removed and replaced?
A66: Per 1.4 states the contractor shall verify the site condition. One can look under the vehicles to verify site condition.
Q67: ASPHALT PARKING REPAIR: It is our understanding that the Government will move equipment out of the way for pavement repair. How much area will be available for each operation?
A67: The area available is shown on site drawings.
Q68: ASPHALT PARKING REPAIR: Can you please clarify how many parking bumpers/wheel stops are required to be replaced? It looks like only those around Building 4? Is there an as-built on the parking lot striping so we can determine the extent of the striping?
A68: No as-built and the parking lot bumpers are only at building 4. 1.4 The Contractor shall visit the work site to verify the site condition
Q69: STRUCURAL STEEL: Is the exposed structural steel in the areas we are to perform work in Building 4 to be repainted?
A69: No
Q70: LIGHTING FIXTURES: It was noticed in the site walk that many of the light fixtures have lenses that are dirty but not broken. Is it the intent to clean or replace these?
A70: Yes
Q71: EXHAUST FANS: On Building 4 there are several exhaust fans and 4 are called out to be replaced. It looks as if 1 of the 4 has recently been replaced. Will the Government please clarify which fans should be replaced?
A71: Fans that are currently not working.
Q72: FLOORING: In Building 334 Restrooms, please clarify if all wall and floor tile is to be removed and replaced or only wall tile on the wet walls? If the floor is to be replaced, can the Government verify if there is a setting bed and thickness or is the tile installed in thin set?
A72: All tile and it is unknown what the base is under the tile.
Q73: PAINTING: Is it the intent to repaint all interior walls and hard lid ceilings in all the affected buildings or only specific rooms per the Painting Calculations Worksheets? Do the overhead doors repaint? Do all doors and frames repaint? Please clarify.
A73: Only in the specific rooms per the Painting Calculations Worksheets.
Q74: ATHLETIC FLOORING: In Building 331 the scope says to install athletic flooring in Room 107. Room 108 currently has athletic flooring. Please clarify if we are too install athletic flooring in Room 108 and if so where Room 108 is located.
A74: No new athletic flooring will be placed. 4.7.5 of the SOW shall be omitted.
(End of Summary of Changes) image1.wmf