RFI Response 1.pdf

PDF 42 KB Posted

Attached to
A-E HVAC Design Services Federal contract opportunity
Solicitation number
W911S2-20-R-88JA
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Drum

About this file

This document contains a request for information response and details regarding a federal contract opportunity for architectural and engineering design services. The opportunity is for child development center HVAC design services at Fort Drum, New York, with a response submission deadline of April 30, 2020. The requirement is set aside 100% for women-owned small businesses. Interested firms must submit a Standard Form 330 and be registered in the System for Award Management database. The contract will be awarded by the Mission and Installation Contracting Command of the Department of the Army Materiel Command. The North American Industry Classification code is 541330 for engineering services, with a small business size standard of $16.5 million. The service code is for construction restoration of real property.

View the file

Other files for this federal contract opportunity

Other files attached to A-E HVAC Design Services, newest first.
File Type Posted
20-R-88JA Synopsis AB-18008-8JA(Amendment 1).pdf PDF
20-R-88JA Synopsis AB-18008-8JA.pdf PDF
SF330-16f.pdf PDF
20-R-88JA PWS AB-18000-8JA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Response

Q1. I have a question regarding Notice ID W911S2-20-R-88JA. In PWS Section 4.4- A/E Services, it does not list sprinkler design or modification as part of the scope of work. In PWS Part 7-Mechnical Engineering, specifically paragraph 7.3, there is a detailed description on the requirements for fire protection drawings and specs. Is a new sprinkler system, or any sprinkler work, part of the scope of work for this project?

Thank you in advance for your help with this item.

A1. The scope of work does not include complete replacement of the sprinkler system.

The Designer of Record (DOR) shall determine what, if any sprinkler work is required as part of the design to construct the HVAC system and other components IAW UFC's and Building Code Requirements. The specifications written in 7.3 are included in the documents to guide the A/E firm if sprinkler work is deemed necessary.

Q2. I had a question on Factor 1 with respect to Secondary Disciplines

Are you specifically requiring the following documents to be part of the submission package? Would these drawings be examples from projects related to this current project?

(5) Drawings of Existing Structures

(6) Drafting/Computer Aided Design and Drafting

(7) Provide scanned digital PDF copies of existing construction document

(8) Provide scanned digital DGN or DWG copies of existing construction drawings

A2. Part A was updated by removing reference to Secondary Disciplines, and adding Architect to the Primary Disciplines. Synopsis modified to reflect this.