Fiber repair for 200 and 300 meter targets at Range 24
1.0 INSTALLATION SCOPE
1.1 General: Install 6 strand single mode armored fiber from BD-7 (Emerson control box) to 200 meter and 300 meter targets. At Range 24.
2.0 REQUIREMENTS
1.2 2.1 General: Excavate, locate, and repair existing collapsed buried conduit between BD-7 (Emerson control box) to 200 meter and 300 meter targets. Pull lines in conduit after identifying which lines are bad.
a. Obtain Plans & Permits to excavate.
b. Locate and repair the existing collapsed buried conduit between the BD-7 and 200 meter target NEMA closure. Identify lines needing repair.
c. Locate and repair the existing collapsed buried conduit between the BD-7 and
300 meter Target NEMA closure. Identify lines needing repair.
2.1.1 Tasks: Install 6 strand single mode armored fiber optic cable from BD-7 (Emerson control box) to 200 meter and 300 meter targets.
a. Install 6 strand single mode armored fiber optic cable from BD-7 (Emerson control box) to 200 meter target
b. Install 6 strand single mode armored fiber optic cable from BD-7 (Emerson control box) to 300 meter target
c. Re-terminate new fiber in the 200 meter NEMA box using SC/UPC style connectors. Clean connectors and plug into existing SC bulkhead adapter plate.
d. Re-terminate new fiber in the 300 meter NEMA box using SC/UPC style connectors. Clean connectors and plug into existing SC bulkhead adapter plate.
e. Re-splice 200 and 300 meter fiber in BD-7 Coyote closure.
2.1.2 Tasks: Test 6 strand single mode armored fiber optic cable from BD-7 (Emerson control box) to Tower.
a. Test fiber link from Tower patch panel to the 200 meter BD-7 (Emerson control box bulkhead using OPM-LS and OTDR
b. Test fiber link from Tower patch panel to the 300 meter BD-7 (Emerson control box bulkhead using OPM-LS and OTDR
c. Reconnect all patch cords and have Range maintenance perform 200 and 300 meter target acquisition test to confirm target is operating properly.
3.0 DELIVERABLES:
3.1 Work Completion Date. A job site walk through is required to be performed with
Range control personnel before any work is to start. Period of Performance is 30 days after “Notice to Proceed” is issued.
3.2 Status Reports. The Contractor shall keep the Government Personal apprised of any issues at the worksites
3.3 SAFETY REQUIRMENTS:
3.3.1 General Safety: During progress of work, the Contractor shall protect all personnel, whether Government or civilian, from any and all safety hazards caused by the construction operations. The contractor shall follow all Federal, State and local laws in accordance with 29 CFR 1910 (General Industries Standards), and 29 CFR 1926 (Construction Standards).
3.3.2 Fire Prevention: The current version of FLW Regulation 420-2 “Post Fire Regulations” is by this reference made a part of this solicitation and resultant contract. The Contractor’s operation shall conform to all applicable portions of this document. All personnel entering on duty as Contractor’s employees shall be instructed in the fire prevention program of the Post and shall be advised of the requirement of the Post Fire Regulations as they pertain to this particular contract.
3.4 WORKSITE HOUSEKEEPING:
3.4.1 The Contractor shall remove all trash and disposal material from the worksite before the end of each day, to the extent it is consistent with standard construction practices on Government work sites. The Contractor shall take all possible precautions to maintain the work site, at all times, in a condition that will prevent damage or injury to person or property, Government or otherwise. The above precautions shall include protection from weather conditions. The Contractor shall be responsible for all damages caused by the negligent acts or omissions of his employees, sub-contractors, or agents during Contract performance.
3.5 RESPONSIBLITY FOR DAMAGE:
3.5.1 Damage to Personal Property: The Contractor shall be solely responsible for all damage to Government and occupant personal property caused by the Contractors’ personnel, subcontractors, his agents, or by the performance of his work.
3.5.2 All other wastes generated during Contractor operations shall be disposed of off post by the Contractor at his/her expense
3.6 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND
PROCEDURES:
3.6.1 All Contractor and sub-contractor personnel performing tasks on this SOW shall comply with all applicable installation, facility and area commander installation/facility access and local security policies and procedures which will be provided to the Contractor by a Government representative upon written request to the Contracting Officer. Contractor shall provide all information required for background checks to meet installation access requirements as performed by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Requesting Contractor shall submit request for installation pass to the KO at https://vcc1.icmvcc.com/im3500/. There is no charge to the Contractor for this pass. Contractor personnel shall comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of the base contract to this task order, should the Force Protection Condition
(FPCON) at any facility or installation change, the Government may require changes in Contractor security matters or processes.
3.6.2 Antiterrorism (AT) Level I Training. All contractor and sub-contractor employees requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training. IAW AR 525- 13, 3 DEC 19, AT Level I Awareness training will be conducted by a certified Level II trained ATO. For contracts that cross fiscal years, or for contracts with option years, all contractor personnel shall complete annual AT Level I awareness training. The Installation AT Office or a certified Level II trained ATO on the installation will provide the training. Contact information for this Government employee will be provided at the kick-off meeting.
3.6.3 The Installation AT Office or a certified Level II trained ATO will provide a one hour training session conducted on FLW for Contractor personnel working on this installation. The COR will coordinate this training at the time of task order modification or award. Contractor personnel working at installations other than FLW shall coordinate with the COR and local AT Offices to obtain training applicable to that installation.
3.6.4 iWatch Training: Within 10 calendar days of contract award and within 10 calendar days of new Contractor employees commencing work on this contract, all Contractor and sub-contractor employees shall review the FLW Directorate of Emergency Services (DES) web link for iWatch training located at http://www.wood.army.mil/LEC/iWatch/iWatch.htm. This locally developed training will inform employees of the types of behavior to watch for and how to report suspicious activity. Suspicious activity shall be reported to the KO. There is no charge to the Contractor for this review. The burden to complete this training is approximately 20-minutes per employee.
3.6.5 The OPSEC Plan and User Agreement will be available for Contractors to review through the Installation OPSEC Officer. The Contracting Officer’s Representative (COR) will ensure the Contractor is aware of the Installation's OPSEC Plan and is in compliance with the Installation's OPSEC Plan during contract performance.
3.6.6 For contracts that require OPSEC training: Pursuant to AR 530-1, all
Contractor personnel must complete initial Level I OPSEC training within 30 calendar days of beginning performance on this contract. For contracts that cross fiscal years, or for contracts with option years, all contractor personnel shall complete annual OPSEC awareness training.
3.6.7 The Installation OPSEC Office, or a certified Level II trained OPSEC Officer will provide Level I OPSEC training on Fort Leonard Wood for Contractor personnel working on this installation. Contact information for this Government employee will be provided at the kick-off meeting.
3.6.8 The COR will coordinate this training at the time of task order modification or award. Contractor personnel working at installations other than FLW shall coordinate with the COR and local OPSEC Offices to obtain training applicable to that installation.
3.6.9 Contractor shall provide a list of personnel trained to the COR within five (5) business days of completion of training
4.0 SECURITY:
4.1 The Contractor shall not be on site without prior notification to the DPW Contract
Inspection Branch.
4.2 Contractor personnel shall have valid civilian ID’s.