Package 1 Drawing

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

warren.l.wade Text Box

5. Existing utilities shown on drawings are compiled from the best available information. However, the site plan may not be inclusive of all utilities and the depicted locations may not be accurate. The Contractor shall obtain and process a Fort Carson Facilities Engineer Dig Permit Request, FC Form 86-E, for each requirement that requires a dig permit in accordance with Fort Carson Regulation 420-20. Contractor shall obtain all required signatures on the outage request. The contractor shall verify the exact location of all indicated utility lines and structures on the dig permit and take necessary precautions to protect them. Should the contractor damage any such utility line or structure, the contractor shall be responsible for the prompt repair of that damage, at the contractor's expense. Centurylink will conduct needed repairs on Centurylink lines if encountered and damaged. The contractor shall contact the Contracting Officer and Government Inspector to report any damage and identify the contractor's repair. Forms shall be turned in to the Dig Permit Coordinator at Bldg. 1225, 1649 Evans St, Fort Carson, CO, 719-526-5345.

Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Callout

MILL FULL DEPTH BITUMINOUS PAVEMENT

warren.l.wade Callout

MILL FULL DEPTH BITUMINOUS PAVEMENT

warren.l.wade Line warren.l.wade Line

SUBGRADE SHALL BE SCARIFIED AND COMPACTED TO 95% MODIFIED PROCTOR.

warren.l.wade

95%

, TYP OF ALL TRANSITIONS

warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade

INSTALL 4 PULL BOXES 12' FROM EDGE OF ASPHALT WAY, ONE 2" RIGID CONDUIT, AND TWO 3" RIGID CONDUITS IAW CDOT STANDARD PLANS NO S-614-40&42 warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Callout

PLACE NEW PAVEMENT CS300 SERIES

warren.l.wade Callout

PLACE NEW PAVEMENT CS300 SERIES

warren.l.wade Text Box

, TYP OF ALL TRANSITIONS

warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade

INSTALL 4 PULL BOXES 12' FROM EDGE OF ASPHALT WAY, ONE 2" RIGID CONDUIT, AND TWO 3" RIGID CONDUITS IAW CDOT STANDARD PLANS NO S-614-40&42 warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade Line warren.l.wade

8'

FEATHER PAVEMENT OVER 2' TO

warren.l.wade

2'

3" warren.l.wade

2"

3" warren.l.wade Text Box

2" BPIC

warren.l.wade Text Box 3" warren.l.wade

2" BPIC

3" warren.l.wade Text Box

2" BPIC

warren.l.wade Text Box 3" warren.l.wade Text Box

2" BPIC

warren.l.wade Text Box 3" warren.l.wade

2" BPIC

TRANSITION SLOPE CHANGE OVER 4'

2" warren.l.wade Text Box 3" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade

3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade

3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade

3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade Text Box 2" warren.l.wade Text Box 3" warren.l.wade

TRANSITION SLOPE CHANGES OVER 4'

GENERAL
G-001 COVER
G-002 INDEX
G-003 ABBREVIATIONS
G-004 LEGEND
GI101 PROJECT LOCATION PLAN
GI701 PHASING PLAN - PHASE 1
GI702 PHASING PLAN - PHASE 2
GI703 PHASING PLAN - PHASE 3
GI704 PHASING PLAN - PHASE 4
GI705 PHASING PLAN - PHASE 5
GEOTECHNICAL
B-101 SOIL BORING LOCATION PLAN - SHEET 1
B-102 SOIL BORING LOCATION PLAN - SHEET 2
B-103 SOIL BORING LOCATION PLAN - SHEET 3
B-301 SOIL BORING LOGS - DRILL HOLES FC15-20 THROUGH FC15-25
B-302 SOIL BORING LOGS - DRILL HOLES FC15-26 THROUGH FC15-29
SITE/CIVIL
VF100 SURVEY PLAN - OVERVIEW
VF101 SURVEY PLAN - AREA 1
VF102 SURVEY PLAN - AREA 2
VF103 SURVEY PLAN - AREA 3
VF104 SURVEY PLAN - AREA 4
VF105 SURVEY PLAN - AREA 5
VF106 SURVEY PLAN - AREA 6
VF107 SURVEY PLAN - AREA 7
VF108 SURVEY PLAN - AREA 8
VF109 SURVEY PLAN - AREA 9
VF110 SURVEY PLAN - AREA 10
CD101 DEMOLITION PLAN - AREA 1
CD102 DEMOLITION PLAN - AREA 2
CD103 DEMOLITION PLAN - AREA 3
CD104 DEMOLITION PLAN - AREA 4
CD105 DEMOLITION PLAN - AREA 5
CD106 DEMOLITION PLAN - AREA 6
CD107 DEMOLITION PLAN - AREA 7
CD108 DEMOLITION PLAN - AREA 8
CD109 DEMOLITION PLAN - AREA 9
CD110 DEMOLITION PLAN - AREA 10
CS100 SITE AND PAVING PLAN - OVERVIEW
CS101 SITE AND PAVING PLAN - AREA 1
CS102 SITE AND PAVING PLAN - AREA 2
CS103 SITE AND PAVING PLAN - AREA 3
CS104 SITE AND PAVING PLAN - AREA 4
CS105 SITE AND PAVING PLAN - AREA 5
CS106 SITE AND PAVING PLAN - AREA 6
CS107 SITE AND PAVING PLAN - AREA 7
CS108 SITE AND PAVING PLAN - AREA 8
CS109 SITE AND PAVING PLAN - AREA 9
CS110 SITE AND PAVING PLAN - AREA 10
CS151 SIGNAGE AND STRIPING PLAN - AREA 1
CS152 SIGNAGE AND STRIPING PLAN - AREA 2
CS153 SIGNAGE AND STRIPING PLAN - AREA 3
CS154 SIGNAGE AND STRIPING PLAN - AREA 4
CS155 SIGNAGE AND STRIPING PLAN - AREA 5
CS156 SIGNAGE AND STRIPING PLAN - AREA 6
CS157 SIGNAGE AND STRIPING PLAN - AREA 7
CS158 SIGNAGE AND STRIPING PLAN - AREA 8
CS159 SIGNAGE AND STRIPING PLAN - AREA 9
CS160 SIGNAGE AND STRIPING PLAN - AREA 10
CS301 PAVEMENT TYPICAL SECTIONS
CS302 PAVEMENT TYPICAL SECTIONS
CS303 PAVING CROSS SECTIONS
CS304 PAVING CROSS SECTIONS
CS305 PAVING CROSS SECTIONS
CS306 PAVING CROSS SECTIONS
CS307 PAVING CROSS SECTIONS
CS308 PAVING CROSS SECTIONS
CS309 PAVING CROSS SECTIONS
CS310 PAVING CROSS SECTIONS
CS311 PAVING CROSS SECTIONS
CS312 PAVING CROSS SECTIONS
CS313 PAVING CROSS SECTIONS
CS501 SITE AND PAVING DETAILS
CS502 SIGNAGE DETAILS
CS503 STRIPING DETAILS
CS504 GUARDRAIL DETAILS
CS505 GUARDRAIL END TERMINAL DETAILS
CG104 GRADING AND DRAINAGE PLAN - AREA 4
CG105 GRADING AND DRAINAGE PLAN - AREA 5
CG106 GRADING AND DRAINAGE PLAN - AREA 6
CG107 GRADING AND DRAINAGE PLAN - AREA 7
CG108 GRADING AND DRAINAGE PLAN - AREA 8
CG201 BUTTS ROAD PLAN AND PROFILE - SHEET 1
CG202 BUTTS ROAD PLAN AND PROFILE - SHEET 2
CG203 CULVERT PROFILES
CG501 CULVERT DETAILS
CG502 TRENCH DRAIN DETAILS
CE104 SEDIMENT AND EROSION CONTROL PLAN - AREA 4
CE105 SEDIMENT AND EROSION CONTROL PLAN - AREA 5
CE106 SEDIMENT AND EROSION CONTROL PLAN - AREA 6
CE107 SEDIMENT AND EROSION CONTROL PLAN - AREA 7
CE108 SEDIMENT AND EROSION CONTROL PLAN - AREA 8
CE501 SEDIMENT AND EROSION CONTROL DETAILS

File details come from the government source that posted it. Updated .