Text version
W911S7-18-D-00XX
Refuse and Recoverable Materials Services
PRS
Printed 4/5/2018
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
1. PURPOSE: This exhibit explains the requirements and standards for performance of service necessary for acceptable contract performance. It describes the quality assurance methods the Government will use to evaluate the Contractor’s performance in meeting the contract requirements, and describes the responsibility of the Contractor when a standard for performance is determined to be in noncompliance with contract requirements. The Performance Requirements Summary Table in this Technical Exhibit details the following information:
1.1 Column 1 – Required service under provision of contract.
1.2 Column 2 – Standard for performance of required service.
1.3 Column 3 – The acceptable quality level (AQL) for performance of required service. The AQL is the maximum percent defective (or the number of defects per hundred units) that, for purposes of sampling inspection can be considered satisfactory.
1.4 Column 4 – The inspection method and frequency that required services will be evaluated by the
Government.
1.5 Column 5 – The procedure the Government will use in reducing the Contractor’s payment when a standard for performance is determined to be in non-compliance with contract requirements.
2. BASIS FOR GOVERNMENT’S QUALITY ASSURANCE PROCEDURES: The primary quality assurance procedures that will be used by the Government to inspect and evaluate a Contractor’s performance will be random sampling, 100% inspection and customer complaints.
3. CRITERIA FOR RANDOM SAMPLE INSPECTIONS: Random sampling inspection criteria are derived from
ANSI/ASQ Z1.4-2003. When the number of unsatisfactory ratings in the Contractor’s performance determined by the Government Inspector exceeds the AQL Ac number for any requirement, the Contractor shall complete a Contract Discrepancy Report (CDR). The CDR shall require the Contractor to explain, in writing, why performance was unacceptable, how performance shall be returned to acceptable levels, and how reoccurrence of the problem shall be prevented in the future.
4. DETERMINATION OF CONTRACTOR’S PERFORMANCE
4.1 If the number of defects for a specific service is equal to or greater than the AQL maximum allowable degree of deviation, the service shall be determined unacceptable.
4.2 When performance in any specific service is determined unacceptable and clearly, the fault of the
Contractor, the Contractor shall re-perform the work at no additional cost to the Government.
PRS
PERFORMANCE REQUIREMENTS SUMMARY TABLE
Required Service Standard AQL Surveillance Deduction for not
Meeting AQL
PWS 5.1 - COLLECTIONS
5.1.1 Containers properly located, Adequate number of containers, Area around container clean, Containers clean
TE2, TE3 and TE4:
All tasks accomplished properly, Response to Government requested changes
10%
5% Random Sampling of the collections per month and
Customer Complaints 50 - 75% Inspection of Government requested changes
10% Task Deduction of the appropriate task
Tasks 101, 102, 103 and 106
5.1.2 Containers properly positioned for easy access for customers
TE2, TE3 and TE4:
Containers properly positioned, Response to Government requested changes
10%
5.1.3 Collection schedules are in
conjunction with the finalized schedule
TE2, TE 3 and TE4:
Adherence to the finalized schedule, Response to Government requested changes
10%
PWS 5.2 - DISPOSALS
5.2.2 Disposal tickets and fees
Submittal of all disposal tickets showing required information 0% 100% Inspection
Deduction for the tonnage invoiced with no disposal ticket
Tasks 104 and 105
5.2.5.3 Haul and dispose of waste soil
disposal tickets and fees
Submittal of all disposal tickets showing required information 0% 100% Inspection
Deduction for the tonnage and loads invoiced with no disposal ticket
Tasks 109 and 110
PWS 5.3 – ACCOUNTABILITY, MAINTENANCE AND CONDITION OF PROPERTY AND EQUIPMENT
5.3 Maintenance of GFP
GFP is maintained, painted and repaired to the standards set in section 5.3 of the PWS
10% 100% Inspection and Customer Complaints
Task 107
5.3 Maintenance of CFP
CFP is maintained, painted and repaired to the standards set in section 5.3 of the PWS
10% 5% Random Sampling of
CFP per month and Customer Complaints
Task 108
PRS
Required Service Standard AQL Surveillance Deduction for not
Meeting AQL
PWS 5.4 – OPERATION OF THE FLW RECYCLE CENTER
5.4.1 General
Operating hours are adhered to, No improper use of the recycle center, Recycle trailers are placed and removed as requested
10%
Monthly Random Inspections of Recycle Center, 50%
Random Sampling of trailer movement and Customer
Complaints
Task 201
5.4.2 Sales and Marketing
Appropriate invoices of sales and bid documentation 10%
100% Inspection of Invoice and Bid Solicitation Review
5% Task Deduction of
Task 204
5.4.3 Material Receiving and
Handling
All materials are properly baled and prepared for transport / sale. Facility does not become overloaded
1 defect per inspection or month
Monthly Random Inspections and Customer Complaints
5.4.4 Facility and Equipment
Cleanliness and Maintenance
Recycle Center equipment, building and grounds are clean, free of trash and broken glass, and policed daily at the close of business
1 defect per inspection or month
Monthly Random Inspections and Customer Complaints
5.4.5 Education
Brochures made and kept available.
Response to Government requested changes
0% Monthly Random Inspections and Customer Complaints
5.4.8 Used Oil
No evidence of unaddressed spills, log book maintained, legal compliance, tank levels maintained at less than
2/3 capacity, and proper documentation and samples submitted for sampling and transport
0%
Monthly Random Inspections, 100% Report Inspections and Customer
Complaints
PWS 5.5 – OPERATION OF THE FLW COMPOST / CLEAN FILL AREA
5.5 Operation of the FLW Compost /
Clean Fill Area
Only compost / clean fill allowed. No unauthorized materials.
Monthly reports complete and submitted on time
2 defects per month
Monthly Random Site Inspections, 100% Report Inspections and Customer
Complaints
5.5.1 Operation
Response time adhered to for Customer request for access
1 defect per month
Customer Complaints
PRS
Printed 4/5/2018
Required Service Standard AQL Surveillance Deduction for not
Meeting AQL
PWS 5.6 – OPERATION OF THE FLW BRUSH / STUMP AREA
5.6 Operation of the FLW Brush /
Stump Area
Only brush / stumps allowed. No unauthorized materials.
Monthly reports complete and submitted on time
2 defects per month
Monthly Random Site Inspections, 100% Report Inspections and Customer
Complaints
5.6.1 Operation
Response time adhered to for Customer request for access
1 defect per month
Customer Complaints
PWS 5.8 – E-WASTE RECYCLING
5.8 E-Waste Recycling
Provide certified and licensed e-waste recycler for 3 events per year.
Certificate of recycling within 2 weeks of each event
0% 100% Report Inspections and
Customer Complaints
Task 204
PWS 5.9 – DUMPSITE CLEANUP
5.9 Dumpsite Cleanup
Dumpsites cleaned and passed inspection within 5 working days of notice
0% 100% Inspections and Customer Complaints
Task 202
PWS 5.10 – FINES
5.10 Fines
Legally compliant, no EPA, MDNR or Army
EPAS findings, NOV’s, etc.
0% Third party – State, Federal, Army Planned and Random
Inspections
100% of assessed fines deducted from appropriate task