Contractor Questions and Answers W911RX26QA024 March 26 2026.pdf

PDF 191 KB Posted

Attached to
BLDG 722 Electrical Installation - April 2026
Solicitation number
W911RX26QA024
Issued by

About this file

This is a Contractor Questions and Answers memorandum for federal contract solicitation W911RX26QA024 issued by the Department of the Army, Mission and Installation Contracting Command-Riley, 923rd Contracting Battalion at Fort Riley, Kansas on 26 March 2026.

The document addresses seven contractor inquiries regarding electrical and infrastructure specifications for Building 722. Key technical requirements include: a 300 Amp Panel powered by an external panel on the North wall, for which the contractor bears responsibility; suspended tracks with a ceiling height of 14 feet; cord reels requiring wire gauge capable of powering 20 Amps at up to 96% load on 60 hertz single phase power; and raceway routing through an existing ceiling approximately 25 feet high with suspended grid at 14 feet. Detailed building drawings are available as an attachment ("BLDG 722 Drawings"). The Point of Contact is Contract Specialist Noah W. Younger, reachable at (520) 714-8003 or noah.w.younger.civ@army.mil.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

MISSION AND INSTALLATION CONTRACTING COMMAND-RILEY

923rd CONTRACTING BATTALION Bldg. 1792 12TH STREET

FT RILEY, KS 66442

Reply To The Attention Of

CCMI-CHD-RL 26 March 2026

MEMORANDUM FOR RECORD

SUBJECT: Contractor Questions and answers, W911RX26QA024

The Point of Contact for this memorandum is Contract Specialist Noah W. Younger at (520) 714-8003 or noah.w.younger.civ@army.mil

1. How is the 300 Amp Panel to be powered?

a. There is a panel outside on the North wall that will provide the power.

2. Who is responsible for powering the 300 Amp Panel

a. The contractor is responsible

3. Is there a set of drawings?

a. Yes. Please see new attachment ‘BLDG 722 Drawings’

4. What is the ceiling height of the locations of the suspended tracks?

a. 14’.

5. What gauge wire is required for the cord reels? Is SO cord acceptable?

a. The gauge is required to power 20 Amps at up to 96% load

6. Single Phase or 3 Phase?

a. 60 hertz single phase

7. Will the raceway to the reels run through the drop ceilings, or is the ceiling open? Or is there a concrete ceiling? What is the height?

a. Existing ceiling is approximately 25’ and there is suspended grid at 14’