Attachment 3_TE 1 Task List_V2 6 June 2025.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Solicitation - Carpet and Flooring Requirements Contract
Solicitation number
W911S725RA0007
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base

Technical Exhibit 1: Base
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges.50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges.1500FT$ - 0$ - 0
17Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT).80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT).2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment.1200SY$ - 0$ - 0
23Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base.600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition.300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting.100SF$ - 0$ - 0
36Furnish & Install Rubber Matting.500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure proposal totals are annotated for each CLIN on the Solicitation document.

OY1

Technical Exhibit 1: Option Year 1
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges.50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges.1500FT$ - 0$ - 0
17Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT).80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT).2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment.1200SY$ - 0$ - 0
23Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base.600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition.300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting.100SF$ - 0$ - 0
36Furnish & Install Rubber Matting.500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure proposal totals are annotated for each CLIN on the Solicitation document.

OY2

Technical Exhibit 1: Option Year 2
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges.50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges.1500FT$ - 0$ - 0
17Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT).80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT).2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment.1200SY$ - 0$ - 0
23Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base.600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition.300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting.100SF$ - 0$ - 0
36Furnish & Install Rubber Matting.500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure proposal totals are annotated for each CLIN on the Solicitation document.

OY3

Technical Exhibit 1: Option Year 3
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges.50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges.1500FT$ - 0$ - 0
17Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT).80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT).2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment.1200SY$ - 0$ - 0
23Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base.600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition.300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting.100SF$ - 0$ - 0
36Furnish & Install Rubber Matting.500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure proposal totals are annotated for each CLIN on the Solicitation document.

OY4

Technical Exhibit 1: Option Year 4
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges.50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges.1500FT$ - 0$ - 0
17Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT).80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT).2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment.1200SY$ - 0$ - 0
23Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base.600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition.300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting.100SF$ - 0$ - 0
36Furnish & Install Rubber Matting.500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure proposal totals are annotated for each CLIN on the Solicitation document.

File details come from the government source that posted it. Updated .