PRS.pdf
PDF 8 KB Posted
- Attached to
- EDVSN CCTV Preventative Maintenance & Repair Services Federal contract opportunity
- Solicitation number
- W911S7-17-Q-0010
About this file
Performance Requirements Summary
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A.pdf | ||
| PWS_revised_17_August_2017.pdf | ||
| Solicitation_Amendment_0001.pdf | ||
| Solicitation.pdf | ||
| PWS.pdf | ||
| Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C.4 Performance Requirements Summary
C.4.1. The specific requirements listed in section C.3 Tasks of the Performance Work Statement (PWS), includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
C.4.2. This table specifies the standard for satisfactory performance of the tasks specified in this performance work statement. The contractor shall perform the tasks in accordance with manufacturer’s service manuals.
Performance Objective
Performance Standard AQL (% deviation from Standard)
Method of Surveillance
Preventative Checks and Maintenance PWS para C.3
Quarterly PM including repair service orders to correct deficiencies identified during PM shall be performed on all EDVSN equipment/software
5% COR Inspection
Service Orders para PWS C.3.9
The Contractor shall respond to receipt of Service Order within 48 hours with an evaluation response. Repairs must be completed within 7 days from COR authorization.
5% COR Inspection
Required Records/Reports PWS para C.3.10.
The contractor shall maintain a detailed record of each service order
5% COR Inspection
File details come from the government source that posted it. Updated .