Attachment 3_TE 1 Task List.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Solicitation - Carpet and Flooring Requirements Contract
Solicitation number
W911S725RA0007
Issued by

About this file

The file is a Technical Exhibit 1 task list detailing a comprehensive carpet and flooring requirements contract for Fort Leonard Wood, Missouri. The solicitation (W911S725RA0007) is a small business set-aside, firm fixed-price requirements contract for flooring services, with a base year and four optional years. The contract covers an extensive range of flooring services including removing, installing, and furnishing various types of carpeting (roll carpeting, carpet squares), resilient flooring (VCT, bio-based tile, luxury vinyl tile), underlayment, wall base, stair treads, rubber matting, and floor mats.

Key solicitation details include a proposal submission deadline of 27 June 2025 at 4:00 PM CST, with questions due by 12 June 2025. The contract is classified under NAICS code 238330 (Flooring Contractors) with a size standard of $19 million. The scope involves contractor support for carpet and flooring replacement, maintenance, and repair as part of routine life cycle maintenance of buildings, excluding new construction projects. The contract will be awarded by the Department of the Army Materiel Command Mission and Installation Contracting Command, and requires active System Award Management (SAM) registration for offerors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base

Technical Exhibit 1: Base
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment$ - 0$ - 0
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment1200SY$ - 0$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting100SF$ - 0$ - 0
36Furnish & Install Rubber Matting. Furnish & Install Rubber Matting500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.

OY1

Technical Exhibit 1: Option Year 1
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment$ - 0$ - 0
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment1200SY$ - 0$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting100SF$ - 0$ - 0
36Furnish & Install Rubber Matting. Furnish & Install Rubber Matting500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
EA$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.

OY2

Technical Exhibit 1: Option Year 2
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment$ - 0$ - 0
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment1200SY$ - 0$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting100SF$ - 0$ - 0
36Furnish & Install Rubber Matting. Furnish & Install Rubber Matting500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
EA$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.

OY3

Technical Exhibit 1: Option Year 3
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment$ - 0$ - 0
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment1200SY$ - 0$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting100SF$ - 0$ - 0
36Furnish & Install Rubber Matting. Furnish & Install Rubber Matting500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.

OY4

Technical Exhibit 1: Option Year 4
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 12500SY$ - 0$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0$ - 0
5.4 Resilient Flooring
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)80000SF$ - 0$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0$ - 0
5.5 Underlayment$ - 0$ - 0
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment1200SY$ - 0$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0$ - 0
5.6 Base
24Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.20000FT$ - 0$ - 0
25Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1500FT$ - 0$ - 0
26Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.1250FT$ - 0$ - 0
27Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.300FT$ - 0$ - 0
28Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.200FT$ - 0$ - 0
29Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0$ - 0
30Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0$ - 0
5.7 Stair Tread, Risers, & Nosing
31Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0$ - 0
32Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0$ - 0
33Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.100FT$ - 0$ - 0
34Furnish & Install Extruded Aluminum Stair Tread. 11" only500FT$ - 0$ - 0
5.8 Rubber Matting
35Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting100SF$ - 0$ - 0
36Furnish & Install Rubber Matting. Furnish & Install Rubber Matting500SF$ - 0$ - 0
5.9 Floor Mats
37Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0$ - 0
38Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0$ - 0
5.10 Additional Services
39Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.5000SY$ - 0$ - 0
40Afterhours Labor for Carpet1000SY$ - 0$ - 0
41Afterhours Labor for Resilient Flooring3000SF$ - 0$ - 0
42Afterhours Labor for Base3000FT$ - 0$ - 0
43Trimming the Bottom of Wood Doors20EA$ - 0$ - 0
44Trimming the Bottom of Metal Doors20EA$ - 0$ - 0
45Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal5000SF$ - 0$ - 0
46Apply roll-on masonary floor sealant5000SF$ - 0$ - 0
47Furnish and install welded vinyl flooring with intergral cove base2500SF$ - 0$ - 0
$ - 0$ - 0
Year Total$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.

File details come from the government source that posted it. Updated .