0010670193-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the w age determination and extend the bid due date from Thursday, April 28, 2016 at 2:30pm CST to Tuesday, May 3, 2016 at 2:30pm CST.
POC: Melissa T. Gore 608.388.1251 melissa.t.gore.civ@mail.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 28
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SA-16-B-0005
X 9B. DATED (SEE ITEM 11)
22-Mar-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Apr-2016
CODE
MICC FORT MCCOY
BLDG 1108 SOUTH R ST
FORT MCCOY WI 54656-5153
W911SA 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SA-16-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 28-Apr-2016 02:30 PM to 03-May-2016 02:30 PM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
SUPPLEMENTAL INFORMATION
Contract Specialist:
Melissa Gore Phone: 608-388-1251 E-mail: melissa.t.gore.civ@mail.mil
Contracting Officer: Steven Bailey Phone: 608-388-6077 Email: steven.m.bailey2.civ@mail.mil
Include the following within the sealed bid package:
1) Completed SF1442 with acknowledgement of all amendments
2) Completed Attachment 4, SF24
3) Any additional verification documents
4) CD-ROM (CD-R) disk with an electronic copy of all submission requirements listed above.
Contractor POC E-mail ____________________________________________
DUNS____________________________________________
TAXPAYER ID #__________________________
CLIN 0001 will be awarded and CLIN 0002 may or may not be awarded based on funding.
This solicitation is a Servic-disabled Veteran-owned (SDVOSB) Small Business Set Aside under NAICS code 238210 with a size standard of $15 Million.
This requirement has a period of performance of June 1, 2016-April 30, 2017. Work may not begin on the range until mid September 2016. There are 7 days during the week between September 12, 2016-November 30, 2016 that the range will be in use. It is the Contractor's responsiblity to have electricity supplied to all targets early on the day prior to the scheduled training.
Bids can be submitted in any of the following ways:
Delivered to or by Mail:
Mission & Installation Contracting Command – Fort McCoy Attn: Melissa Gore, Contract Specialist 1108 South R Street Fort McCoy, WI 54656-5153
A site visit is scheduled for March 30, 2016 10:00 AM Local time. Interested attendees are asked to meet in the
Contracting Office located in Bldg. 1108. South R Street, Fort McCoy, Wisconsin. The POC for the project is Melissa Gore at (608) 388-1251. See Site Visit in Section 00100. This will be the only site visit conducted, requests for additional site visits will be denied.
For Site Visit information, see Site Visit clause 52.236-27, Alternate 1 in Section 00100. Unless you already have a permanent vehicle pass, you will be required to obtain a one-day vehicle pass. You will be required to present the following information at the Visitor’s Center: (1) vehicle registration, (2) valid driver’s license, (3) or car rental agreement (if applicable). It is highly recommended that bidders plan to arrive at the Visitor’s Center at least an hour prior to the scheduled time for the site visit. The conference will begin promptly without considerations for late or lost bidders; no subsequent site visits will be considered. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.
Any questions concerns, verification or clarification of information of the documents included in the solicitation package shall be submitted in writing and submitted to the Government POC’s identified herein no later than Noon, local time on April 6, 2016. Include in the subject line of the email the Government’s solicitation number; failure to do so will lessen the Government’s ability to ensure all questions are considered during the bidding process. Provide your company name, POC and contact information in the body of the email.
The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222-26(b) (3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm
In accordance with FAR 22.404-10, the contractor must post a copy of the wage determination and Department of Labor Form WH-1321 in a prominent place where employees working on federal construction contracts can easily see it. The applicable wage determination is incorporated into the contract at Section H. The WH-1321 poster is located at http://www.dol.gov/compliance/guide/index.htm
Contractors are referred to EPA’s list of EPA-designated products available at http://www.epa.gov providing products that contain recovered materials.
In accordance with DPAP changes to reporting requirements under FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, contractors are now required to submit annual bio-based reports to the new reporting module in the System for Award Management (SAM). SAM can be accessed at https://www.sam.gov.
SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already registered, please register in the CCR database at https://www.sam.gov/ www.sam.gov http://www.sam.gov https://www.sam.gov
a. A DUNS number is required for SAM registration. If your company does not have DUNS #, obtain one by calling 800-333-0505.
b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 238210 under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.
c. If the prospective awardee for this request for quotes is not registered in the SAM database by close of solicitation, including NAICS 238210 under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful registered offeror.
SAM REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at www.sam.gov in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit 52.204-8 ANNUAL REPRESENTATIONS AND
CERTIFICATIONS (JAN 2014) and 252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2014) in SAM to be eligible to receive an award for this solicitation.
PROJECT MAGNITUDE
The magnitude of this project is between $500,000 and $1,000,000.
EVALUATION FACTORS
The Government will evaluate bids received in response to this solicitation solely on the basis of price and price related factors. Bidders shall submit a price for each item specified in the “Schedule of Supplies/Services and Prices/Costs”. No bid for a quantity less than that specified in the Schedule will be accepted. Bids shall be evaluated using the estimated quantities set forth in the Schedule. All prices bid in response to this solicitation must include all costs associated with work elements, applicable State sales taxes, permits, and licensure. And the overall project management, superintendence and quality control necessary for the planning and execution of multiple work requirements conducted simultaneously throughout the performance period.
BID GUARANTEE
A Bid Bond/Guarantee is required for this contract if it exceeds $150,000. The Bid Bond amount shall be twenty percent (20%) of the bid price or $3 Million, whichever is less.
Bidders must use the Standard Form (SF) 24 if providing a bid bond as the bid guarantee.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SPECIAL CONTRACT REQUIREMENTS
HOURS OF OPERATION
a. Contractor shall schedule working hours to coincide with the working hours of the military reservation.
The normal working hours are 7:00 a.m. to 4:30 p.m. Monday through Friday excluding Federal Holidays.
Federal Holidays are as follows:
January 1st 1st Monday of September 3rd Monday of January 2nd Monday of October 3rd Monday of February November 11th Last Monday of May 4th Thursday of November July 4th December 25th
When a Federal holiday falls on a Sunday, the following Monday will be considered the official observed holiday;
likewise, when a Federal holiday falls on a Saturday, the preceding Friday will be considered the official observed holiday. At no time will contractor personnel be excused from performing contracted work as a result of other Congressional or Presidential imposed excused absence of Department of Army civilians or uniformed military personnel.
b. Any and all work requested by the contractor outside the normal working hours identified above shall be approved no later than three business days in advance and in writing by the Contracting Officer. Work outside the normal workday will not be granted for the express convenience of the contractor to repair a failing performance schedule. Re-scheduling of work prevented by weather conditions or other circumstances beyond the contractor’s control should be made through a written request for extension of the task order contract period under the authority of 52.236-2, Differing Site Conditions, or 52.249-10, Termination for Default (Fixed-Price Construction).
LEGAL COMPLIANCE
The Contractor shall comply with all Federal, State, and Local laws, codes, and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.
RAPID GATE
Fort McCoy is offering an Installation Access Control Solution called the RAPIDGate Program. This program is available, with installation approval, to new and existing vendors, contractors, sub-contractors and service providers who require routine access to Fort McCoy and desire streamlined entry into the Installation. This program is available at a registration cost to the company, with an additional fee per employee.
Through two integrated processes - Access Privilege Management and Enrollment/Registration - the RAPIDGate Program enables electronic verification of identity and access privileges at Fort McCoy's access control points (ACPs).
Companies choosing to participate in the RAPIDGate Program will have streamlined access onto the installation.
Participants will have access through all gates that size permits (Main Gate and Gate 20) and will be subject to RANDOM vehicle inspections. At the Main Gate RAPIDGate participants will be able to use either lane, enabling fast access onto the installation through that gate.
Non-RAPIDGate participants and companies that choose not to participate in the RAPIDGate Program will be required to access the installation through Gate 20, whereby a Temporary day pass will be issued for each person. Contracts with a duration of 30 days or less will be required to apply for a pass under an exception to policy. The maximum pass period AS an exception to policy is 30 days with approval by the DES Physical Security Branch. To apply for a 30 day pass, the company is required to provide Physical Security a copy of the contract award, along with identification.
Companies that service Fort McCoy may enroll in the RAPIDGate Program by calling 1-877-RAPIDGate (1877- 727-4342). The Program will confirm with the installation Physical Security Branch that the company has legitimate business on the installation. Once the company has enrolled, its employees can register at the self- service KIOSK Registration Stations located at the Fort McCoy Visitor Control Center (VCC) in building 35.
The RAPIDGate Program confirms the individual's employment status with the company, and then performs identity authentication and background screening. Employees who qualify are issued a personalized RAPIDGate ID Credential Badge. The Program performs background screening on a regular basis to verify continued eligibility in the Program.
Questions about the Fort McCoy RAPIDGate Program should be addressed to info@rapidgate.com with the subject line RE: RAPIDGate Program, or to the Physical Security Branch, Directorate of Emergency Services at 608-388-3794 or mark.a.reaves.civ@mail.mil.
CONTRACT PROGRESS REPORTING
a. The Contract Progress Schedule, will be used to satisfy the submission requirements of FAR 52.236-15, “Schedules for Construction Contracts”. The Contractor shall, within ten (10) days after contact award, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment).
b. Work elements entered in column B of the progress schedule should be limited to those tasks which will indicate the progress of the work under the contract and which can be identified and measured by personnel monitoring the Contractor’s progress.
c. Appropriate revisions will be made to the existing approved progress schedule whenever an approved change to the performance period is authorized by a contract modification. No adjustments or extensions in the performance period will be authorized without a duly executed contract modification.
d. A “Contract Progress Report”, shall be initiated weekly and delivered to the Contracting Officer and the COR simultaneously. Progress reports shall include both the percentage of work completed within the rated period and a cumulative total of work completed under the contract/task order to date. Progress reports shall be issued weekly; submitted progress reports will be reviewed by the Contracting Officer (or designated representative) and returned for correction as necessary.
ENG FORM 4025-R
ENG Form 4025-R, Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer’s Certifications, shall be used in satisfying the material approval requirements of FAR 52.236-5.
All material submittals shall be delivered to the Contracting Officer (or authorized representative) in electronic format (as much as is practicable). Only those submittal documents and samples not capable of being transported electronically are to be submitted in hard copy. Hard copy submittals shall be delivered to a designated location at the main entrance desk in Building 2171. Electronic submissions shall be sent to: Administrative POC and usarmy.mccoy.imcom-northeast.mail.dpw-inspections@mail.mil
Questions on the status of submittals shall be directed to the Contracting Officer (or authorized representative) via e-mail. Questions sent to usarmy.mccoy.imcom-northeast.mail.dpw-inspections@mail.mil will not be answered.
Project schedules shall be submitted the same as all other submittals and shall be accompanied by a transmittal sheet.
The contract specialist (CS) will return the signed schedule and transmittal to the contractors and copy the COR.
Submittal/transmittal sheets with any incorrect or missing information will be rejected immediately without review.
Rejection of incorrectly completed transmittals shall not be a basis for consideration for a contract extension.
FINAL INSPECTION
a. When the Contractor considers the work complete, they shall request a final inspection 7 days prior to the desired date. Final inspection shall be performed with the Contractor, Government personnel and representatives of the using activity.
b. During the final inspection, any discrepancies identified by the Government team will be documented in the Government’s punch list and provided to the Contractor for correction and re-inspection within 10 days from the date of the joint inspection.
c. Final acceptance of the work occurs upon the Contracting Officer’s acceptance of the work subsequent to successful final inspection by the COR and receipt of all contract requirements. Final acceptance must occur prior to the established contract completion date or liquidated damages may be assessed for late performance.
REQUIRED INSURANCE
In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.
Workmen’s Compensation As required by state laws
Employer’s Liability Insurance $100,000
General Liability Insurance $500,000 per occurrence Bodily Injury Liability
Auto Liability Insurance $200,000 per person
Bodily Injury $500,000 per occurrence
Property Damage $20,000 per occurrence
CONSENT OF SURETY
In accordance with FAR 28.106-5, consent of surety will be required if
a. An additional bond is required to support a modification to the contract, and the bond obtained is from a surety different than the original surety;
b. The contract is modified, without any additional bond being required, and the modification changes the contract price (upward or downward) by more than 25% or $50,000; or
c. A novation agreement is requested by the Contractor.
BONA FIDE NEED
Defense Financial Management Regulation (Vol. 3, Ch. 8, para. 080303.C) requires that work obligated by funds in the current fiscal year commence prior to1 January of the following calendar year if obligation occurred near the end of the fiscal year. Commencement can be physical on-site work or documented evidence that costs have been incurred or materials have been ordered. It is anticipated that the notice to proceed or task order will be issued in sufficient time to comply with this regulation. However, the Contractor shall not commence work until after the date of receipt of the notice to proceed or task order.
WAGE DETERMINATION
General Decision Number: WI160011 04/01/2016 WI11
Superseded General Decision Number: WI20150011
State: Wisconsin
Construction Type: Building
Counties: Adams, Ashland, Barron, Bayfield, Buffalo, Burnett, Clark, Columbia, Crawford, Dodge, Door, Dunn, Florence, Fond Du Lac, Forest, Grant, Green, Green Lake, Iowa, Iron, Jackson, Jefferson, Juneau, Kewaunee, Lafayette, Langlade, Lincoln, Manitowoc, Marinette, Marquette, Menominee, Monroe, Oconto, Oneida, Pepin, Polk, Portage, Price, Richland, Rusk, Sauk, Sawyer, Shawano, Taylor, Trempealeau, Vernon, Vilas, Walworth, Washburn, Waupaca, Waushara and Wood Counties in Wisconsin.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/29/2016 2 03/04/2016 3 03/11/2016 4 04/01/2016
* ASBE0019-002 11/30/2015
COLUMBIA, CRAWFORD, DODGE, GRANT, GREEN, IOWA, JEFFERSON,
JUNEAU, LAFAYETTE, MARQUETTE, MONROE, RICHLAND, SAULK, VERNON,
AND WALWORTH COUNTIES
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 33.83 28.25
ASBE0034-005 06/01/2015
BARRON, BUFFALO, DUNN, AND POLK COUNTIES
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials;
protective coatings, coverings, and finishes to all types of mechanical systems. Does not include asbestos removal)................$ 34.37 28.68
ASBE0049-003 06/01/2015
ASHLAND, BAYFIELD, BURNETT, IRON, PEPIN, SAWYER, AND WASHBURN
COUNTIES
Asbestos Workers/Insulator (Includes the application of all insulating materials;
protective coverings, coatings, and finishes to all types of mechanical systems).....$ 27.82 24.15
ASBE0127-002 06/01/2015
ADAMS, CLARK, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE,
JACKSON, KEWAUNEE, LINCOLN, MANITOWOC, MARINETTE, MENOMINEE,
OCONTO, ONEIDA, PORTAGE, PRICE, RUSK, SHAWANO, TAYLOR,
TREMMPEALEAU, VILAS, WAUPACA, WAUSHARA, AND WOOD COUNTIES
Heat and Frost Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems;
and the application of firestopping material in walls, floors, ceilings).........$ 30.34 21.13
ASBE0205-005 06/01/1998
ADAMS, CLARK, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE,
JACKSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARINETTE,
MENOMINEE, OCONTO, ONEIDA, PORTAGE, PRICE, RUSK, SHAWANO,
TAYLOR, TREMPEALEAU, VILAS, WAUPACA, WAUSHARA, AND WOOD COUNTIES
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not).................$ 16.56 3.10
ASBE0205-008 06/01/1999
COLUMBIA, CRAWFORD, DODGE, GRANT, GREEN, IOWA, JEFFERSON,
JUNEAU, LAFAYETTE, MARQUETTE, MONROE, RICHLAND, SAULK, VERNON,
AND WALWORTH COUNTIES
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)...$ 16.55 3.45
ASBE0205-012 05/01/1998
ASHLAND, BAYFIELD, BURNETT, IRON, PEPIN, SAWYER, AND WASHBURN
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)...$ 19.72 3.69
ASBE0205-013 05/01/1998
BARRON, BUFFALO, AND POLK COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)...$ 19.72 3.69
BOIL0107-001 01/01/2015
BOILERMAKER
Boilermaker.................$ 33.35 28.60 Small Boiler Repair (under 25,000 lbs/hr)..............$ 26.91 16.00
BRWI0001-003 06/01/2015
CRAWFORD,JUNEAU, MONROE,TREMPEALEAU, AND VERNON COUNTIES
Rates Fringes
Bricklayer & Tile Setter.........$ 31.22 16.69
BRWI0002-003 06/01/2015
ASHLAND, BURNETT, IRON, WASHBURN
Rates Fringes
BRICKLAYER
Bricklayer, Tile Setter.....$ 36.10 16.13 Cement Mason/Concrete Finisher....................$ 34.30 16.13
BRWI0002-004 06/01/2015
BAYFIELD COUNTY
Rates Fringes
BRICKLAYER
Bricklayer & Tile Setter....$ 36.10 16.13
BRWI0003-001 06/01/2015
DOOR, KEWAUNEE, FLORENCE, FOND DU LAC, GREEN LAKE, MANITOWOC,
MARINETTE, MARQUETTE, OCONTO, SHAWANO, WAUPACA, AND WAUSHARA
BRICKLAYER
Bricklayer, Cement Mason, Tile Setter.................$ 31.59 16.39
BRWI0004-003 06/01/2013
WALWORTH COUNTY
Rates Fringes
BRICKLAYER.......................$ 35.11 18.58
CEMENT MASON/CONCRETE FINISHER...$ 32.36 18.58
TILE SETTER......................$ 28.21 18.58
BRWI0006-001 06/01/2013
ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MENOMINEE, ONEIDA,
PORTAGE, TAYLOR, VILAS AND WOOD COUNTIES
Bricklayer,Cement Mason,Tile Setter...........$ 32.14 16.56
BRWI0006-004 06/01/2013
PRICE COUNTY
Rates Fringes
Bricklayer & Tile Setter.........$ 32.14 16.56
BRWI0007-003 06/01/2015
GREEN AND LAFAYETTE COUNTIES
Rates Fringes
Bricklayer & Tile Setter.........$ 32.90 17.01
BRWI0013-003 06/01/2015
GRANT, IOWA, AND RICHLAND COUNTIES
Rates Fringes
Bricklayer......................$ 32.86 17.22 Tile Layer.......................$ 29.71 16.20
BRWI0019-004 06/01/2015
BARRON, BURNETT (Southern half), DUNN, PEPIN, POLK, RUSK, AND WASHBURN (Southern half) COUNTIES
Bricklayer, Cement Mason, Tile Layer..................$ 31.36 16.51
BRWI0019-005 06/01/2015
SAWYER COUNTY
Rates Fringes
Bricklayer & Tile Setter.........$ 31.36 16.51
BRWI0021-001 06/01/2015
DODGE AND JEFFERSON COUNTIES
Rates Fringes
BRICKLAYER
Bricklayer, Cement Mason, Tile Layer..................$ 33.58 16.65
BRWI0034-001 06/01/2015
COLUMBIA AND SAUK COUNTIES
Rates Fringes
BRICKLAYER
Bricklayer, Cement Mason, Tile Layer..................$ 32.86 17.22
CARP0087-003 05/01/2009
BURNETT (West of highway 48) AND POLK(West of Highways 35, 48 &
65) COUNTIES
CARPENTER (Including Drywall Hanging, Acoustical work)........$ 31.79 16.10
CARP0252-005 07/02/2012
ADAMS, BARRON, BAYFIELD (Eastern 2/3), BUFALO, BURNETT (East of Hwy 48), CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, FLORENCE (Except area bordering Michigan), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, KEWAUNEE, LAFAYETTE, MANITOWOC, MARINETTE (Except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, POLK (East of Hwy
35, 48, 65), PORTAGE, PRICE, RICHLAND, RUSK, SAUK, SAWYER,
SHAWANO, TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH,
WASHBURN, WAUPACA, WAUSHARA, AND WOOD COUNTIES
CARPENTER (Including Drywall Hanging, Acoustical work)........$ 30.48 15.80
MILLWRIGHT.......................$ 32.11 15.80
CARP0252-009 07/02/2012
ASHLAND COUNTY
CABINET INSTALLER (Including Drywall Hanging & Acoustical Work)............................$ 30.48 05.80
MILLWRIGHT.......................$ 32.11 15.80
CARP0361-006 07/11/2011
BAYFIELD COUNTY (West of Hwy 63)
Rates Fringes
Carpenters: (Including Drywall Hanging, Acoustical work)............................$ 27.20 14.75
CARP1348-006 05/03/2015
BAYFIELD COUNTY (Western 1/3)
Rates Fringes
MILLWRIGHT.......................$ 32.57 14.73
ELEC0014-001 06/01/2015
ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK
(Except Colby, Fremont, Lynn, Maryville, Sherman, Sherwood, Unity), CRAWFORD, DUNN, GRANT, IRON, JACKSON, MONROE, PEPIN, POLK, PRICE, RICHLAND, RUSK, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN COUNTIES
ELECTRICIAN......................$ 31.21 18.92
ELEC0014-005 06/01/2014
Rates Fringes
Teledata System Installer Installer/Technician........$ 22.50 12.72
Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).
ELEC0158-007 06/01/2015
DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE
(East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES
Electricians:....................$ 29.84 29.50% + 9.37
ELEC0159-001 06/01/2015
COLUMBIA, DODGE (West of Hwy 26 except Chester and Emmet Twps), GREEN LAKE COUNTY (Except Townships of Berlin, Seneca & St.
Marie), IOWA, MARQUETTE COUNTY (Except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), AND SAUK COUNTIES
Electricians:....................$ 35.75 19.87
ELEC0219-006 06/01/2015
FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)
ELECTRICIAN
Electrical contracts over $180,000....................$ 31.16 18.34 Electrical contracts under $180,000....................$ 28.96 18.26
ELEC0388-004 06/01/2013
ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARINETTE (Beecher, Dunbar, Goodman & Pembine), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Aniwa and Hutchins), VILAS AND WOOD
ELECTRICIAN......................$ 28.96 24.85% + 9.70
ELEC0494-010 06/01/2015
DODGE COUNTY (Area East of Hwy 26 including all of Chester Township, but excluding Emmet Township), FOND DU LAC (except Waupun), AND MANITOWOC (Schleswig) COUNTIES
ELECTRICIAN......................$ 29.95 20.95
ELEC0494-014 06/01/2015
DODGE (Area East of Hwy 26 including Chester Twp but excluding Emmet Twp), FOND DU LAC (Except Waupun), AND MANITOWOC (Schleswig) COUNTIES
Sound & Communications Installer...................$ 16.47 14.84 Technician..................$ 26.00 17.70
Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems. Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system.
work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products
ELEC0577-001 06/01/2015
GREEN LAKE (N. Part including Twps of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Twps of Crystal Lake, Neshkoro, Newton, and Springfield), WAUPACA, AND WAUSHARA
COUNTIES,
ELECTRICIAN......................$ 29.60 26.5%+9.15
ELEC0890-005 06/01/2015
DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, AND
WALWORTH COUNTIES
ELECTRICIAN......................$ 31.90 24.95% + $10.46
ENGI0139-004 06/01/2015
Rates Fringes
OPERATOR: Power Equipment
(1) Cranes, Tower Cranes with or w/o attachments over 100 tons; Cranes, tower Cranes with boom, leads and or jib length 176 ft or longer............$ 37.67 20.10
(2) Cranes, Tower Cranes with or w/o attachments 100 tons or less; Cranes, Tower Cranes with boom, leads, and or jib lengths 175 ft or less..............$ 36.42 20.10
(3) Travelling Crane (bridge type)...............$ 35.22 20.10
(4) Hydraulic Crane, 10 tons or less................$ 34.69 20.10
(6) Forklift...............$ 31.99 20.10
HAZARDOUS WASTE PREMIUMS:
EPA Level "A" Protection: $3.00 per hour EPA Level "B" Protection: $2.00 per hour EPA Level "C" Protection: $1.00 per hour
IRON0008-012 06/01/2014
CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC, MARINETTE,
OCONTO, OUTAGAMI, SHAWANO AND WALWORTH (Northeastern part)
IRONWORKER.......................$ 29.27 23.96
Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.
IRON0383-004 06/01/2015
ADAMS, COLUMBIA, CRAWFORD, DODGE, FLORENCE, FOREST, GRANT,
GREENE (Except S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD
IRONWORKER.......................$ 32.85 21.84
IRON0498-007 06/01/2008
GREEN (S.E. 1/3) AND WALWORTH (Except N.E. part) COUNTIES
Rates Fringes
IRONWORKER.......................$ 34.34 25.72
IRON0512-009 05/01/2015
BARRON, BUFFALO, CLARK, DUNN, JACKSON, PEPIN, POLK, RUSK,
TAYLOR AND TREMPEALEAU COUNTIES
IRONWORKER.......................$ 35.50 23.45
IRON0512-023 05/01/2015
ASHLAND, BAYFIELD, BURNETT, IRON, LINCOLN, ONEIDA, PRICE,
SAWYER, VILAS AND WASHBURN COUNTIES
IRONWORKER.......................$ 31.04 23.45
LABO0140-003 06/01/2015
BUFFALO, CRAWFORD, GRANT, JACKSON, JUNEAU, MONROE, RICHLAND,
TREMPEALEAU (Southern part), AND VERNON COUNTIES
Laborer, General.................$ 25.81 15.55 Laborer: Asbestos/hazardous material remover (Preparation, Removal and Encapsulation of Hazardous Materials from Non-Mechanical Systems).......................$ 24.92 15.55
NOTE: Mason Tender $.25 over general laborer scale; Pipelayer $1.00 over general laborer scale
LABO0268-001 06/01/2015
AREA 1: BARRON, CLARK (West 1/3), DUNN, PEPIN, POLK, RUSK
TAYLOR (West 1/3)
AREA 2: CLARK (East 2/3), LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR (East 2/3), VILAS, WOOD
AREA 3: BURNETT, IRON, SAWYER, WASHBURN
Laborer, General Area 1......................$ 25.81 15.55 Area 2......................$ 25.06 15.55 Area 3......................$ 24.21 15.55 Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems) Area 1......................$ 25.02 15.55 Area 2......................$ 24.47 15.55 Area 3......................$ 25.67 15.55
NOTE: Mason Tender $.25 over general laborer. Burnett, Iron, Sawyer & Washburn $.70 over general laborer.
LABO0330-001 06/01/2015
DODGE, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE,
KEWAUNEE, MANITOWOC, MARINETTE, MARQUETTE, MENOMINEE, OCONTO,
PORTAGE, SHAWANO, WAUPACA,WAUSHARA
Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems).........................$ 24.47 15.55 Laborers, General................$ 25.06 15.55
NOTE: Mason Tender $.25 over general laborer.
LABO0464-005 06/01/2015
ADAMS, COLUMBIA, GREEN, JEFFERSON, LAFAYETTE, SAUK, AND
WALWORTH COUNTIES
Laborer, General
Adams County................$ 25.06 15.55 Remaining Area..............$ 25.81 15.55 Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous Materials from Non-mechanical Systems) Adams County................$ 24.47 15.55 Remaining Area..............$ 24.47 15.55
LABO0464-008 06/01/2015
Rates Fringes
Landscape Laborer................$ 14.33 13.90
LABO1091-001 06/01/2015
BAYFIELD (West of County Trunk A including the Iron River National Fish Hatchery and Great Lakes Transmission Co., Station 6) COUNTY
Laborer, General.................$ 22.91 15.55 Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems).........................$ 22.91 15.55
LABO1091-002 06/01/2015
ASHLAND & BAYFIELD (East of County Trunk A exclusive of the Iron River National Fish Hatchery and Great Lakes Transmission Co., Station 6) COUNTIES
Laborer, General.................$ 22.91 15.55 Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems).........................$ 22.91 15.55
PLAS0599-003 07/01/2012
PEPIN COUNTY
CEMENT MASON/CONCRETE FINISHER...$ 27.80 18.10
PLASTERER........................$ 31.56 18.18
PLAS0599-007 06/01/2013
BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND,
TREMPEALEAU, AND VERNON COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 25.85 18.10
PLASTERER........................$ 29.67 17.03
PLAS0599-011 06/01/2014
GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 33.15 16.78
PLASTERER........................$ 33.15 16.78
PLAS0633-046 05/01/2012
BAYFIELD, PRICE, AND SAWYER COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.69 16.30
PLASTERER........................$ 30.32 17.05
PLUM0011-009 05/04/2015
ASHLAND BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER (Including HVAC work).......................$ 38.17 18.13
* PLUM0075-006 06/01/2015
DODGE (Watertown), GREEN, JEFFERSON, AND LAFAYETTE COUNTIES
Rates Fringes
PLUMBER (Including HVAC work)....$ 39.87 20.12
* PLUM0075-008 06/01/2015
COLUMBIA, IOWA, MARQUETTE, RICHLAND, AND SAUK COUNTIES
PLUMBER (Including HVAC work)....$ 38.82 20.12
PLUM0118-003 06/01/2015
WALWORTH COUNTY
Rates Fringes
PLUMBER/PIPEFITTER (Including HVAC work).......................$ 39.20 19.25
PLUM0400-002 06/01/2015
ADAMS, CALUMET, DODGE (Except Watertown), DOOR, FOND DU LAC, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE (Except Niagara), MENOMINEE, OCONTO, OUTAGAMIE, SHAWANO, WAUPACA, WAUSHARA, AND
WINNEBAGO COUNTIES
PLUMBER/PIPEFITTER (Including HVAC work)
(1) Small buildings (except industrial and power plants) where plumbing or heating is $50,000 or less.............$ 31.23 17.02
(2) All other work..........$ 33.64 17.20
PLUM0434-004 05/31/2015
BARRON, BUFFALO, CLARK, CRAWFORD, DUNN, FLORENCE, FOREST,
GRANT, JACKSON, JUNEAU, LANGLADE, LINCOLN, MONROE, ONEIDA,
PEPIN, PIERCE, POLK, PORTAGE, PRICE, RUSK, TAYLOR, TREMPEALEAU,
VERNON, VILAS, AND WOOD COUNTIES
PLUMBER/PIPEFITTER (Including HVAC work).......................$ 36.75 16.32
PLUM0601-006 06/01/2015
DODGE (Watertown), GREEN, JEFFERSON, AND LAFAYETTE COUNTIES
Rates Fringes
PIPEFITTER (Including HVAC work)............................$ 42.36 21.64
PLUM0601-008 06/01/2015
COLUMBIA, IOWA, MARQUETTE, RICHLAND, AND SAUK COUNTIES
PIPEFITTER (Including HVAC work)............................$ 45.55 18.44
SHEE0010-031 05/01/2008
ASHLAND, BAYFIELD AND IRON COUNTIES
Rates Fringes
SHEET METAL WORKER...............$ 27.53 14.61
SHEE0018-003 06/01/2011
FOND DU LAC AND MANITOWOC COUNTIES
Rates Fringes
Sheet Metal Worker (Including HVAC work).......................$ 31.88 17.40
SHEE0018-004 06/01/2015
ADAMS, DOOR, FLORENCE, FOREST, GREEN LAKE, KEWAUNEE, MARINETTE,
MARQUETTE, MENOMINEE, OCONTO, SHAWANO, WAUPACA, AND WAUSHARA
Sheet Metal Worker (Including HVAC work).......................$ 30.82 21.85
SHEE0018-014 06/01/2011
DODGE AND JEFFERSON COUNTIES
Rates Fringes
Sheet Metal Worker (Including HVAC work).......................$ 37.20 17.01
SHEE0018-015 09/01/2010
WALWORTH COUNTY
Rates Fringes
SHEET METAL WORKER (Including HVAC work).......................$ 31.85 22.50
SHEE0018-017 06/01/2011
GREEN COUNTY
Sheet Metal Worker (Including HVAC work).......................$ 32.75 20.36
SHEE0018-018 06/01/2015
LANGLADE, LINCOLN, ONEIDA, PORTAGE, AND WOOD COUNTIES
Rates Fringes
Sheet Metal Worker (Including HVAC work) Contracts $120,000 or less..$ 20.57 11.60 Contracts over $120,000.....$ 28.36 24.59
SHEE0018-022 06/01/2015
BARRON, BUFFALO, BURNETT, CLARK, DUNN, JACKSON, PEPIN, POLK,
PRICE, RUSK, SAWYER, TAYLOR, TREMPEALEAU, AND WASHBURN COUNTIES
Sheet Metal Worker (Including HVAC work).......................$ 28.63 23.79
SHEE0018-023 06/01/2015
COLUMBIA AND SAUK COUNTIES
Rates Fringes
Sheet Metal Worker (Including HVAC work).......................$ 35.55 24.61
SHEE0018-024 06/01/2015
CRAWFORD, GRANT, JUNEAU, MONROE, RICHLAND, AND VERNON COUNTIES
Rates Fringes
SHEET METAL WORKER (Including HVAC work).......................$ 28.75 21.62
TEAM0346-003 05/01/2013
ASHLAND, BAYFIELD, BURNETT, SAWYER & WASHINGTON COUNTIES
Rates Fringes
TRUCK DRIVER
2 Axle Trucks...............$ 27.42 14.986
TEAM0662-002 06/01/2015
ADAMS, BARRON, BUFFALO, CLARK , DOOR, DUNN, JACKSON, JUNEAU,
KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MENOMINEE, OCONTO,
ONEIDA, PEPIN, POLK, PORTAGE, PRICE, RUSK, SHAWANO, TAYLOR,
TEMPEALEAU, WAUPACA & WOOD COUNTIES
TRUCK DRIVER
2 Axle Trucks...............$ 27.46 15.9775
SUWI2002-001 01/23/2002
Rates Fringes
Fence Installers.................$ 15.00 2.37
GLAZIER..........................$ 20.21 1.86
Painters:
Brush & Roller (Excluding Drywall Finishing).........$ 14.64 2.55 Spray.......................$ 13.72 2.25
Power Equipment Operator Backhoe.....................$ 17.454 7.61 Excavator...................$ 17.37 7.45 Front End Loader............$ 23.36 4.61
ROOFER...........................$ 15.52 3.21
TRUCK DRIVER (3-Axle)............$ 15.28 4.78
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION