This is a Questions and Answers document clarifying requirements for a monument sign refacing and refurbishment contract. The requirement involves refacing and refurbishing five stone/cement faces across three monument sign locations: Victory (Lee) Boulevard (double-sided), Jefferson Avenue (double-sided), and Jefferson/Madison (single-sided). The scope of work encompasses repairs to these existing monument signs rather than procurement of five separate signs.

The contract is subject to Davis-Bacon wage determination requirements, with the applicable determination included as Attachment #7. Work must be completed before October 1, 2026, with a response date extended to 5 PM EST on August 24, 2026. Power to the canopy electrical panel box is already in place from previous signage, and the contractor is not responsible for providing new circuits. No pre-quote site visit is being offered; however, measurements and specifications are available in attachments #2, #3, #4, and #5 to support pricing. All measurements, specifications, and material requirements will be verified with the Government at the initial site visit after contract award in accordance with PWS paragraph 1.3.3.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Monument sign quantity. The Performance Work Statement states "reface and refurbish five existing monument signs." The RFI graphic states "Repair 5 stone/cement faces" and identifies three locations: Victory (Lee) Blvd double sided, Je erson Ave double sided, and Je erson/Madison single sided. Two double-sided signs plus one single-sided sign is three signs and five faces. Please confirm whether the requirement is five faces across three monument locations, or five separate monument signs. This materially a ects our price.

The requirement is five faces across three monument locations.

2. Monument sign condition. Are photographs, dimensions, or a condition assessment of the existing sign faces available to o erors, or should o erors price the repair scope based on the drawings provided in the attachments?

Please see attachment #4 for additional pictures and attachment #5 for additional information.

3. Period of performance. What is the period of performance for this requirement, or the required completion window measured from the date of award? We were not able to locate a stated duration or completion date in the solicitation, the Performance Work Statement, or Amendment 0001.

Work must be completed before 01 October 2026. Please see Amendment 0003. Please note that the response date has been extended to 5 PM EST on 24 August 2026.

4. Existing canopy electrical. The attachments reference abandoned electrical in the canopy box from a previous demolition. Will the existing circuit and any required disconnect be made available to the Contractor at the existing service, or is the Contractor responsible for providing a new circuit from the panel?

Power to panel box is already in place from previous signage.

5. Wage determination. Please confirm whether a Service Contract Act or Davis- Bacon wage determination applies to this requirement, and if so, that the applicable determination is included in the solicitation package.

Davis-Bacon Wage determination has been attached to the solicitation. See Attachment #7.

6. Site visit. Please confirm that no pre-quote site visit is being o ered, and that all measurements, specifications, and materiel requirements will be verified with the Government at the initial Site Visit after award, in accordance with PWS paragraph 1.3.3.

Please see attachments #2, #3 and #4 for information regarding measurements and specs.