W911S7‐20‐Q‐0011 Questions and Answers

Fiber Optic Line Repair Range 24

Q1. SOW 2.0 Requirements 1.2.2.1 Excavate, locate, and repair existing collapsed buried conduit between BD‐7 (Emerson control box) to 200 meter and 300 meter targets. Are all targets on 200m range and 300 range inoperable?

A1: Correct, all targets on the 200 and 300 meter lines are INOP Reference:

Q2: Drawing ES105 reference several drawings not included. The missing drawings denote details reference on the plan drawing. Can the referenced drawings ES106, ES504, ES505, ES506, ES507, es508, ES509, ES510, A‐T‐101 be provided?

A2: ES 105 is the only drawing needed for reference to this project. Other drawings have been added to the Solicitation by way of amendment.

Reference:

Q3: Drawing ES105 sheet notes do not align with the SOW. Is work shown on Drawing ES105 completed work, already in place?

A3: Yes, ES 105 is only for reference Reference:

Q4: Are Drawing ES105 keyed notes 1 and 2 applicable to this RFQ?

A4: No, ES 105 is for reference only Reference:

Q5: Drawing ES105 Keyed note 1 states that FOPB shall be N3R. Is FOPB existing?

A5: Yes it is existing, ES 105 is for reference only Reference:

Q6: Drawing ES105 Keyed note 2 states that contractor shall install a 2” conduit with pull rope to Operations/Storage Building for metering cable. Is this conduit new to this project or existing to remain?

A6: ES 105 is for reference only: Conduit is already installed on the range. 1 ½” Conduit needs repaired Reference:

Q7: Drawing ES105 does not identify the location of BD‐7(Emerson Control Box). Where Is BD‐7 (Emerson Control box) located?

A7: ES 105 is for reference only: BD‐7 is located at each target location Reference:

Q8: SOW 2.1b references 200 meter target NEMA closure. Drawing ES105 does not identify the location of the 200 meter target NEMA enclosure. Where is the 200 meter target NEMA closure located?

A8: ES 105 is for reference only: NEMA enclosures are at each target location Reference:

Q9: SOW 2.1c references 300 meter target NEMA closure. Drawing ES105 does not identify the location of the 300 meter target NEMA enclosure. Where is the 300 meter target NEMA closure located?

A9: ES 105 is for reference only: NEMA enclosures are at each target location Reference:

Q10: SOW 2.1.1 e references B‐7 Coyote closure. Drawing ES105 does not identify the location of the B‐ 7 Coyote closure. Where is the B‐7 Coyote closure located?

A10: ES 105 is for reference only: Coyote enclosure on ES 105 Key note 1 Reference:

Q11: b. Locate and repair the existing collapsed buried conduit between the BD‐7 and 200 meter target NEMA closure. Identify lines needing repair. c. Locate and repair the existing collapsed buried conduit between the BD‐7 and 300 meter Target NEMA closure. Identify lines needing repair.

What type and size of conduit is currently installed at the firing range 24?

A11: Conduit is 1‐1/2”, ES 105 references it as 2” but is 1‐1/2” Reference:

Q12: Are all targets at the range not working, 100m, 200m, 300m?

A12: No, just the 200m&300m Reference:

Q13: At the site visit it was mentioned that the work crews would need to attend some training to be able to work on base. How many hours and what type of training is this?

A13: Refer to paragraph 3.6 of the SOW dated 28 May 2020 and also, Range Operations requires is a UXO Unexploded Ordinance class and we give it here and it takes 30minutes Reference: SOW paragraph 3.6

Q14: When we obtain the dig permit will the ducts that need to be repaired be located by the base?

A14: No, it is the contractors responsibility to located the ducts Reference:

Q15: ES105 refers to a detail on ES510. This drawing was omitted from the Line schematic drawings posted on beta.sam 6/10/2020. Can Drawing ES510 be provided?

A15: ES105 is a reference sheet only, nothing on this sheet shall be used other than what is indicated for 200 and 300 meter targets. Any other sheet that are reference shall not be used. ES510 has nothing to do with what need repaired.

Q16: Is the Contractor required to only test the Fiber links once line repairs are completed?

A16: Please refer to SOW Paragraph 2.1.2 a, b, and c.

End of Q&A