Amendment 2 Statement of Work.pdf

PDF 193 KB Posted

Attached to
Fort Riley Vertical Lifts Federal contract opportunity
Solicitation number
W911RX26QA014
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This is a Scope of Work for a federal construction project at DPTMS, Fort Riley, specifying the purchase and installation of two Vertical Lift Modules (VLMs) with a construction duration of 112-126 days. The contractor must provide all supervision, labor, materials, and equipment, including the demolition and disposal of two existing 17-foot tall Kardex Remstar SHUTTLE-XP-500 machines.

The VLMs must meet specific ergonomic and functional requirements, including modular construction with adjustable shelf spacing at 1-inch increments, a 5-year warranty covering transportation, parts, and labor, and an automatic security door. Each unit will contain 29 trays with varying capacities (452 lbs., 584 lbs., and 992 lbs.), reaching a maximum unit capacity of 24,696 lbs. Key specifications include overall dimensions of 20'2.13" height by 133.07" width by 120.98" depth, maximum lifting speed of 157.50 ft/min, maximum access time of 45 seconds, and 747 usable cubic feet of storage per unit. The equipment must comply with DIN EN 15095 standards and be supported by factory ISO 9001 and ISO 14001 certifications. Additionally, the contractor must provide 24-hour service turnaround through a factory-trained and authorized service office, with installation performed by qualified individuals and include a built-in service ladder. Power requirements are 208 volt/3 phase with operator controls located at an outside universal console.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Riley Vertical Lifts, newest first.
File Type Posted
Site visit roster.pdf PDF
W911RX26QA014P00002 Amendment to Fort Riley Vertical Lift.pdf PDF
Amendment 2 Questions and Answers v2.pdf PDF
W911RX26QA014P00001 Amendment to Fort Riley Vertical Lift.pdf PDF
Statement of Work.pdf PDF
Fort Riley Vertical Lifts CSS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

DPTMS, Fort Riley

1. PROJECT DATA:

TITLE: Purchase and Install 2 each Vertical Lift Modules

CONSTRUCTION DURATION: 112-126 days

2. GENERAL SCOPE:

The Contractor shall provide all supervision, labor, materials and equipment to purchase and install 2 Vertical Lift Modules to support this requirement. The contractor shall install the Vertical Lift Module storage system in Building. Contractor responsible to demo existing machines (2) & dispose of.

3. DETAILED REQUIREMENTS (Vertical Lifts):

• Vertical Lift shall be of Ergonomic Design

• All units must be modular construction, built up from the inside to allow for easy height upgrades.

• All components carry a 5 year warranty, including transportation, parts and labor.

• The extractor’s design shall eliminate tilting/skewing of shelves/containers during movement.

• The vertical lift must come with an automatic security door for safety and designed to prevent dirt and dust from entering the unit while not in operation.

• An operator station shall be provided that is easy to use, to store/retrieve stored parts. This can be a pendant or other easy to use keyboard/operator station. The system shall have soft starts and stops. The operator work surface height shall be approximately 33 inches, and have the ability to accommodate maximum media storage of 28.75”.

• The storage unit must have an ergonomic tray/tray delivery height selection from the operator console.

• Shelf spacing must be adjustable on approximate 1” increments to allow for maximum use of vertical space.

• The VLM’s shall accept Light, medium or heavy duty trays if required.

• Unit shall come with measures for extractor shaft to protect against obstructions during movement of extractor/lifting device.

• Self-monitoring full height LVS light curtain shall be installed at the operator access opening. This shall provide safety features that protect the operator from injury when the a shelf/container is moving. This feature shall stop the shelve/container from moving, when an operator’s hand/arm is in danger of injury.

Other safety features shall have redundant systems, and fail-safe overrides to ensure continuous operation and minimum system down time.

• Vertical Lift must have energy saving standby mode which switches all electrical consumers into “sleep” mode when not being used.

• Vertical Lift operator will be informed if a predefined overload is reached – early warning. If this limit is exceeded; the device will be positioned onto the next possible shelf – switch-off.

• Vertical Lift trays are held in the access opening so that it does not move during product loading or unloading

• The contractor must ensure the equipment complies with DIN EN 15095 “Power-operated mobile racking and shelving, carousels and storage lifts”.

• Factory must be certified ISO 9001.

• Manufacture must be certified ISO 14001.

• Contractor services shall be offered through an office that has a 24-hour turn-around time and must be assured and guaranteed on all requests for service.

• The installation and service must be performed by factory trained and authorized qualified individuals.

• Unit must have a built in service ladder.

• Contractor will be responsible to demo existing machines (2) and dispose of all dunnage.

• Existing machines: 17' tall (2) Kardex Remstar SHUTTLE-XP-500-3050x864-US

4. OVERALL EQUIPMENT SPECIFICATION:

Vertical Lift Module (VLM):

• Quantity of Units: 2

• Quantity of Trays: 29 per unit

• 25 trays – 452 Lbs. capacity

• 2 trays – 584 Lbs. capacity

• 2 trays - 992 Lbs. capacity

• Overall Unit Height: 20’2.13” (+/-) 2”

• Overall Unit Width: 133.07” (+/-) 2”

• Overall Unit Depth: 120.98” (+/-) 2”

• Overall Tray Size: 120.08” Width x 34” Depth

• Maximum Unit Capacity: 24,696 lbs.

• Maximum Lifting Speed: 157.50 ft/min

• Maximum Access Time: 45 seconds

• Power: 208 volt/3 phase

• Operator Controls Located: Outside Universal Console

• Usable Cubic Feet Of Storage: 747

• Automatic Extraction Table No

• Automatic Security Shutter Door: Yes

END SCOPE OF WORK