W911SA-20-Q-3085 FM SCADA - Attachment 5 - Estimate Workload for Annual Services.pdf
PDF 304 KB Posted
- Solicitation number
- W911SA-20-Q-3085
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimate Workload for Annual Services
Workload estimates are provided as a guide to the Contractor in estimating manpower workload and scheduling requirements. Variations can be expected during the course of the contract and quantities can be higher or lower depending on Installation mission requirements. Variations/deviations in workload data shall not constitute grounds for a claim against the Government. Annual workload estimates is a calculation based on regulatory guidance, management estimate and historical trend analysis of workload.
SCADA SYSTEM MAINTENANCE FOR WATER AND WASTEWATER FACILITIES
Item Annual
Estimated Quantity*
Annual Estimated Minimum Quantity
Annual Estimated Maximum Quantity
Unit Service
Frequency
Preventative Maintenance Inspection
1 1 1 Each Annual
Routine Service Call 7 0 12 Each As Needed Routine Service Call Hours 312.50 0 400 Hours As Needed Emergency Service Call 1 0 4 Each As Needed Emergency Service Call Hours
3 0 40 Hours As Needed
Parts and Materials $6,720.75 0 $12,000.00 Dollars As Needed Mobilization 7 0 12 Each As Needed On-Call Technical Support 12 0 24 Each As Needed CMR 1 1 1 Each Annual
*Annual Estimated Quantity is an annual average of 32 months as indicated in Attachment 5 - Historical Service Annual Workload.
File details come from the government source that posted it. Updated .